Sei sulla pagina 1di 3

traded stock on NSE on Friday.

It was followed by Unitech (number of shares traded: 5.41 crore), Punjab National Bank (3.92 crore) and JP
Associates (3.48 crore).

SAIL (3.35 crore), Suzlon Energy (3.22 crore), Sun PharmaNSE 8.08 % (2.92 crore), Tata Motors (2.72 crore), GMR
Infra (2.48 crore) and Idea Cellular (2.11 crore) also featured in the league of most traded stocks, in that order.

HYDERABAD: Telangana is set to cross the 5000 MW solar power generation capacity
by 2019 , more than the 1300 MW installed capacity at present. This, officials said, was because
the state adopted a distributed development model which is supported by the Centre. Under this
system, solar project developers are offered opportunity to develop units based on the demand-
supply situation with minimal operational losses.
The renewable energy capacity of the state will touch 3000 MW by this year end as projects
which have been tendered and are under execution, are expected to be commissioned as per
schedule. These projects were awarded during 2015 and are expected to come on stream before
December 2017. The state government has signed power purchase agreements for 3800 MW of
power from these units and all of them are expected to be operational by March-June 2018.

 1 Year After Loss, Celine Dion Makes An Unexpected


Announc..NinjaJournalist

 One of Our Credit Cards is Right For YouCapital One


Recommended By Colombia

By touching 3000MW-mark, the state will also cross another milestone of achieving over 15% of
total energy contribution from renewable energy sector. Currently, Rajasthan, which generates
1300 MW solar power, tops the list in the country with the highest solar power generation.
Unlike other states, Telangana has not opted for mega solar parks but has planned for a
decentralized model wherein it assesses the extra demand in different parts of the state and
floated tenders accor HYDERABAD: Telangana is set to cross the 5000 MW solar
power generation capacity by 2019 , more than the 1300 MW installed capacity at present. This,
officials said, was because the state adopted a distributed development model which is supported
by the Centre. Under this system, solar project developers are offered opportunity to develop
units based on the demand-supply situation with minimal operational losses.
dingly. The state government also seeking to encourage setting up of mini solar plants close to
transformers so that it could help provide power to agriculture sector with less transmission and
distribution losses.

HYDERABAD: Telangana is set to cross the 5000 MW solar power generation capacity
by 2019 , more than the 1300 MW installed capacity at present. This, officials said, was because
the state adopted a distributed development model which is supported by the Centre. Under this
system, solar project developers are offered opportunity to develop units based on the demand-
supply situation with minimal operational losses.

"The per capita consumption in Telangana has gone up to 1,390 units per annum as against 1,100
units. Consumption in Telangana ranks high among States. The 24x7 power supply has started
giving dividends in the forms of improved living standards and increased industrial production,"
D Prabhakar Rao, Chairman and managing director of Telangana Transco and Genco told STOI.
TOP COMMENT
KCR is not stupid like generally politicians are when he often says farm sector will get 24/7 good quality
power starting next year. No surprises if tariffs over a period come down too,with surplus p... Read
MoreMadhu

Betting high on rooftop solar power installations, the state government recently erected a 900-
kilowatt solar power installation at Raj Bhavan, one of the biggest such installations in the state.
Incentives are offered to households who opt for rooftop panels to harness solar power which
includes subsidy on the panels.
HYDERABAD: Telangana is set to cross the 5000 MW solar power generation capacity
by 2019 , more than the 1300 MW installed capacity at present. This, officials said, was because
the state adopted a distributed development model which is supported by the Centre. Under this
system, solar project developers are offered opportunity to develop units based on the demand-
supply situation with minimal operational losses.

Taking advantage of this, scheduled caste development department has proposed to set up 3MW
capacity rooftop installations on 230 residential schools maintained by the department. Enthused
over the success of its model, state is planning to come out with a new solar-wind hybrid policy
to accelerate the growth of the renewable energy sector.

Get latest news & live updates on the go on your pc with News App.
Download The Times of India news app for your device. Read more City
news in E
HYDERABAD: Telangana is set to cross the 5000 MW solar power generation capacity
by 2019 , more than the 1300 MW installed capacity at present. This, officials said, was because
the state ad HYDERABAD: Telangana is set to cross the 5000 MW solar power generation
capacity by 2019 , more than the 1300 MW installed capacity at present. This, officials said, was
because the state adopted a distributed development model which is supported by the Centre.
Under this system, solar project developers are offered opportunity to develop units based on the
demand-supply situation with minimal operational losses.
opted a di HYDERABAD: Telangana is set to cross the 5000 MW solar power generation
capacity by 2019 , more than the 1300 MW installed capacity at present. This, officials said, was
because the state adopted a distributed development model which is supported by the Centre.
Under this system, solar project developers are offered opportunity to develop units based on the
demand-supply situation with minimal operational losses.
stributed HYDERABAD: Telangana is set to cross the 5000 MW solar power generation
capacity by 2019 , more than the 1300 MW installed capacity at present. This, officials said, was
because the state adopted a distributed development model which is supported by the Centre.
Under this system, solar project developers are offered opportunity to develop units based on the
demand-supply situation with minimal operational losses.
development HYDERABAD: Telangana is set to cross the 5000 MW solar power generation
capacity by 2019 , more than the 1300 MW installed capacity at present. This, officials said, was
because the state adopted a distributed development model which is supported by the Centre.
Under this system, solar project developers are offered opportunity to develop units based on the
demand-supply situation with minimal operational losses.
model which HYDERABAD: Telangana is set to cross the 5000 MW solar power generation
capacity by 2019 , more than the 1300 MW installed capacity at present. This, officials said, was
because the state adopted a distributed development model which is supported by the Centre.
Under this system, solar project developers are offered opportunity to develop units based on the
demand-supply situation with minimal operational losses.
HYDERABAD: Telangana is set to cross the 5000 MW solar power generation capacity
by 2019 , more than the 1300 MW installed capacity at present. HYDERABAD: Telangana is set
to cross the 5000 MW solar power generation capacity by 2019 , more than the 1300 MW
installed capacity at present. This, offici HYDERABAD: Telangana is set to cross the 5000
MW solar power generation capacity by 20 HYDERABAD: Telangana is set to cross the 5000
MW solar power generation capacity by 2019 , more than the 1300 MW installed capacity at
present. This, officials said, was because the state adopted a distributed development model
which is supported by the Centre. Under this system, solar project developers are offered
opportunity to develop units based on the demand-supply situation with minimal operational
losses.
19 , more than the 1300 MW installed capacity at present. This, officials said, was because the
state adopted a distributed development model which is supported by the Centre. Under this
system, solar project developers are offered opportunity to develop units based on the demand-
supply situation with minimal operational losses.
als said, was because the state adopted a distributed development model which is supported by
the Centre. Under this system, solar project developers are offered opportunity to develop units
based on the demand-supply situation with minimal operational losses.
This, officials said, was because the state adopted a distributed development model which is
supported by the Centre. Under this system, solar project developers are offered opportunity to
develop units based on the demand-supply situation with minimal operational losses.
pment model which is supported by the Centre. Under this system, solar project developers are
offered opportunity to develop units based on the demand-supply situation with minimal
operational losses.
is supported by the Centre. Under this system, solar project developers are offered opportunity to
develop units based on the demand-supply situation with minimal operational losses.

Potrebbero piacerti anche