中国天辰化学工程公司

Client

SINGAPORE PETROLEUM COMPANY LIMITED


Project Management Consultant

SURBANA JURONG INFRASTRUCTURE PTE. LTD.


Main Contractor

CHINA INTERNATIONAL WATER & ELECTRIC CORP. (S) PTE. LTD.

ENGINEERING,PROCUREMENT AND CONSTRUCTION(EPC)WORKS AND


SERVICES FOR JURONG ISLAND MARKETING TERMINAL PROJECT,SINGAPORE

Equipment List

Document No.
JIMT-C02-M-12-20001

Number of pages: 17 Revision: 2 Status: IFA Date of distribution: 31 Dec 17

ISSUED CHECKED APPROVED

Name Signature Name Signature Name Date Signature

Li Ye Lu
Anbang/ Hongchen/ Yanping/ 31 Decn 17
Zou Zheng Hao Xiaojie Li Hongyan
Anbang/ Hongchen/ Yanping/ 31 Decn 17
Zou Zheng Hao Xiaojie Li Hongyan
ROLEUM COMPANY LIMITED
t

INFRASTRUCTURE PTE. LTD.

ATER & ELECTRIC CORP. (S) PTE. LTD.

AND CONSTRUCTION(EPC)WORKS AND


ARKETING TERMINAL PROJECT,SINGAPORE

ipment List

ocument No.
02-M-12-20001

Date of distribution: 31 Dec 17

APPROVED

Signature
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 5 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:3/7
JIMT Equipment List (Catalogue) JIMT-CO2-M-12-20001 Date 31/12/2017

No. ITEM PAGE REMARKS

A B C D

1 Equipment List (Pump,Compressor) 3~5

2 Equipment List (Tank) 6~7

3 Equipment List (Filter, Coalescer) 8~9

4 Equipment List (Other) 10~14

5 Equipment List (Fire Fighting) 15~17

Note: The detail information should refer to the datasheet for each equipment.
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 6 of 20
Project No. Jurong Island Marketing Terminal Document No.JIMT-C02-Q-13-20031-001 Rev 0
sheet NO.:3/7
JIMT PUNCH LIST JIMT-CO2-M-12-20001 Date 16/03/2018

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO. UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O
RAL (1)Operating 3,
1 20-PP-01,02,03 Mogas 95 Loading Pump Set 3 Casing: CS 780 2340
7035 (2)The pumps
are intermittent
Centrifugal Pump Shaft: SS running.
Capacity:220m³/h

Diff. Head: 40m

NPSHr: 3m

Motor: 37kW,Exd IIB T4,IP55

Voltage: 400V

6.1.22 Zone 2

RAL (1)The pump


2 20-PP-04 Mogas 92 Loading Pump Set 1 Casing: CS 780 780
7035 is intermittent
running.
Centrifugal Pump Shaft: SS

Capacity:220m³/h

Diff. Head: 40m

NPSHr: 3m

Motor: 37kW,Exd IIB T4,IP55

Voltage: 400V

6.1.22 Zone 2

RAL (1)Operating2,
3 20-PP-05,06 Mogas 98 Loading Pump Set 2 Casing: CS 780 1560
7035 (2)The pumps
are intermittent
Centrifugal Pump Shaft: SS running.
Capacity:220m³/h

Diff. Head: 40m

NPSHr: 3m

Motor: 37kW,Exd IIB T4,IP55

Voltage: 400V

6.1.22 Zone 2

1081.5 2163 RAL (1)Operating 1,


4 20-PP-07,08 Jet Fuel Loading Pump Set 2 Casing: CS
9003 standby 1.
(2)The pumps are
Centrifugal Pump Shaft: SS intermittent
running.
Capacity:220m³/h

Diff. Head: 50m

NPSHr: 5.5m

Motor: 45kW,Exd IIB T4,IP55

Voltage: 400V

6.1.22 Zone 2

5 20-PP-11,12,13 Diesel Loading Pump Set 3 Casing: CS 1165 3495 RAL (1)Operating3,
7035 (2)The pumps are
intermittent
Centrifugal Pump Shaft: SS running.
Capacity: 300m³/h

Diff. Head: 50m

NPSHr: 5.5m

Motor: 55kW,Exd IIB T4,IP55

Voltage: 400V

6.1.22 Zone 2

6 10-RP-061,071 Jet Fuel Recovery Pump Set 2 Shell:CS 140 280 White/RA
L 9003
Inpeller: SS304L
Screw Pump

