Phase 1 2 All welds 6mm continuous fillet welds unless noted otherwise
Corrosion protection: As per Architect / Engineer
Ends of Column Shaft to be Machine Sawn True & Square
All profile notches to have 11mm radius
All steelwork to be hardstamped with the Job Number,
12 2 666 12 at position shown for correct site orientation
QUALITY CONTROL
130
Start date :...............................
Complete Date :.......................
Top View Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
Released for welding by :...................................................
Date :.......................................
2 690 (UB203*133*25 x 2666)
12 2 666 12
Top View
70
64
136 133 70
339
A
B1 ( m111 )
70 64 6
35
133
30 70 30
Front View
20
598
35 35
136
35
p33 p33
35
136
108 108
p32
346
70
70
1 500
303
70
73
12 108
108
A-A
2 m11
m11
35
2
p33 p33
395
136
20
140
m111
10 63 70
12 2 666 12
Front View
Material list for 1 Beam assembly marked B1 - a total of 2 are required 4 04 Issued for Approval 2018-04-23
Mark No Profile Length Grade Paint area Mass 3 03 Issued for approval 2018-04-20
m111 2 UB203*133*25 2666 S355JR 4.9 133.8 Rev Mark Revision Description Date
m112 2 PFC180*70 2546 S355JR 2.4 107.4 Drawn FDT
p32 1 PLT10*300 303 S355JR 0.2 7.1
KENMORE CRUSHING SOLUTIONS Scale 1:15 1:10
p33 4 PLT10*240.9 312 S355JR 0.6 23.6 ASNKO PLANT PHASE II Issued 16.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
RD 98 720 25
QUALITY CONTROL
818
843
98
Name :........................................Clock No :........................
60 60 Start date :...............................
Complete Date :.......................
25 35 35 25
Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
22
Released for welding by :...................................................
28
50
Date :.......................................
28
10
1 ø 18.0 1 ø 18.0
28
Top View
130
98 745
30 70 30
Top View
12 843 30 40
Front View
720
A B C
m185
70
64
B8 ( m215 )
128
64
m186
217
Bottom View
A-A
Top View
183
49
50
p298
Front View
A B C
626
577
843
RD 577 49 217
Bottom View
855 (C140*60 x 843)
C-C
Front View
5
1 ø 18.0
1 ø 18.0
Bottom View
Top View
50
Front View
2 ø 18.0
p263
Bottom View
B-B 5 05 Issued for Approval 2018-04-26
4 04 Issued for Approval 2018-04-23
Material list for 1 BEAM assembly marked B8 - only 1 assembly is required Rev Mark Revision Description Date
Mark No Profile Length Grade Paint area Mass Drawn FDT
m185 1 L50*50*6 60 S355JR 0.0 0.3
KENMORE CRUSHING SOLUTIONS Scale 1:5
m186 1 L50*50*6 60 S355JR 0.0 0.3 ASNKO PLANT PHASE II Issued 26.04.2018
OXIDE LOADING STATION Revised 2018-04-26
Tekla structures
QUALITY CONTROL
RD
25 720 98 Name :........................................Clock No :........................
Start date :...............................
745
843
25
Complete Date :.......................
60 60 Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
25 35 35 25
Released for welding by :...................................................
239 Date :.......................................
22
28
50
10
28
28 1 ø 18.0
1 ø 18.0
Top View
Top View
50
855 (C140*60 x 843)
843 12
Front View
658 185
658
843
Bottom View
A B C A-A
m185 Top View
B9 ( m216 )
70
50
1 ø 18.0 1 ø 18.0
m186
Front View
217
2 ø 18.0
p263
p298 Bottom View
183
B-B
49
Top View
130
A B C 30 70 30
266
40 30
217
843
RD 217 49 577
Front View
Front View
70
64
128
64
5
1 ø 18.0
1 ø 18.0
Bottom View
QUALITY CONTROL
Top View
RD 1 533 810 30
1 533
2 343
2 373
50
60 60
70
30 30 30 30
Front View
22
50
28
28
28
2 ø 18.0
2 ø 18.0 A-A
Top View
1 533 840
50
Top View
70
2 250
Front View
A B
B13 ( m220 )
4 ø 18.0 4 ø 18.0
B-B
30
2x m242 FS
30
A B
1 323
1 383
2 373
153
93
RD 93 60 1 170 60 990
C140*60 x 2373
Front View
5 05 Issued for Approval 2018-04-26
4 04 Issued for Approval 2018-04-23
Rev Mark Revision Description Date
Drawn FDT
Material list for 1 BEAM assembly marked B13 - a total of 4 are required
KENMORE CRUSHING SOLUTIONS Scale 1:2.5
Mark No Profile Length Grade Paint area Mass
ASNKO PLANT PHASE II Issued 26.04.2018
OXIDE LOADING STATION Revised 2018-04-26
Tekla structures
40
Checked by Inspector :.......................................................
