Sei sulla pagina 1di 116

SEQ. NO. ........................................

JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS E


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS E : EARTHWORKS

Phrase 3 Excavation for foundations

Phrase 4 Material other than topsoil, rock or artificial hard material DRAWING REF:

Phrase 5 maximum depth 0.25-0.5 m UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS E


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS E : EARTHWORKS

Phrase 3 Excavation for foundations

Phrase 4 Material other than topsoil, rock or artificial hard material DRAWING REF:

Phrase 5 maximum depth 0.5-1 m UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS E


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS E : EARTHWORKS

Phrase 3 Excavation for foundations

Phrase 4 Material other than topsoil, rock or artificial hard material DRAWING REF:

Phrase 5 maximum depth 1-2 m UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS E


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
Excavate for chamber pits and the
Phrase 2 CLASS E : EARTHWORKS like.

Phrase 3 General excavation

Phrase 4 Material other than topsoil, rock or artificial hard material DRAWING REF:

Phrase 5 maximum depth 2-5 m UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ..................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS E


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
Surfaces to receive permanent
Phrase 2 CLASS E : EARTHWORKS works.

Phrase 3 Excavation ancillaries

Phrase 4 Preparation of excavated surfaces DRAWING REF:

Phrase 5 material other than topsoil, rock or artificial hard material UNIT: M2
MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ....................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS E


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS E : EARTHWORKS

Phrase 3 Excavation ancillaries

Phrase 4 Disposal of excavated material DRAWING REF:

Phrase 5 material other than topsoil, rock or artificial hard material UNIT: M3
MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ..........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS E


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS E : EARTHWORKS

Phrase 3 Filling

Phrase 4 General DRAWING REF:

Phrase 5 imported natural material other than topsoil or rock UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ............................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS E


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS E : EARTHWORKS

Phrase 3 Filling ancillaries

Phrase 4 Trimming of filled surfaces DRAWING REF:

Phrase 5 generally UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ...........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS E


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS E : EARTHWORKS

Phrase 3 Filling ancillaries

Phrase 4 Preparation of filled surfaces DRAWING REF:

Phrase 5 generally UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Provision of concrete ordinary prescribed mix

Phrase 4 Grade C15; Portland cement to BS 12 DRAWING REF:

Phrase 5 20 mm aggregate UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Provision of concrete ordinary prescribed mix

Phrase 4 Grade C30; Portland cement to BS 12 DRAWING REF:

Phrase 5 20 mm aggregate UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .....................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
Special prescribed mix.
Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Provision of concrete special prescribed mix

Phrase 4 Grade C30; Portland cement to BS 12 for use in DRAWING REF:


watertight construction

Phrase 5 20 mm aggregate UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of mass concrete

Phrase 4 Blinding DRAWING REF:

Phrase 5 thickness not exceeding 150 mm UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Bases, footings, pilecaps and ground slabs DRAWING REF:

Phrase 5 thickness not exceeding 150 mm UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Bases, footings, pilecaps and ground slabs DRAWING REF:

Phrase 5 thickness 150-300 mm UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Suspended slabs DRAWING REF:

Phrase 5 thickness not exceeding 150 mm UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Suspended slabs DRAWING REF:

Phrase 5 thickness 150-300 mm UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Walls DRAWING REF:

Phrase 5 thickness 150-300 mm UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Walls DRAWING REF:

Phrase 5 thickness exceeding 500 mm UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
150 x 150mm to 300 x 300mm columns
Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Columns and piers DRAWING REF:

Phrase 5 cross-sectional area 0.03-0.1 m2 UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
350 x 350mm to 500 x 500mm columns
Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Columns and piers DRAWING REF:

Phrase 5 cross-sectional area 0.1-0.25 m2 UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
550 x 550mm to 1000 x 1000mm columns
Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Columns and piers DRAWING REF:

Phrase 5 cross-sectional area 0.25-1 m2 UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
200 x 400mm beams.
Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Beams DRAWING REF:

Phrase 5 cross-sectional area 0.03-0.1 m2 UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
250 x 500mm to 500 x 500mm beams.
Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Beams DRAWING REF:

Phrase 5 cross-sectional area 0.1-0.25 m2 UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
450 x 600mm to 1000 x 1000mm beams.
Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Beams DRAWING REF:

Phrase 5 cross-sectional area 0.25-1 m2 UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Benchings DRAWING REF:

Phrase 5 generally; as Drawing Nr. ……………………….. UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS F


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS F : IN SITU CONCRETE

Phrase 3 Placing of reinforced concrete

Phrase 4 Steps, stairs and landings DRAWING REF:

Phrase 5 generally; as Drawing Nr. ……………………….. UNIT: M3


MSD QTY: 0.00 M3
BILLED QTY: 0 M3
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 0.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TOTAL QTY 0.00
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
At floor slab risers and the like.
Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Horizontal DRAWING REF:

Phrase 5 width not exceeding 0.1 m; to upper surfaces UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Horizontal DRAWING REF:

Phrase 5 width 0.1-0.2 m UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Horizontal DRAWING REF:

