Table 7-1. Performance Verification intervals
Service Action Performed Performance Verification Test
Requirements
‘Whenever J11 is disconnected ‘Test 16 (steps 3-5)
2,500 hour preventive maintenance Alltests
70,000-hour preventive maintenance Alltests a
Replacement of proportional solenoid Alltests
valve assembly
Replacement of safety valve Alltests
Replacement of REG 1/REG2 Tests 2, 3, 9, and 10 (steps 1-12)
Replacement of REGS Tests 2, 3, 9, and 10 (steps 13-27)
Replacement of REGS Tests 2, 3, and 15
Replacement of Q4/T1 or Q2/T2 Tests 2, 3, 12, and 14
{one flow sensor only)
Replacement of Q3/T3 Tests 2 and
Replacement of more than one Alltests
flow sensor
Replacement of pressure transducer PCB Tests 2, 3, and 12
Replacement of pneumatic chassis assemby | All tests
Replacement of compressor Tests 1-3, 9 (steps 1-7), and 10 (steps:
14.27)
Replacement of power supply assembly __| Tests 13 and 7
Replacement of any ac components Tests 1-3 and 7
Replacement of any other components Tests 13
Table 7-2. Test Equipment Required for Performance Verification
Description Manufacturer/Model
Electrical safety tester BIO-TEK Model 501 PRO or equivalent
Pneumatic calibration analyzer capable of | Timeter Corporation AT200
measuring high pressure (psi), low NOTE
pressure (mH0 digital display), low rate | aithou
igh an RT-200 is required to
een) test BTPS volume and ATP flow,
pressure gauges may be used for
other pneumatic testing.
‘Oxygen analyzer accurate to =2% 7820 Oxygen Monitor
{PIN 4-020930-00) or equivalent
Digital multimeter (OMM) accurate to three | Local supplier
decimal places
72 31052 H (10195)