Released for welding by :...................................................
80 80 75 Date :.......................................
p110
p109
65
650
650
8 65 70
1 033
Top View
104
104
172
196
318
1 738
516
535
38
184
50
50 818 104 996 104 868 60
650 900 442
358 8 200
8 65 70 65 B
m140 F
BN1 ( m140 ) 75 125 50 Top View
C C
C-C 1 ø 14.0
50
80
100
1 ø 14.0
A-A m155
200
1 ø 14.0
p297 1 ø 14.0
200
m78
608
m157
p297
p297
608
p19
463
p109
200
200
p19
D
p110
m71
1 ø 14.0
164
p55 1 ø 14.0
1 ø 14.0
200
149 1 ø 14.0
36
32 0
36
Top View
p55
1 470
115
41 14
p14
p14
p14
p14
p14
p14
p14
p14
p296
p14 200
p296 m156
20 0
Top View
196
1 ø 14.0 1 ø 14.0
p296
1 ø 14.0
1 ø 14.0
200
F
949
m81
200
604
56 88 5 D
Top View
938
200
0
p1 5
200
p53
p21
0
p15
200
m77
86
200
1 ø 14.0 1 ø 14.0
1 ø 14.0 1 ø 14.0
D-D
353
200
p53
58
74
Material list for 1 BIN assembly marked BN1 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass
m71 1 PC200*75 634 S355JR 0.3 15.4
8 100
Total for 1 assembly 24.2 907.6 1 'BIN' required marked BN1 Tel: 011 768 7508 Fax: 086 600 7508 vdcc@vodamail.co.za A [BN.1] 4
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 1 All welds 6mm continuous fillet welds unless noted otherwise
Corrosion protection: As per Architect / Engineer
Ends of Column Shaft to be Machine Sawn True & Square
All profile notches to have 11mm radius
All steelwork to be hardstamped with the Job Number,
at position shown for correct site orientation
QUALITY CONTROL
p54
p55
p14
p14
p14
p14
p14
p14
p14
p14
TO BE OPP-HAND OF BN1
p110
m74
Top View
m73
Top View
p21
p53
p18
p55
p14 BS
BN2 ( m82 )
Front View
m79 p19
p109
m80
A-A
p18
p14 BS p55
p55
Front View
p19 p14
p296 p297
m76
p297
BN2 ( m82 )
Front View
Material list for 1 BIN assembly marked BN2 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass
m72 1 PC200*75 634 S355JR 0.3 15.4
m73 1 PC200*75 1738 S355JR 0.9 42.2
m74 1 PC200*75 1564 S355JR 0.8 38.0
m75 1 PC200*75 1021 S355JR 0.5 24.8
m76 1 PC200*75 1048 S355JR 0.6 25.5
m79 1 PC200*75 634 S355JR 0.3 15.4
m80 1 PC200*75 1048 S355JR 0.6 25.5
m82 1 PC200*75 2008 S355JR 1.1 48.8
p14 9 FL8*150 204 S355JR 0.3 17.3
p18 1 PLT8*1010.5 1990 S355JR 4.1 126.3
p19 1 PLT8*606.4 1992 S355JR 2.5 75.9 4 04 Issued for Approval 2018-04-23
p21 1 PLT8*1568.4 3000 S355JR 8.3 295.5 3 03 Issued for approval 2018-04-20
p53 1 PLT12*250 2208 S355JR 1.2 52.0 Rev Mark Revision Description Date
p54 1 FL12*200 2650 S355JR 1.1 49.9 Drawn FDT
p55 1 FL12*150 1993 S355JR 0.6 28.2
KENMORE CRUSHING SOLUTIONS Scale 1:10
p109 1 FL8*70 1547 S355JR 0.2 6.8 ASNKO PLANT PHASE II Issued 23.04.2018
Tekla structures
Total for 1 assembly 24.2 907.6 1 'BIN' required marked BN2 Tel: 011 768 7508 Fax: 086 600 7508 vdcc@vodamail.co.za A [BN.2] 4
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 1 All welds 6mm continuous fillet welds unless noted otherwise
300 8 4 000 8 300 Corrosion protection: As per Architect / Engineer
Ends of Column Shaft to be Machine Sawn True & Square