Phrase 5 width 0.2-0.4 m UNIT: M2


MSD QTY: 0.00
BILLED QTY: 0
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
REMARKS:

M2
M2

Query Ref.
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Horizontal DRAWING REF:

Phrase 5 width 0.4-1.22 m UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Horizontal DRAWING REF:

Phrase 5 width exceeding 1.22 m UNIT: M2


MSD QTY: 0.00
BILLED QTY: 0
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
REMARKS:

M2
M2

Query Ref.
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Sloping DRAWING REF:

Phrase 5 width 0.4-1.22 m UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Vertical DRAWING REF:

Phrase 5 width 0.2-0.4 m UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Vertical DRAWING REF:

Phrase 5 width 0.4-1.22 m UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Vertical DRAWING REF:

Phrase 5 width exceeding 1.22 m UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Curved; to one radius in two planes; radius …… m DRAWING REF:

Phrase 5 width exceeding 1.22 m UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Voids DRAWING REF:

Phrase 5 small depth 0.5-1 m UNIT: NR


MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
Cross-sectional area n.e. 0.01 m2.
Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Formwork rough / fair finish

Phrase 4 Concrete components of constant cross-section DRAWING REF:

Phrase 5 25 x 25 mm chamfers; to upper surfaces UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0
SEQ. NO. .......................................
JOB NO: PAGE NO:
DATE:
PROJECT: Brunei-Muara-Tutong Water Supply Scheme
Stage 6 Phase 2 TAKER-OFF:

CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Reinforcement

Phrase 4 High yield steel bars to BS 4449 or BS 4461 DRAWING REF:

Phrase 5 nominal size 10 mm UNIT: KG


MSD QTY: 0.00 KG
BILLED QTY: 0.00 T
DIMENSIONS: * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

1 #DIV/0! 0.616 #DIV/0!


2 #DIV/0! 0.616 #DIV/0!
3 #DIV/0! 0.616 #DIV/0!
4 #DIV/0! 0.616 #DIV/0!
5 #DIV/0! 0.616 #DIV/0!
6 #DIV/0! 0.616 #DIV/0!
7 #DIV/0! 0.616 #DIV/0!
8 #DIV/0! 0.616 #DIV/0!
9 #DIV/0! 0.616 #DIV/0!
10 #DIV/0! 0.616 #DIV/0!
11
12
13 #DIV/0! #DIV/0!
14 #DIV/0! #DIV/0!
15 #DIV/0! #DIV/0!
16 #DIV/0! #DIV/0!
17 #DIV/0! #DIV/0!
18 #DIV/0! #DIV/0!
19 #DIV/0! #DIV/0!
20 #DIV/0! #DIV/0!
21
22
23 #DIV/0! #DIV/0!
24 #DIV/0! #DIV/0!
25 #DIV/0! #DIV/0!
26 #DIV/0! #DIV/0!
27
28
29 #DIV/0! #DIV/0!
30 #DIV/0! #DIV/0!
31 #DIV/0! #DIV/0!
32
33
34
35
36
37
38
39
40
41
42
43
SEQ. NO. .......................................
44
TOTAL QTY C/F #DIV/0!
JOB NO: PAGE NO:
DIMENSIONS (CONT'D): * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

TOTAL QTY B/F #DIV/0!

45 #DIV/0! #DIV/0!
46 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
48 #DIV/0! #DIV/0!
49 #DIV/0! #DIV/0!
50 #DIV/0! #DIV/0!
51 #DIV/0! #DIV/0!
52 #DIV/0! #DIV/0!
53 #DIV/0! #DIV/0!
54
55
56
57
58
59
60
61
62 #DIV/0! #DIV/0!
63 #DIV/0! #DIV/0!
64 #DIV/0! #DIV/0!
65 #DIV/0! #DIV/0!
66 #DIV/0! #DIV/0!
67 #DIV/0! #DIV/0!
68 #DIV/0! #DIV/0!
69 #DIV/0! #DIV/0!
70 #DIV/0! #DIV/0!
71 #DIV/0! #DIV/0!
72
73
74 #DIV/0! #DIV/0!
75 #DIV/0! #DIV/0!
76 #DIV/0! #DIV/0!
77 #DIV/0! #DIV/0!
78 #DIV/0! #DIV/0!
79 #DIV/0! #DIV/0!
80 #DIV/0! #DIV/0!
81 #DIV/0! #DIV/0!
82 #DIV/0! #DIV/0!
83 #DIV/0! #DIV/0!
84 #DIV/0! #DIV/0!
85 #DIV/0! #DIV/0!
86 #DIV/0! #DIV/0!
87 #DIV/0! #DIV/0!
88 #DIV/0! #DIV/0!
89 #DIV/0! #DIV/0!
90 #DIV/0! #DIV/0!
91 #DIV/0! #DIV/0!
92 #DIV/0! #DIV/0!
93 #DIV/0! #DIV/0!
94 #DIV/0! #DIV/0!
95 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
97 #DIV/0! #DIV/0!
98
99
100
101
102
103
104
105
106
107
108
SEQ. NO. .......................................
109
110
111
TOTAL QTY C/F #DIV/0!
JOB NO: PAGE NO: 1C
DIMENSIONS (CONT'D): * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

TOTAL QTY B/F #DIV/0!