Capacity: 540L/h

Diff. Press.: 2.0barg

Motor: 2.2kw,Exd IIB T4,IP55

Frequency: 50Hz

6.1.22 Zone 2

Mogas Additive Injection Pump material for pipeline and As (1)Operating 1,


7 40-CIP-01,02 Set 2 Supplied standby 1.
External gear positive tank; body &liquid end:
displacement. ductile iron/hardened steel; (2)The pumps are
Mag Drive gear :hardened steel intermittent
;packing/seal: Buna-N; running.
Capacity:540L/h (3)The pumps are
internals/other : hardened
steel in the vendor
Diff. Head: 70m package of Mogas
additive.
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 7 of 20
Project No. Jurong Island Marketing Terminal Document No.JIMT-C02-Q-13-20031-001 Rev 0
sheet NO.:3/7
JIMT PUNCH LIST JIMT-CO2-M-12-20001 Date 16/03/2018

material for pipeline and (1)Operating 1,


tank; body &liquid end: NET WT (Kg) INSULATION INSIDE ANTICORRO. standby 1.
ductile iron/hardened steel; Fnal (2)The pumps are
No. EQUIP. CODE Description TYPE/DWG.NO. UNIT QT'Y gear MATERIAL
:hardened steel THK.OF Coat REMARKS
intermittent
;packing/seal: Buna-N; UNIT TOTAL UPPER MAJOR LAYER Color running.
MAJ. LAY. MATERIAL
internals/other : hardened WT WT LAYER LAYER NO. (3)The pumps are
(mm)
steel in the vendor
A B C D E F G H I J K L M N package O of Mogas
additive.
Motor: 0.5-0.7kW,Exd IIB T4,IP55

Frequency: 50Hz

material for pipeline and As (1)Operating 1,


8 40-CIP-03,04 Diesel Additive Injection Pump Set 2 tank; body &liquid end: Supplied standby 1.
External gear positive
displacement ductile iron/hardened steel; (2)The pumps are
Mag Drive gear :hardened steel intermittent
;packing/seal: Buna-N; running.
Capacity:194.44L/h internals/other : hardened (3)The pumps are
steel in the vendor
Diff. Head: 70m package of diesel
additive.
Motor: 0.5-0.7kW,Exd IIB T4,IP55

Frequency: 50Hz

As (1)Operating 1,
9 40-CIP-05,06 Jet Fuel Additive Injection Pump Set 2 Supplied standby 1.
External gear positive
displacement (2)The pumps are
Mag Drive material for pipeline and intermittent
tank; body &liquid end: running.
Capacity:108L/h ductile iron/hardened steel; (3)The pumps are
gear :hardened steel in the vendor
Diff. Head: 70m ;packing/seal: Buna-N; package of jet fuel
internals/other : hardened additive.
Motor: 0.1-0.2kW,Exd IIB T4,IP55 steel

Frequency: 50Hz

11 53-ASP-01/02 Absorbent Supply Pump Set 2 Shell: CS 260 520 As (1)Operating 1,


Supplied standby 1.
(2)The pumps are
Centrifugal Pump Impeller: SS intermittent
running.
Capacity: 32.5m³/h (3)The pumps are
in the vendor
Diff. Head: 38.1m package of vapor
recovery unit.
NPSHr: 1.7m

Motor: 5.5kW,Exd IIB T4,IP55

Frequency: 50Hz

260 520 As (1)Operating 1,


12 53-ARP-01/02 Absorbent Return Pump Set 2 Shell: CS Supplied standby 1.
(2)The pumps are
Centrifugal Pump Impeller: SS intermittent
running.
Capacity: 32.5m³/h (3)The pumps are
in the vendor
Diff. Head: 38.1m package of vapor
recovery unit.
NPSHr: 1.7m

Motor: 5.5kW,Exd IIB T4,IP55

Frequency: 10~50Hz

As (1)Operating 1
13 53-ARP-01/02 Vacuum Pump Set 2 Shell: CS Supplied (2)The pump is
intermittent
Rotary dry screw pump Impeller: SS running.
(3)The pump is in
Capacity: 1359Nm³/h the vendor
package of vapor
Final Vacuum: 34-345mbar recovery unit.

