Sei sulla pagina 1di 1
Table 7-1. Performance Verification intervals Service Action Performed Performance Verification Test Requirements ‘Whenever J11 is disconnected ‘Test 16 (steps 3-5) 2,500 hour preventive maintenance Alltests 70,000-hour preventive maintenance Alltests a Replacement of proportional solenoid Alltests valve assembly Replacement of safety valve Alltests Replacement of REG 1/REG2 Tests 2, 3, 9, and 10 (steps 1-12) Replacement of REGS Tests 2, 3, 9, and 10 (steps 13-27) Replacement of REGS Tests 2, 3, and 15 Replacement of Q4/T1 or Q2/T2 Tests 2, 3, 12, and 14 {one flow sensor only) Replacement of Q3/T3 Tests 2 and Replacement of more than one Alltests flow sensor Replacement of pressure transducer PCB Tests 2, 3, and 12 Replacement of pneumatic chassis assemby | All tests Replacement of compressor Tests 1-3, 9 (steps 1-7), and 10 (steps: 14.27) Replacement of power supply assembly __| Tests 13 and 7 Replacement of any ac components Tests 1-3 and 7 Replacement of any other components Tests 13 Table 7-2. Test Equipment Required for Performance Verification Description Manufacturer/Model Electrical safety tester BIO-TEK Model 501 PRO or equivalent Pneumatic calibration analyzer capable of | Timeter Corporation AT200 measuring high pressure (psi), low NOTE pressure (mH0 digital display), low rate | aithou igh an RT-200 is required to een) test BTPS volume and ATP flow, pressure gauges may be used for other pneumatic testing. ‘Oxygen analyzer accurate to =2% 7820 Oxygen Monitor {PIN 4-020930-00) or equivalent Digital multimeter (OMM) accurate to three | Local supplier decimal places 72 31052 H (10195)

Potrebbero piacerti anche