112 #DIV/0! #DIV/0!


113 #DIV/0! #DIV/0!
114 #DIV/0! #DIV/0!
115 #DIV/0! #DIV/0!
116 #DIV/0! #DIV/0!
117 #DIV/0! #DIV/0!
118 #DIV/0! #DIV/0!
119 #DIV/0! #DIV/0!
120 #DIV/0! #DIV/0!
121 #DIV/0! #DIV/0!
122 #DIV/0! #DIV/0!
123 #DIV/0! #DIV/0!
124 #DIV/0! #DIV/0!
125 #DIV/0! #DIV/0!
126 #DIV/0! #DIV/0!
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
SEQ. NO. .......................................

TOTAL QTY #DIV/0!


SEQ. NO. ..........................................
JOB NO: PAGE NO:
DATE:
PROJECT: Brunei-Muara-Tutong Water Supply Scheme
Stage 6 Phase 2 TAKER-OFF:

CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Reinforcement

Phrase 4 High yield steel bars to BS 4449 or BS 4461 DRAWING REF:

Phrase 5 nominal size 12 mm UNIT: KG


MSD QTY: 0.00 KG
BILLED QTY: 0.00 T
DIMENSIONS: * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

1 #DIV/0! 0.888 #DIV/0!


2 #DIV/0! 0.888 #DIV/0!
3 #DIV/0! 0.888 #DIV/0!
4 #DIV/0! 0.888 #DIV/0!
5 #DIV/0! 0.888 #DIV/0!
6 #DIV/0! 0.888 #DIV/0!
7 #DIV/0! 0.888 #DIV/0!
8 #DIV/0! 0.888 #DIV/0!
9 #DIV/0! 0.888 #DIV/0!
10 #DIV/0! 0.888 #DIV/0!
11
12
13 #DIV/0! #DIV/0!
14 #DIV/0! #DIV/0!
15 #DIV/0! #DIV/0!
16 #DIV/0! #DIV/0!
17 #DIV/0! #DIV/0!
18 #DIV/0! #DIV/0!
19 #DIV/0! #DIV/0!
20 #DIV/0! #DIV/0!
21
22
23 #DIV/0! #DIV/0!
24 #DIV/0! #DIV/0!
25 #DIV/0! #DIV/0!
26 #DIV/0! #DIV/0!
27
28
29 #DIV/0! #DIV/0!
30 #DIV/0! #DIV/0!
31 #DIV/0! #DIV/0!
32
33
34
35
36
37
38
39
40
41
42
43
SEQ. NO. ..........................................
44
TOTAL QTY C/F #DIV/0!
JOB NO: PAGE NO:
DIMENSIONS (CONT'D): * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

TOTAL QTY B/F #DIV/0!

45 #DIV/0! #DIV/0!
46 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
48 #DIV/0! #DIV/0!
49 #DIV/0! #DIV/0!
50 #DIV/0! #DIV/0!
51 #DIV/0! #DIV/0!
52 #DIV/0! #DIV/0!
53 #DIV/0! #DIV/0!
54
55
56
57
58
59
60
61
62 #DIV/0! #DIV/0!
63 #DIV/0! #DIV/0!
64 #DIV/0! #DIV/0!
65 #DIV/0! #DIV/0!
66 #DIV/0! #DIV/0!
67 #DIV/0! #DIV/0!
68 #DIV/0! #DIV/0!
69 #DIV/0! #DIV/0!
70 #DIV/0! #DIV/0!
71 #DIV/0! #DIV/0!
72
73
74 #DIV/0! #DIV/0!
75 #DIV/0! #DIV/0!
76 #DIV/0! #DIV/0!
77 #DIV/0! #DIV/0!
78 #DIV/0! #DIV/0!
79 #DIV/0! #DIV/0!
80 #DIV/0! #DIV/0!
81 #DIV/0! #DIV/0!
82 #DIV/0! #DIV/0!
83 #DIV/0! #DIV/0!
84 #DIV/0! #DIV/0!
85 #DIV/0! #DIV/0!
86 #DIV/0! #DIV/0!
87 #DIV/0! #DIV/0!
88 #DIV/0! #DIV/0!
89 #DIV/0! #DIV/0!
90 #DIV/0! #DIV/0!
91 #DIV/0! #DIV/0!
92 #DIV/0! #DIV/0!
93 #DIV/0! #DIV/0!
94 #DIV/0! #DIV/0!
95 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
97 #DIV/0! #DIV/0!
98
99
100
101
102
103
104
105
106
107
108
SEQ. NO. ..........................................
109
110
111
TOTAL QTY C/F #DIV/0!
JOB NO: PAGE NO: 1C
DIMENSIONS (CONT'D): * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

TOTAL QTY B/F #DIV/0!