1 150 737 113 113 737 1 150 103 103 All profile notches to have 11mm radius
All steelwork to be hardstamped with the Job Number,
50 50 at position shown for correct site orientation
70 65
100 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 100
65 70 165
QUALITY CONTROL
Top View
110 1 409 8
1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0
693
577
150
50
p314 103
57
1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 51 98 64
277
150
50
7
152
HOLE TO SUIT 1"
HOLE TO SUIT 1" WELDED SOCKET
WELDED SOCKET
195
515
Front View
1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0
195
180
258
40 8 150 200 200 200 175 175 175 175 200 175 175 175 175 200 175 175 175 175 200 200 200 150 8 40
180
658
650 900 900 900 650
550
Top View HOLE TO SUIT 1"
400
WELDED SOCKET
180
A
90
p47 BN3 ( m108 ) p48 p47 p48
p45
p45
300
m105
150
p45
p52
p48 p46
A-A
160
p51 p52
p17
Front View
p17
p17
p17
p16
p314 70 8
195
p16
8
p11
69
195
200
40
1 180
p111
180
p22
p111
200
180
200
p10
180
m104
1 409
p10
200
90
200
Material list for 1 BIN assembly marked BN3 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass Front View
m104 1 PFC300*100 1480 S355JR 1.1 67.2
m105 1 PFC300*100 1480 S355JR 1.1 67.2
165
m108 1 PFC300*100 4016 S355JR 3.1 182.3
p10 2 FL8*70 737 S355JR 0.2 6.5
80 35
p11 1 FL8*70 4016 S355JR 0.6 17.7
p12 2 PLT8*166 295 S355JR 0.2 6.2
p13 2 FL8*70 1234 S355JR 0.4 10.8
p16 2 PLT8*1172.5 1409 S355JR 5.2 207.5
60
p17 4 FL8*70 1497 S355JR 0.9 24.4
p22 1 PLT8*1497.1 4000 S355JR 12.1 376.1
p45 4 PLT12*127.5 154 S355JR 0.2 7.4 5 05 Issued for Approval 2018-04-26
p46 1 PLT12*154 267 S355JR 0.1 3.9 4 04 Issued for Approval 2018-04-23
p47 2 PLT12*154 267 S355JR 0.2 7.7 70 80 80 70 8 Rev Mark Revision Description Date
p48 3 PLT12*206 300 S355JR 0.4 17.5 Drawn FDT
p51 1 FL12*90 266 S355JR 0.1 2.3 B-B
KENMORE CRUSHING SOLUTIONS Scale 1:10
p52 2 FL12*30 266 S355JR 0.0 1.5 ASNKO PLANT PHASE II Issued 26.04.2018
Tekla structures
Total for 1 assembly 26.6 1025.6 1 'BIN' required marked BN3 Tel: 011 768 7508 Fax: 086 600 7508 vdcc@vodamail.co.za A [BN.3] 5
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 1 All welds 6mm continuous fillet welds unless noted otherwise
Corrosion protection: As per Architect / Engineer
Ends of Column Shaft to be Machine Sawn True & Square
300 8 4 000 8 300 All profile notches to have 11mm radius
All steelwork to be hardstamped with the Job Number,
650 900 900 900 650 at position shown for correct site orientation
175
Name :........................................Clock No :........................
60 538 103 797 103 797 103 797 103 539 60
Start date :...............................
12
C 450 450 Complete Date :.......................
B
Top View
Checked by Supervisor :....................................................
50 50 100 100 100 Checked by Inspector :.......................................................
Released for welding by :...................................................
