MEP CHECKLIST
Checked in
Compliance at site
drawing
Sl.No Key Design checks Notes/Remarks
Partially
Yes No N/A Yes No N/A
done
01- Electrical Works
1.1 Floor Box Location □ □ □ □ □ □ □
Power Sockets Location and
1.2
Installation Height
□ □ □ □ □ □ □
Light Fixtures Location and
1.3
Installation Height
□ □ □ □ □ □ □
1.4 Light Switches Locations □ □ □ □ □ □ □
Materials used as per
1.5
specifications/approval
□ □ □ □ □ □ □
1.6 Location of DB/SMDB □ □ □ □ □ □ □
02- HVAC Works
Requirement of Additional VAV/AC
2.1
unit for individual offices
□ □ □ □ □ □ □
2.2 Location of Thermostats □ □ □ □ □ □ □
Location of AC grilles as per design
2.3
and requirements
□ □ □ □ □ □ □
Working condition of existing A/C
2.4
units
□ □ □ □ □ □ □
03- Fire Alarm/Fire fighting Works
3.1 Location of FACP □ □ □ □ □ □ □
3.2 Location of Devices □ □ □ □ □ □ □
3.3 Location of sprinkler □ □ □ □ □ □ □
3.4 FM200 requirement □ □ □ □ □ □ □