112 #DIV/0! #DIV/0!


113 #DIV/0! #DIV/0!
114 #DIV/0! #DIV/0!
115 #DIV/0! #DIV/0!
116 #DIV/0! #DIV/0!
117 #DIV/0! #DIV/0!
118 #DIV/0! #DIV/0!
119 #DIV/0! #DIV/0!
120 #DIV/0! #DIV/0!
121 #DIV/0! #DIV/0!
122 #DIV/0! #DIV/0!
123 #DIV/0! #DIV/0!
124 #DIV/0! #DIV/0!
125 #DIV/0! #DIV/0!
126 #DIV/0! #DIV/0!
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
SEQ. NO. ..........................................

TOTAL QTY #DIV/0!


SEQ. NO. .....................................
JOB NO: PAGE NO:
DATE:
PROJECT: Brunei-Muara-Tutong Water Supply Scheme
Stage 6 Phase 2 TAKER-OFF:

CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Reinforcement

Phrase 4 High yield steel bars to BS 4449 or BS 4461 DRAWING REF:

Phrase 5 nominal size 16 mm UNIT: KG


MSD QTY: 0.00 KG
BILLED QTY: 0.00 T
DIMENSIONS: * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

1 #DIV/0! 1.579 #DIV/0!


2 #DIV/0! 1.579 #DIV/0!
3 #DIV/0! 1.579 #DIV/0!
4 #DIV/0! 1.579 #DIV/0!
5 #DIV/0! 1.579 #DIV/0!
6 #DIV/0! 1.579 #DIV/0!
7 #DIV/0! 1.579 #DIV/0!
8 #DIV/0! 1.579 #DIV/0!
9 #DIV/0! 1.579 #DIV/0!
10 #DIV/0! 1.579 #DIV/0!
11
12
13 #DIV/0! #DIV/0!
14 #DIV/0! #DIV/0!
15 #DIV/0! #DIV/0!
16 #DIV/0! #DIV/0!
17 #DIV/0! #DIV/0!
18 #DIV/0! #DIV/0!
19 #DIV/0! #DIV/0!
20 #DIV/0! #DIV/0!
21
22
23 #DIV/0! #DIV/0!
24 #DIV/0! #DIV/0!
25 #DIV/0! #DIV/0!
26 #DIV/0! #DIV/0!
27
28
29 #DIV/0! #DIV/0!
30 #DIV/0! #DIV/0!
31 #DIV/0! #DIV/0!
32
33
34
35
36
37
38
39
40
41
42
43
SEQ. NO. .....................................
44
TOTAL QTY C/F #DIV/0!
JOB NO: PAGE NO:
DIMENSIONS (CONT'D): * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

TOTAL QTY B/F #DIV/0!

45 #DIV/0! #DIV/0!
46 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
48 #DIV/0! #DIV/0!
49 #DIV/0! #DIV/0!
50 #DIV/0! #DIV/0!
51 #DIV/0! #DIV/0!
52 #DIV/0! #DIV/0!
53 #DIV/0! #DIV/0!
54
55
56
57
58
59
60
61
62 #DIV/0! #DIV/0!
63 #DIV/0! #DIV/0!
64 #DIV/0! #DIV/0!
65 #DIV/0! #DIV/0!
66 #DIV/0! #DIV/0!
67 #DIV/0! #DIV/0!
68 #DIV/0! #DIV/0!
69 #DIV/0! #DIV/0!
70 #DIV/0! #DIV/0!
71 #DIV/0! #DIV/0!
72
73
74 #DIV/0! #DIV/0!
75 #DIV/0! #DIV/0!
76 #DIV/0! #DIV/0!
77 #DIV/0! #DIV/0!
78 #DIV/0! #DIV/0!
79 #DIV/0! #DIV/0!
80 #DIV/0! #DIV/0!
81 #DIV/0! #DIV/0!
82 #DIV/0! #DIV/0!
83 #DIV/0! #DIV/0!
84 #DIV/0! #DIV/0!
85 #DIV/0! #DIV/0!
86 #DIV/0! #DIV/0!
87 #DIV/0! #DIV/0!
88 #DIV/0! #DIV/0!
89 #DIV/0! #DIV/0!
90 #DIV/0! #DIV/0!
91 #DIV/0! #DIV/0!
92 #DIV/0! #DIV/0!
93 #DIV/0! #DIV/0!
94 #DIV/0! #DIV/0!
95 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
97 #DIV/0! #DIV/0!
98
99
100
101
102
103
104
105
106
107
108
SEQ. NO. .....................................
109
110
111
TOTAL QTY C/F #DIV/0!
JOB NO: PAGE NO: 1C
DIMENSIONS (CONT'D): * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

TOTAL QTY B/F #DIV/0!

112 #DIV/0! #DIV/0!