Front View 10
0 Date :.......................................
B-B
175
Top View
1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0
41 66
3 4
300
WELDED SOCKET WELDED SOCKET 50
9
60
7
68
9
119
26
1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0
1
1 417
30
195
1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 12
1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 5 61
1 ø 14.0 5
28
333
0
195
805
HOLE TO SUIT 1" HOLE TO SUIT 1"
WELDED SOCKET WELDED SOCKET
1 ø 14.0
195
405
30
1 470
195
Front View
1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0
49
1 ø 14.0
28
108
8
180
180
150
40 8 150 200 200 200 175 175 175 175 200 175 175 175 175 200 175 175 175 175 200 200 200 150 8 40
180
180
561
658
HOLE TO SUIT 1"
WELDED SOCKET
Top View
400
180
180
1 ø 14.0 1 ø 14.0 1 ø 14.0 1 ø 14.0
90
90
52
300 658 900 900 900 658 300
100 100 100 100 100 100 75 583 104 606 42 8
100
A-A
p45
p45 p57 p45
360
m107
p48
Front View p45 p57 p51
C-C
p46
p51
195
p20
p20
p20
p20
p15
195
p315
195
p11
195
p111
Material list for 1 BIN assembly marked BN4 - only 1 assembly is required
180
p23
Mark No Profile Length Grade Paint area Mass
m106 1 PFC300*100 1770 S355JR 1.4 80.4 p111
m107 1 PFC300*100 1770 S355JR 1.4 80.4
m109 1 PFC300*100 4016 S355JR 3.1 182.3
180
m106
p15
p15 2 PLT8*1409.1 1463 S355JR 6.1 258.9
p20 4 FL8*70 1618 S355JR 1.0 27.0
p23 1 PLT8*1618.2 4000 S355JR 13.0 406.5 p10
90
p45 4 PLT12*127.5 154 S355JR 0.2 7.4 5 05 Issued for Approval 2018-04-26
p46 1 PLT12*154 267 S355JR 0.1 3.9 4 04 Issued for Approval 2018-04-23
p47 2 PLT12*154 267 S355JR 0.2 7.7 p12 p13 p13 p12 Rev Mark Revision Description Date
p48 3 PLT12*206 300 S355JR 0.4 17.5 A KENMORE CRUSHING SOLUTIONS Drawn FDT
p51 2 FL12*90 266 S355JR 0.1 4.5 Scale 1:10
p57 2 FL12*110 154 S355JR 0.1 3.2 ASNKO PLANT PHASE II Issued 26.04.2018
165 70 65 8 Front View
Tekla structures
Total for 1 assembly 29.0 1140.5 1 'BIN' required marked BN4 Tel: 011 768 7508 Fax: 086 600 7508 vdcc@vodamail.co.za A [BN.4] 5
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 4 All profile notches to have 11mm radius unless noted otherwise
2 718
2 543
2 613
2 683
35
105
175
35 70 70 2 368 70 70 35
0
3 ø 22.0
3 ø 22.0
50
Bottom View
BR1
A
L100*100*10 x 2718
Back View
Back View
Bottom View
A-A
2 704
2 529
2 599
2 669
35
105
175
35 70 70 2 354 70 70 35
0
3 ø 22.0
3 ø 22.0
50
Bottom View
BR2
A
L100*100*10 x 2704
Back View
Back View
Bottom View
A-A
1 975
1 800
1 870
1 940
35
105
175
35 70 70 1 625 70 70 35
0
3 ø 22.0
3 ø 22.0
50
Bottom View
BR3
A
L100*100*10 x 1975
Back View
Back View
Bottom View
A-A
110
767
837
877
40
40 70 657 70 40
0
2 ø 22.0
2 ø 22.0
40
Bottom View
BR13
A
L80*80*6 x 877
Back View
Back View
Bottom View
A-A
QUALITY CONTROL
336
Name :........................................Clock No :........................
Start date :...............................
p31 Complete Date :.......................
25
102
p29
127
93
Top View
93
127
10
Front View
p29
5
102
70
45
25
p31 A-A
Top View
1 780
2 006
3 839
3 934
4 021
RD 1 780 226 1 833 96 87 100 100
4 021
50 50
4 009
53 47 47 53
4 009 12
Front View
Top View
67
4 ø 24.0
UB254*146*37 x 4021
p42
50
10
12
234
100
5
50
336 A B
67
C1 ( m101 ) p42
B-B
10
A B
Front View
2 930
3 951
4 021
at position shown for correct site orientation
QUALITY CONTROL
2 712 1 142 167
Name :........................................Clock No :........................
