Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Client
Equipment List
Document No.
JIMT-C02-M-12-20001
Li Ye Lu
Anbang/ Hongchen/ Yanping/ 31 Decn 17
Zou Zheng Hao Xiaojie Li Hongyan
Anbang/ Hongchen/ Yanping/ 31 Decn 17
Zou Zheng Hao Xiaojie Li Hongyan
ROLEUM COMPANY LIMITED
t
ipment List
ocument No.
02-M-12-20001
APPROVED
Signature
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 5 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:3/7
JIMT Equipment List (Catalogue) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D
Note: The detail information should refer to the datasheet for each equipment.
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 6 of 20
Project No. Jurong Island Marketing Terminal Document No.JIMT-C02-Q-13-20031-001 Rev 0
sheet NO.:3/7
JIMT PUNCH LIST JIMT-CO2-M-12-20001 Date 16/03/2018
A B C D E F G H I J K L M N O
RAL (1)Operating 3,
1 20-PP-01,02,03 Mogas 95 Loading Pump Set 3 Casing: CS 780 2340
7035 (2)The pumps
are intermittent
Centrifugal Pump Shaft: SS running.
Capacity:220m³/h
NPSHr: 3m
Voltage: 400V
6.1.22 Zone 2
Capacity:220m³/h
NPSHr: 3m
Voltage: 400V
6.1.22 Zone 2
RAL (1)Operating2,
3 20-PP-05,06 Mogas 98 Loading Pump Set 2 Casing: CS 780 1560
7035 (2)The pumps
are intermittent
Centrifugal Pump Shaft: SS running.
Capacity:220m³/h
NPSHr: 3m
Voltage: 400V
6.1.22 Zone 2
NPSHr: 5.5m
Voltage: 400V
6.1.22 Zone 2
5 20-PP-11,12,13 Diesel Loading Pump Set 3 Casing: CS 1165 3495 RAL (1)Operating3,
7035 (2)The pumps are
intermittent
Centrifugal Pump Shaft: SS running.
Capacity: 300m³/h
NPSHr: 5.5m
Voltage: 400V
6.1.22 Zone 2
6 10-RP-061,071 Jet Fuel Recovery Pump Set 2 Shell:CS 140 280 White/RA
L 9003
Inpeller: SS304L
Screw Pump
Capacity: 540L/h
Frequency: 50Hz
6.1.22 Zone 2
sheet 7 of 20
Project No. Jurong Island Marketing Terminal Document No.JIMT-C02-Q-13-20031-001 Rev 0
sheet NO.:3/7
JIMT PUNCH LIST JIMT-CO2-M-12-20001 Date 16/03/2018
Frequency: 50Hz
Frequency: 50Hz
As (1)Operating 1,
9 40-CIP-05,06 Jet Fuel Additive Injection Pump Set 2 Supplied standby 1.
External gear positive
displacement (2)The pumps are
Mag Drive material for pipeline and intermittent
tank; body &liquid end: running.
Capacity:108L/h ductile iron/hardened steel; (3)The pumps are
gear :hardened steel in the vendor
Diff. Head: 70m ;packing/seal: Buna-N; package of jet fuel
internals/other : hardened additive.
Motor: 0.1-0.2kW,Exd IIB T4,IP55 steel
Frequency: 50Hz
Frequency: 50Hz
Frequency: 10~50Hz
As (1)Operating 1
13 53-ARP-01/02 Vacuum Pump Set 2 Shell: CS Supplied (2)The pump is
intermittent
Rotary dry screw pump Impeller: SS running.
(3)The pump is in
Capacity: 1359Nm³/h the vendor
package of vapor
Final Vacuum: 34-345mbar recovery unit.
Frequency: 10~50Hz
Sky
14 51-AC-01 Air Compressor Set 1 CS Blue/RAL
5015
Capacity: 300Nm³/h
Motor: 30kW
Voltage: 400V
62-P-01 Proportioner
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 8 of 20
Project No. Jurong Island Marketing Terminal Document No.JIMT-C02-Q-13-20031-001 Rev 0
sheet NO.:3/7
JIMT PUNCH LIST JIMT-CO2-M-12-20001 Date 16/03/2018
A B C D E F G H I J K L M N O
Centrifugal Pump
Shell: Cast Iron
Capacity: 30 m3/h
NPSHr : 7m
Capacity: 18m3/h
NPSHr: 7m
Motor:4kW, IP65/B/(IEC)
Voltage: 400V
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 9 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:4/7
JIMT Equipment List (Tank) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O
1
6
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 10 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:4/7
JIMT Equipment List (Tank) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O
10
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 11 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:5/7
JIMT Equipment List (Filter,Coalescer) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O P Q
OPERATIING
NET WT (Kg) MATERIAL Max.
CONDITIONS
Allowable
Rated / Design Capacity Fnal Coat
No. EQUIP. CODE Description Pipe Size QT'Y PRODUCT TYPE Differential PRECISION
(m3/h) UNIT TOTAL BODY/ TEMP. PRESS. Pressure Color
LINING
WT WT SCREEN (℃) (barg) (Bar)
A B C D E F G H I J K L M N O P Q
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 12 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:5/7
JIMT Equipment List (Filter,Coalescer) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O P Q
42
43
44
45
46
47
48
49
50
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 13 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:6/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O
8
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 14 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:6/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O
10
11
12
13
14
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 15 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:6/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O
15
16
17
18
19
20
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 16 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:6/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O
21
22
23
24
25
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 17 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:6/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 18 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:7/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O
1
10
11
12
13
14
15
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 19 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:7/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O
16
17
18
19
20
21
22
23
24
25
26
SINGAPORE PETROLEUM COMPANY SURBANA JURONG INFRASTRUCTURE CHINA INTERNATIONAL WATER &
LIMITED PTE. LTD. ELECTRIC CORP. (S) PTE. LTD.
sheet 20 of 20
Project No. Jurong Island Marketing Terminal Document No. Rev 2
sheet NO.:7/7
JIMT Equipment List (Others) JIMT-CO2-M-12-20001 Date 31/12/2017
A B C D E F G H I J K L M N O