113 #DIV/0! #DIV/0!
114 #DIV/0! #DIV/0!
115 #DIV/0! #DIV/0!
116 #DIV/0! #DIV/0!
117 #DIV/0! #DIV/0!
118 #DIV/0! #DIV/0!
119 #DIV/0! #DIV/0!
120 #DIV/0! #DIV/0!
121 #DIV/0! #DIV/0!
122 #DIV/0! #DIV/0!
123 #DIV/0! #DIV/0!
124 #DIV/0! #DIV/0!
125 #DIV/0! #DIV/0!
126 #DIV/0! #DIV/0!
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
SEQ. NO. .....................................

TOTAL QTY #DIV/0!


SEQ. NO. .....................................
JOB NO: PAGE NO:
DATE:
PROJECT: Brunei-Muara-Tutong Water Supply Scheme
Stage 6 Phase 2 TAKER-OFF:

CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Reinforcement

Phrase 4 High yield steel bars to BS 4449 or BS 4461 DRAWING REF:

Phrase 5 nominal size 32 mm or greater UNIT: KG


MSD QTY: 0.00 KG
BILLED QTY: 0.00 T
DIMENSIONS: * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

1 #DIV/0! #DIV/0!
2 #DIV/0! #DIV/0!
3 #DIV/0! #DIV/0!
4 #DIV/0! #DIV/0!
5 #DIV/0! #DIV/0!
6 #DIV/0! #DIV/0!
7 #DIV/0! #DIV/0!
8 #DIV/0! #DIV/0!
9 #DIV/0! #DIV/0!
10 #DIV/0! #DIV/0!
11
12
13 #DIV/0! #DIV/0!
14 #DIV/0! #DIV/0!
15 #DIV/0! #DIV/0!
16 #DIV/0! #DIV/0!
17 #DIV/0! #DIV/0!
18 #DIV/0! #DIV/0!
19 #DIV/0! #DIV/0!
20 #DIV/0! #DIV/0!
21
22
23 #DIV/0! #DIV/0!
24 #DIV/0! #DIV/0!
25 #DIV/0! #DIV/0!
26 #DIV/0! #DIV/0!
27
28
29 #DIV/0! #DIV/0!
30 #DIV/0! #DIV/0!
31 #DIV/0! #DIV/0!
32
33
34
35
36
37
38
39
40
41
42
43
SEQ. NO. .....................................
44
TOTAL QTY C/F #DIV/0!
JOB NO: PAGE NO:
DIMENSIONS (CONT'D): * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

TOTAL QTY B/F #DIV/0!

45 #DIV/0! #DIV/0!
46 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
48 #DIV/0! #DIV/0!
49 #DIV/0! #DIV/0!
50 #DIV/0! #DIV/0!
51 #DIV/0! #DIV/0!
52 #DIV/0! #DIV/0!
53 #DIV/0! #DIV/0!
54
55
56
57
58
59
60
61
62 #DIV/0! #DIV/0!
63 #DIV/0! #DIV/0!
64 #DIV/0! #DIV/0!
65 #DIV/0! #DIV/0!
66 #DIV/0! #DIV/0!
67 #DIV/0! #DIV/0!
68 #DIV/0! #DIV/0!
69 #DIV/0! #DIV/0!
70 #DIV/0! #DIV/0!
71 #DIV/0! #DIV/0!
72
73
74 #DIV/0! #DIV/0!
75 #DIV/0! #DIV/0!
76 #DIV/0! #DIV/0!
77 #DIV/0! #DIV/0!
78 #DIV/0! #DIV/0!
79 #DIV/0! #DIV/0!
80 #DIV/0! #DIV/0!
81 #DIV/0! #DIV/0!
82 #DIV/0! #DIV/0!
83 #DIV/0! #DIV/0!
84 #DIV/0! #DIV/0!
85 #DIV/0! #DIV/0!
86 #DIV/0! #DIV/0!
87 #DIV/0! #DIV/0!
88 #DIV/0! #DIV/0!
89 #DIV/0! #DIV/0!
90 #DIV/0! #DIV/0!
91 #DIV/0! #DIV/0!
92 #DIV/0! #DIV/0!
93 #DIV/0! #DIV/0!
94 #DIV/0! #DIV/0!
95 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
97 #DIV/0! #DIV/0!
98
99
100
101
102
103
104
105
106
107
108
SEQ. NO. .....................................
109
110
111
TOTAL QTY C/F #DIV/0!
JOB NO: PAGE NO: 1C
DIMENSIONS (CONT'D): * * *
Reinft. Location Reinft Qty. Nr. Of
Line Length Spacing Length Nr./Location Location Timesing Kg/m Quantity Location Query Ref.

TOTAL QTY B/F #DIV/0!

112 #DIV/0! #DIV/0!


113 #DIV/0! #DIV/0!
114 #DIV/0! #DIV/0!
115 #DIV/0! #DIV/0!
116 #DIV/0! #DIV/0!
117 #DIV/0! #DIV/0!
118 #DIV/0! #DIV/0!
119 #DIV/0! #DIV/0!
120 #DIV/0! #DIV/0!
121 #DIV/0! #DIV/0!
122 #DIV/0! #DIV/0!
123 #DIV/0! #DIV/0!
124 #DIV/0! #DIV/0!
125 #DIV/0! #DIV/0!
126 #DIV/0! #DIV/0!
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
SEQ. NO. .....................................