2 712
3 854
4 021
RD Start date :...............................
68 96 1 842 130 1 885 Complete Date :.......................
2 006
2 136
4 021
164
68
140
83
35
Top View
4 009 4 021
Front View
5
4 009 12
Top View
UB254*146*37 x 4021 Bottom View
A-A
RD 2 712 1 142 167
2 712
3 854
4 021
Top View
A C
p42
C2 ( m262 )
50
12
Front View
p50 BS
p42
50
Bottom View
C-C
A C
Front View
p41
35
p30
p41
2 419
Bottom View
5 05 Issued for Approval 2018-04-26
Material list for 1 Column assembly marked C2 - only 1 assembly is required 4 04 Issued for Approval 2018-04-23
Mark No Profile Length Grade Paint area Mass Rev Mark Revision Description Date
m262 1 UB254*146*37 4021 S355JR 4.3 148.8 Drawn FDT
p30 1 PLT10*224.4 242 S355JR 0.1 4.3
KENMORE CRUSHING SOLUTIONS Scale 1:7.5
p31 1 PLT10*298.5 336 S355JR 0.2 7.9 ASNKO PLANT PHASE II Issued 26.04.2018
OXIDE LOADING STATION Revised 2018-04-26
Tekla structures
QUALITY CONTROL
2 712
4 021
Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
RD 2 584 70 140 136 682 136 133 70 70 Released for welding by :...................................................
Date :.......................................
2 584
2 654
2 794
2 930
3 612
3 748
3 881
3 951
4 021
35
Top View
83
140
35
11 44
70 59
233
Front View
4 009 4 021
70 70
2 136
164
2 006
3 854
68
A-A
68 96 1 842 130 1 718 155 12
4 021
4 021 Top View
67
50
234
Top View
67 50
12
Front View
UB254*146*37 x 4021
3 854
4 021
12 12
155 B-B
224
336 B
A
C3 ( m102 ) p42
p41
233
5
10
p50
p41
2 ø 24.0
A p42 B
Front View
2 006
2 136
4 021
164
68
13
Released for welding by :...................................................
102
p41
p30
Date :.......................................
127
83
Top View
80
35
p298
p41
49
Front View
4 009 4 021
5
2 712
3 854
2 712 1 142 155 12
A-A
3 103
3 054
4 021
Top View
3 054 49 918
50
4 021
2 930
3 951
p42
2 930 1 021 70
4 009 4 021
Front View
12
50
4 009 12
p42
Top View
UB254*146*37 x 4021 C-C
Top View
RD 2 712 1 142 167
2 712
3 854
4 021
Front View
5
A B C
C4 ( m190 )
p50 BS
B-B
30
5
A B C
3 764
4 021
3 764 257
Front View
Material list for 1 Column assembly marked C4 - only 1 assembly is required 5 05 Issued for Approval 2018-04-26
Mark No Profile Length Grade Paint area Mass 4 04 Issued for Approval 2018-04-23
m190 1 UB254*146*37 4021 S355JR 4.3 148.8 Rev Mark Revision Description Date
p30 1 PLT10*224.4 242 S355JR 0.1 4.3 Drawn FDT
p31 1 PLT10*298.5 336 S355JR 0.2 7.9
KENMORE CRUSHING SOLUTIONS Scale 1:7.5
p41 2 FL12*100 155 S355JR 0.0 2.9 ASNKO PLANT PHASE II Issued 26.04.2018
OXIDE LOADING STATION Revised 2018-04-26
Tekla structures
QUALITY CONTROL
2 930 1 021 70
Name :........................................Clock No :........................
2 930
3 951
4 021
Start date :...............................
Complete Date :.......................
Checked by Supervisor :....................................................
2 712 342 49 751 155
Checked by Inspector :.......................................................
2 712
3 054
3 854
12
Released for welding by :...................................................
4 021 4 009
Date :.......................................
