Al Heeya Works LLC

#1003, OPAL Tower, Business Bay


P.O. Box 334102, Dubai, U.A.E
Tel: +971 (0) 4 454 2033
Fax: +971 (0) 4 454 2034
www.heeyaworks.com

Prepared by : Mohammed Ejas Document No. : HW-CH-MEP-P000-0618-00


Department : Project Design & Engineering Date : (Enter date)
Subject : MEP CHECKLIST (CH) Project : (Enter project name / no.)

MEP CHECKLIST
Checked in
Compliance at site
drawing
Sl.No Key Design checks Notes/Remarks
Partially
Yes No N/A Yes No N/A
done
01- Electrical Works
1.1 Floor Box Location □ □ □ □ □ □ □
Power Sockets Location and
1.2
Installation Height
□ □ □ □ □ □ □
Light Fixtures Location and
1.3
Installation Height
□ □ □ □ □ □ □
1.4 Light Switches Locations □ □ □ □ □ □ □
Materials used as per
1.5
specifications/approval
□ □ □ □ □ □ □
1.6 Location of DB/SMDB □ □ □ □ □ □ □
02- HVAC Works
Requirement of Additional VAV/AC
2.1
unit for individual offices
□ □ □ □ □ □ □
2.2 Location of Thermostats □ □ □ □ □ □ □
Location of AC grilles as per design
2.3
and requirements
□ □ □ □ □ □ □
Working condition of existing A/C
2.4
units
□ □ □ □ □ □ □
03- Fire Alarm/Fire fighting Works
3.1 Location of FACP □ □ □ □ □ □ □
3.2 Location of Devices □ □ □ □ □ □ □
3.3 Location of sprinkler □ □ □ □ □ □ □
3.4 FM200 requirement □ □ □ □ □ □ □

Prepared by: Checked by: Approved by:

___________________ ___________________ ___________________


MEP Engineer Project Manager C.E.O

PROJECTS & DESIGN ENG-001 Page 1 of 1 HW-DC-CH-MEP-18

Interior Design || Exhibition || Furniture || Signage || Events


www.heeyaworks.com