TOTAL QTY #DIV/0!


SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Reinforcement

Phrase 4 High yield steel fabric to BS 4483 DRAWING REF:

Phrase 5 nominal mass * kg/m2; type number * UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0
SEQ. NO. .....................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Joints

Phrase 4 Formed surface with 25 mm thick resin bonded cork joint DRAWING REF:
filler; pointing with 25 x 25 mm polysulphide sealant

Phrase 5 width not exceeding 0.5 m UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0
SEQ. NO. ..........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Joints

Phrase 4 Plastic or rubber (Metal) waterstops DRAWING REF:

Phrase 5 width 150-200 mm UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Joints

Phrase 4 Dowels DRAWING REF:

Phrase 5 plain or greased; * mm long cast into one side of joint UNIT: NR
and debonding for a length of * mm MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. .....................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Joints

Phrase 4 Dowels DRAWING REF:

sleeved or capped; * mm long cast into one side of joint


Phrase 5 and debonding for a length of * mm and capped with PVC UNIT: NR
dowel caps MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. ......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Concrete accessories

Phrase 4 Finishing of top surfaces; cement and sand (1:3) screed DRAWING REF:

Phrase 5 50 mm thick UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .....................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS G


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS G : CONCRETE ANCILLARIES

Phrase 3 Concrete accessories

Phrase 4 Inserts; * mm diameter UPVC pipe * mm long DRAWING REF:

Phrase 5 generally; through reinforced walls UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS H


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS H : PRECAST CONCRETE

Phrase 3 Lintols; ordinary prescribed mix Grade 30 Portland cement


to BS 12 20 mm aggregate; reinforced with * nrs. * mm
diameter high tensile bars
DRAWING REF:
Phrase 4 Cross-sectional size * x * mm

Phrase 5 generally UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS N


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS N : MISCELLANEOUS METALWORK

Phrase 3 Hot-dipped galvanised mild steel

Phrase 4 Plate flooring; chequer plates; * mm thick x * mm long DRAWING REF:


sections

Phrase 5 generally UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ....................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS N


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS N : MISCELLANEOUS METALWORK

Phrase 3 Hot-dipped galvanised mild steel

Phrase 4 Miscellaneous framing; * x * x * mm thick DRAWING REF:

Phrase 5 angle section; including * mm diameter reinforcing bars UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS N


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS N : MISCELLANEOUS METALWORK

Phrase 3 Natural anodised aluminium

Phrase 4 Louvred doors; frames and approved ironmongery DRAWING REF:

Phrase 5 structural opening size * x * mm high; door type * UNIT: NR


MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS N


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS N : MISCELLANEOUS METALWORK

Phrase 3 Natural anodised aluminium

Phrase 4 Glazed doors; tinted float glass 6 mm thick; frames and DRAWING REF:
approved ironmongery

Phrase 5 structural opening size * x * mm high; double-leaf; UNIT: NR


door type * MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. ...................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS N


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS N : MISCELLANEOUS METALWORK

Phrase 3 Natural anodised aluminium

Phrase 4 `Gliderol' or other equal and approved roller shutters; DRAWING REF:
installed in strict accordance to Manufacturer's
instructions

Phrase 5 structural opening size * x * mm high; UNIT: NR


door type * MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS O


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS O : TIMBER

Hardwood framings; structural and carcassing timber;


Phrase 3 strength Group B; pre-treated to PBD 8:1993

Phrase 4 Cross-sectional area not exceeding 0.01 m2; DRAWING REF:


size 50 x 50 mm members

Phrase 5 ceiling framing and hangers (measured flat overall) UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS O


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS O : TIMBER

Hardwood framings; structural and carcassing timber;


Phrase 3 strength Group B; pre-treated to PBD 8:1993

Phrase 4 Cross-sectional area not exceeding 0.01 m2; size DRAWING REF:
150 x 50 mm

Phrase 5 wall plates; including * diameter heavy duty bolts UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS O


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS O : TIMBER

Hardwood trusses; structural and carcassing timber;


Phrase 3 strength Group B; pre-treated to PBD 8:1993

Cross-sectional area not exceeding 0.01 m2; size


Phrase 4 150 x 50 mm and 50 x 50 mm members DRAWING REF:

roof trusses including `Multinail' or other equal and approved


Phrase 5 truss plate system; * mm span x * mm high; as UNIT: NR
Drawing Nr. HAHD-* MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS O


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS O : TIMBER

Phrase 3 Joinery; Kapor timber pre-treated to PBD 8:1993

Phrase 4 Cross-sectional area not exceeding 0.01 m2; DRAWING REF:


size 75 x 50 mm

Phrase 5 grounds UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS O


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS O : TIMBER

Joinery components; Kapor timber pre-treated to PBD 8:1993;