3 103
49
83
140 80
Top View
35
102
Front View
5
127
164
68
2 136
2 006
4 021
RD
Bottom View
68 1 842 130 1 885
A-A
96 Top View
UB254*146*37 x 4021
Front View
50
12
RD 2 712 1 142 167
2 712
3 854
4 021
p42
50
Bottom View
A B
B-B
C5 ( m264 )
30
5
p50 BS
A B
4 021
3 764
3 764 257
Front View
p30 p31
p41
35
p298 p41
2 419
Bottom View
Material list for 1 Column assembly marked C5 - only 1 assembly is required 5 05 Issued for Approval 2018-04-26
Mark No Profile Length Grade Paint area Mass 4 04 Issued for Approval 2018-04-23
m264 1 UB254*146*37 4021 S355JR 4.3 148.8 Rev Mark Revision Description Date
p30 1 PLT10*224.4 242 S355JR 0.1 4.3 Drawn FDT
p31 1 PLT10*298.5 336 S355JR 0.2 7.9
KENMORE CRUSHING SOLUTIONS Scale 1:15
p41 2 FL12*100 155 S355JR 0.0 2.9 ASNKO PLANT PHASE II Issued 26.04.2018
OXIDE LOADING STATION Revised 2018-04-26
Tekla structures
QUALITY CONTROL
Top View
p31
Front View
70 45 25
102
127
93
A-A
Top View
93
127
p29
p42
102
25 45 70
67
50
67 50
p31 231
3 934
4 021
Front View
1 780
2 006
3 839
RD 1 780 226 1 833 96 87 p42
50 50
4 009 4 021
4 009 12
UB254*146*37 x 4021
12
336
A B
C7 ( m263 )
2 ø 24.0
10
2 ø 24.0
A B
Front View
Revised
p29 2 PLT10*230.7 252 S355JR 0.2 9.1
Project Number
p31 2 PLT10*298.5 336 S355JR 0.4 15.8 AV1716
Supplied by P O Box 21473
p42 2 FL12*100 234 S355JR 0.1 4.4 Drawing Rev
VISION DRAUGHTING cc
Total for 1 assembly 5.0 178.1 1 'Column' required marked C7 Tel: 011 768 7508 Fax: 086 600 7508
Helderkruin 1733, South Africa
vdcc@vodamail.co.za A [C.7] 4
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
65 6 1 320 6 65 All welds 6mm continuous fillet welds unless noted otherwise
Phase 1 1
Corrosion protection: As per Architect / Engineer
295 730 295 Ends of Column Shaft to be Machine Sawn True & Square
All profile notches to have 11mm radius
84 255 269 104 269 255 84 All steelwork to be hardstamped with the Job Number,
at position shown for correct site orientation
QUALITY CONTROL
30 35 35 30 Name :........................................Clock No :........................
Start date :...............................
79
Complete Date :.......................
Checked by Supervisor :....................................................
251
p67
333
218
4 ø 18.0 4 ø 18.0 Released for welding by :...................................................
Date :.......................................
35
260
p71
200
251 870 75
6
50
Top View
104
50
200
p73
876
6
794
CH2 ( p61 )
2x p66
400
200
p71 p74
421
634
p79
p73
690
159
66
103
35
40
p72
50
Front View
397
249
Top View
333
10
R1
84
p79
52
40 80 2 080 80 40
m154 A-A
650
CH2 ( p61 )
1 ø 14.0 1 ø 14.0
p82
Material list for 1 CHUTE assembly marked CH2 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass
m154 1 L150*75*10 2320 S355JR 1.0 39.4 1 ø 14.0 1 ø 14.0
1 ø 14.0 1 ø 14.0
p61 1 PLT6*1023.1 1320 S355JR 2.3 63.6 4 04 Issued for Approval 2018-04-23
p66 2 FL6*65 944 S355JR 0.3 5.6 3 03 Issued for approval 2018-04-20
p67 1 FL6*65 878 S355JR 0.1 2.5 Rev Mark Revision Description Date
A 8 ø 18.0
p71 2 FL6*65 794 S355JR 0.2 4.9 Drawn FDT
p72 1 FL6*65 1462 S355JR 0.2 4.5
KENMORE CRUSHING SOLUTIONS Scale 1:10
p73 2 PLT6*750.4 1121 S355JR 3.0 79.3 41 160 200 200 200 200 200 160 41 ASNKO PLANT PHASE II Issued 19.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
Total for 1 assembly 10.1 283.6 1 'CHUTE' required marked CH2 Tel: 011 768 7508 Fax: 086 600 7508
Helderkruin 1733, South Africa
vdcc@vodamail.co.za A [CH.2] 4
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 1 All welds 6mm continuous fillet welds unless noted otherwise
Corrosion protection: As per Architect / Engineer
Ends of Column Shaft to be Machine Sawn True & Square
All profile notches to have 11mm radius
6 1 320 6 All steelwork to be hardstamped with the Job Number,
at position shown for correct site orientation
B B
A p65
30
p72 8 ø 18.0
377 450
35
11
6
8
50
p26
8
153
p65
60
63
10
10
41
p71
6
p34 4 ø 18.0
p34
40
0
4 ø 18.0 8 8 p71
200
153
11 8 322 8 11 4 ø 18.0
p78
12 12 p81
11
8
450
200
33
200
25
38
6
p81
788
CH3 ( p75 )
Front View
CH3 ( p75 ) WELD TO PLATEWORK
200
200
200
449
DRILL TO SUIT Ø4 SPLIT
PIN & WASHER
0
8 ø 18.0
11
p63
R
A
35
110
41 160 200 200 200 200 200 160 41
6
660 660
A-A
6
2 ø 14.0
2 ø 14.0 2 ø 14.0 2 ø 14.0
275
371
p77
p65
Material list for 1 CHUTE assembly marked CH3 - only 1 assembly is required
p81
p81
QUALITY CONTROL
p80 p80 Name :........................................Clock No :........................