Motor: 37.3kW,Exd IIB T4,IP55

Frequency: 10~50Hz

Sky
14 51-AC-01 Air Compressor Set 1 CS Blue/RAL
5015

Oil Injection Rotary Screw Type

Capacity: 300Nm³/h

Discharge Press.: 7.0barg

Motor: 30kW

Voltage: 400V

Cooling Type: Fan

Tank: SS 3900 3900 RAL Traffic (1)Operating 1,


15 62-FTPU-01 Foam Tank and Proportioning Unit Set 1 Yellow/RA standby 1.
L 1023 (2)One package
Tank Capacity: 5.3m3 (1 unit) supplied by
vendor.
62-FFP-01/02 Foam pump (2 units) Shell: SS

Rotary Gear Type Impeller: SS

Discharge Press.: 12barg

Foam Pump Controller (2 units)

Motor: 4kW (2 units)

62-P-01 Proportioner
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 8 of 20
Project No. Jurong Island Marketing Terminal Document No.JIMT-C02-Q-13-20031-001 Rev 0
sheet NO.:3/7
JIMT PUNCH LIST JIMT-CO2-M-12-20001 Date 16/03/2018

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO. UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O

Pump Shaft: SS 3810 11430 Traffic (1)Operating 2,


16 61-FWP-01/02/03 Fire Fighting Pumps Set 3 Red/RAL standby 1.
3020 (2)One diesel
Rated Flow: 370 m3/h
Shell: Cast Steel pump equiped with
one day tank.
(3)One package
Diesel Engine Driven Impeller: Bronze
supplied by
vendor.
Diesel Engine controller
2000L
61-T-01 / 02 /03 Day Tanks

175 350 Traffic (1)Operating 1,


17 61-FJP-01 / 02 Jockey Pump Set 2 Pump Shaft: AISI 431 Red/RAL standby 1.
3020

Centrifugal Pump
Shell: Cast Iron
Capacity: 30 m3/h

Differential Head: 95m

NPSHr : 7m

Motor : 15kW, IP55/F/B Impeller: AISI 304

18 54-WP-01/02 Water Booster Pump Set 2 70 140


As (1)Operating 1,
supplied standby 1.
Centrifugal Type

Capacity: 18m3/h

Differential Head: 40m

NPSHr: 7m

Motor:4kW, IP65/B/(IEC)

Voltage: 400V
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 9 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:4/7
JIMT Equipment List (Tank) JIMT-CO2-M-12-20001 Date 31/12/2017

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO. UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O
1

6
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 10 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:4/7
JIMT Equipment List (Tank) JIMT-CO2-M-12-20001 Date 31/12/2017

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO. UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O

10
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 11 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:5/7
JIMT Equipment List (Filter,Coalescer) JIMT-CO2-M-12-20001 Date 31/12/2017

A B C D E F G H I J K L M N O P Q
OPERATIING
NET WT (Kg) MATERIAL Max.
CONDITIONS
Allowable
Rated / Design Capacity Fnal Coat
No. EQUIP. CODE Description Pipe Size QT'Y PRODUCT TYPE Differential PRECISION
(m3/h) UNIT TOTAL BODY/ TEMP. PRESS. Pressure Color
LINING
WT WT SCREEN (℃) (barg) (Bar)

A B C D E F G H I J K L M N O P Q

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 12 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:5/7
JIMT Equipment List (Filter,Coalescer) JIMT-CO2-M-12-20001 Date 31/12/2017

A B C D E F G H I J K L M N O P Q

42

43

44

45

46

47

48

49

50
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 13 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:6/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO. UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O

8
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 14 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:6/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO. UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O

10

11

12

13

14
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 15 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:6/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO. UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O

15

16

17

18

19

20
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 16 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:6/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO. UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O

21

22

23

24

25
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 17 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:6/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO. UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 18 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:7/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO./loaction UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O
1

10

11

12

13

14

15
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 19 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:7/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO./loaction UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O

16

17

18

19

20

21

22

23

24

25

26
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.

sheet 20 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:7/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017

NET WT (Kg) INSULATION INSIDE ANTICORRO.


Fnal
No. EQUIP. CODE Description TYPE/DWG.NO./loaction UNIT QT'Y MATERIAL THK.OF Coat REMARKS
UNIT TOTAL UPPER MAJOR LAYER Color
MAJ. LAY. MATERIAL
WT WT LAYER LAYER NO.
(mm)

A B C D E F G H I J K L M N O