Phrase 3 wrought finish

Phrase 4 Cross-sectional area not exceeding 0.01 m2; DRAWING REF:


size 150 x 50 mm

Phrase 5 door frames UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS O


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS O : TIMBER

Joinery components; Kapor timber pre-treated to PBD 8:1993;


Phrase 3 wrought finish

Phrase 4 Cross-sectional area not exceeding 0.01 m2; DRAWING REF:


size 75 x 25 mm

Phrase 5 architraves UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS O


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS O : TIMBER

Phrase 3 Joinery components; Kapor timber pre-treated to PBD 8:1993;


wrought finish

DRAWING REF:
Phrase 4 Louvred doors

Phrase 5 size * x * mm high; door type * UNIT: NR


MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS O


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS O : TIMBER

Phrase 3 Fittings and fastenings; `Union' or other equal and


approved ironmongery

DRAWING REF:
Phrase 4 Hinges; heavy duty

Phrase 5 generally UNIT: NR


MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS O


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS O : TIMBER

Phrase 3 Fittings and fastenings; `Union' or other equal and


approved ironmongery

DRAWING REF:
Phrase 4 Locksets and knobsets

Phrase 5 generally UNIT: NR


MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS O


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS O : TIMBER

Phrase 3 Fittings and fastenings; `Union' or other equal and


approved ironmongery

DRAWING REF:
Phrase 4 Door closers; heavy duty

Phrase 5 generally UNIT: NR


MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS P


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
Supply initial piles.
Phrase 2 CLASS P : PILES

Phrase 3 Preformed concrete piles; Commencing Surface bottom of


pilecaps

Phrase 4 Cross-sectional area 0.1-0.15 m2; circular diameter * mm DRAWING REF:

Phrase 5 supply length of piles * m long; including approved UNIT: NR


driving heads and shoes MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. .....................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS P


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
Driving intial & extension piles.
Phrase 2 CLASS P : PILES

Phrase 3 Preformed concrete piles; Commencing Surface bottom of


pilecaps

Phrase 4 Cross-sectional area 0.1-0.15 m2; circular diameter * mm DRAWING REF:

Phrase 5 depth driven UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS Q


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
Supply extension piles.
Phrase 2 CLASS Q : PILING ANCILLARIES

Phrase 3 Preformed concrete piles; Commencing Surface bottom of


pilecaps

Phrase 4 Length of pile extensions DRAWING REF:

Phrase 5 cross-sectional area 0.1-0.15 m2; circular diameter * mm UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS Q


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
Splicing or jointing initial piles to
Phrase 2 CLASS Q : PILING ANCILLARIES extension piles.

Phrase 3 Preformed concrete piles; Commencing Surface bottom of


pilecaps

Phrase 4 Number of pile extensions DRAWING REF:

Phrase 5 cross-sectional area 0.1-0.15 m2; circular diameter * mm UNIT: NR


MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS Q


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS Q : PILING ANCILLARIES

Phrase 3 Preformed concrete piles; Commencing Surface bottom of


pilecaps

Phrase 4 Preparing heads; including * nrs. * mm diameter DRAWING REF:


HT starter bars and * mm thick mild steel plate

Phrase 5 cross-sectional area 0.1-0.15 m2; circular diameter * mm UNIT: NR


MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS Q


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS Q : PILING ANCILLARIES

Phrase 3 Pile tests

Phrase 4 Preformed concrete piles; Commencing Surface bottom of DRAWING REF:


pilecaps

Phrase 5 test loads 300-400 t UNIT: NR


MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. ......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS U


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS U : BRICKWORK, BLOCKWORK AND MASONRY

Phrase 3 Common brickwork; in cement mortar (1:3); `Exmet'


joint reinforcement; galvanised steel ties

Phrase 4 Thickness 102.5 mm DRAWING REF:

Phrase 5 vertical straight walls UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ..........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS U


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS U : BRICKWORK, BLOCKWORK AND MASONRY

Phrase 3 Precast concrete ventilation blockwork; in cement mortar


(1:3); `Exmet' joint reinforcement; galvanised steel ties

Phrase 4 Thickness 150 mm DRAWING REF:

Phrase 5 vertical straight walls UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS V


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS V : PAINTING

Phrase 3 Approved primer paint; in two coats

Phrase 4 Timber; backs of joinery components DRAWING REF:

Phrase 5 surfaces of width not exceeding 300 mm UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. .........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS V


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS V : PAINTING

Phrase 3 Approved alkyd gloss paint; in three coats

Phrase 4 Timber DRAWING REF:

Phrase 5 surfaces of width not exceeding 300 mm -1 m UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. ......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS V


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS V : PAINTING

Phrase 3 Approved alkyd gloss paint; in three coats

Phrase 4 Timber DRAWING REF:

Phrase 5 generally UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ........................................

JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS V


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS V : PAINTING

Phrase 3 `Weathershield' or other equal and approved exterior use


emulsion paint; in three coats

Phrase 4 Brickwork and blockwork; surface plastered (measured DRAWING REF:


separately)

Phrase 5 surfaces inclined at an angle exceeding 60 degrees UNIT: M2


to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS V


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS V : PAINTING

Phrase 3 `Weathershield' or other equal and approved exterior use


emulsion paint; in three coats

Phrase 4 Cement boards DRAWING REF:

Phrase 5 soffit surfaces and lower surfaces inclined at an angle not UNIT: M2
exceeding 60 degrees to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .....................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS V


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS V : PAINTING

Phrase 3 `ICI' or other equal and approved internal use


emulsion paint; in three coats

Phrase 4 Brickwork and blockwork; surface plastered (measured DRAWING REF:


separately)

Phrase 5 surfaces inclined at an angle exceeding 60 degrees UNIT: M2


to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS V


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS V : PAINTING

Phrase 3 `ICI' or other equal and approved internal use


emulsion paint; in three coats

Phrase 4 Gypsum boards DRAWING REF:

Phrase 5 soffit surfaces and lower surfaces inclined at an angle not UNIT: M2
exceeding 60 degrees to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1
Waterproofing tops of surfaces.
Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Tanking

Phrase 4 Waterproof coating; two coats polymer-modified DRAWING REF:


cementitious material 1.5 kg/m2 per coat

Phrase 5 upper surfaces inclined at an angle not exceeding 30 UNIT: M2


degrees to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Tanking

Phrase 4 Waterproof coating; two coats polymer-modified cementitious DRAWING REF:


material 1.5 kg/m2 per coat

Phrase 5 surfaces inclined at an angle exceeding 60 degrees UNIT: M2


to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Roofing

Phrase 4 Sheet metal; profiled Colorbond coated `Kliplok' or other DRAWING REF:
equal and approved steel sheet decking 0.60 mm thick

Phrase 5 upper surfaces inclined at an angle not exceeding 30 UNIT: M2


degrees to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Roofing

Phrase 4 Sheet metal; profiled Colorbond coated `Kliplok' or other DRAWING REF:
equal and approved steel sheet decking 0.60 mm thick

Phrase 5 standard ridge capping UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Roofing

Phrase 4 Sheet metal; profiled Colorbond coated `Kliplok' or other DRAWING REF:
equal and approved steel sheet decking 0.60 mm thick

Phrase 5 standard hip capping UNIT: M


MSD QTY: 0.00 M
BILLED QTY: 0 M
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
SEQ. NO. ...................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Insulation

Phrase 4 Quilts; fibreglass wool * kg/m2; * mm thick DRAWING REF:

Phrase 5 upper surfaces inclined at an angle not exceeding 30 UNIT: M2


degrees to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Insulation

Phrase 4 Sheeting; `Sisalation' or other equal and approved double DRAWING REF:
sided aluminium foil

Phrase 5 upper surfaces inclined at an angle not exceeding 30 UNIT: M2


degrees to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Insulation

Phrase 4 Mesh; 25 x 25 mm 19 Gauge chicken wire DRAWING REF:

Phrase 5 upper surfaces inclined at an angle not exceeding 30 UNIT: M2


degrees to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Protective layers

Phrase 4 Sand and cement plastering; mix (1:6) gauged with DRAWING REF:
plasticiser; 20 mm thick

Phrase 5 surfaces inclined at an angle exceeding 60 degrees UNIT: M2


to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Protective layers

Phrase 4 Ceramic tiles; * x * x * mm thick; joints 6 mm wide; DRAWING REF:


approved tile adhesive; including screeded sand and cement
(1:3) beds or backings 30 mm thick; pointing and grouting

Phrase 5 upper surfaces inclined at an angle not exceeding 30 UNIT: M2


degrees to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Protective layers

Phrase 4 Ceramic tiles; * x * x * mm thick; joints 6 mm wide; DRAWING REF:


approved tile adhesive; including screeded sand and cement
(1:3) beds or backings 30 mm thick; pointing and grouting

Phrase 5 surfaces of width not exceeding 300 mm UNIT: M


MSD QTY: 0.00
BILLED QTY: 0
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation

1 - - 0.00
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
TOTAL QTY 0.00
REMARKS:

M
M

Query Ref.
SEQ. NO. ........................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Protective layers

Phrase 4 Ceramic tiles; * x * x * mm thick; joints 6 mm wide; DRAWING REF:


approved tile adhesive; including screeded sand and cement
(1:3) beds or backings 20 mm thick; pointing and grouting

Phrase 5 surfaces inclined at an angle exceeding 60 degrees UNIT: M2


to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Protective layers

Phrase 4 Cement boards; `UAC Duravent' or other equal and approved; DRAWING REF:
5 mm thick

Phrase 5 soffit surfaces and lower surfaces inclined at an angle not UNIT: M2
exceeding 60 degrees to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ......................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS W


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS W : WATERPROOFING

Phrase 3 Protective layers

Phrase 4 Gypsum boards; 9 mm thick DRAWING REF:

Phrase 5 soffit surfaces and lower surfaces inclined at an angle not UNIT: M2
exceeding 60 degrees to the horizontal MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00