p68
Start date :...............................
Complete Date :.......................
p70 p70
Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
Released for welding by :...................................................
Date :.......................................
Top View
717 6
p68
6
p72 p64
p36 CH4 ( p76 ) p36
193
2 ø 18.0 Slotted (40.0x18.0)
p69
Top View
125
50 50
247 50
660 660
755
35 6 160 200 200 200 200 200 160 6 35
Front View
A
p80
24
CH4 ( p76 )
440
245
40 184
2 ø 22.0
6
2 ø 22.0
10
60
p35
174
A-A
p35
174 50
320
p64
p80
A
Material list for 1 CHUTE assembly marked CH4 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass
p35 2 PLT10*223.9 224 S355JR 0.2 7.9 Front View
4 04 Issued for Approval 2018-04-23
p36 2 FL10*200 224 S355JR 0.2 7.0 3 03 Issued for approval 2018-04-20
p64 1 FL6*65 988 S355JR 0.1 3.0 Rev Mark Revision Description Date
p68 2 FL6*65 699 S355JR 0.2 4.3 Drawn FDT
p69 1 FL6*65 1462 S355JR 0.2 4.5
KENMORE CRUSHING SOLUTIONS Scale 1:7.5
p70 2 FL6*65 723 S355JR 0.2 4.4 ASNKO PLANT PHASE II Issued 16.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
QUALITY CONTROL
75
32
54
Front View
25 100 25 25 100 25
150 150
1 813
1 913
2 922
3 422
3 922
4 422
4 922
5 422
5 922
6 068
813
913
2 772
3 272
3 772
4 272
4 772
5 272
5 772
RD 813 100 900 100 859 150 350 150 350 150 350 150 350 150 350 150 350 150 146 A-A
Top View
Top View
54
6 076 (C178*54 x 6068)
27
8 6 068
Front View
p2
60
56 1 796 2 126 2 040 50
2 ø 18.0
1 852
3 978
6 018
56
60
6 068
C
B Bottom View
138 20
60
CS1 ( m41 ) B-B
Top View
59
A 2 ø 18.0
2 ø 18.0
m2
C 2 ø 18.0
40 60 40
B A
6 068
2 ø 18.0
140
6 009
Front View
34
1 843
3 969
RD
34 1 808 2 126 2 040 59 40 85
5 320
5 420
6 068
2x p292 2 ø 14.0 2 ø 18.0 C-C
2 ø 18.0 2 ø 18.0 2 ø 18.0 2 ø 18.0
32
2 ø 14.0 2 ø 18.0
2 ø 14.0 2 ø 14.0
2 ø 18.0
Bottom View
QUALITY CONTROL
75
32
Front View
25 100 25 25 100 25
146
1 296
1 796
2 296
2 796
3 296
4 156
4 256
5 156
5 256
296
796
1 146
1 646
2 146
2 646
3 146
6 068
RD
646
146 150 350 150 350 150 350 150 350 150 350 150 350 150 859 100 900 100 813
40 60 40
6 068 8
140
6 012 56
Front View
6 012
85 40 2 ø 18.0
6 068 6 068
RD
125
50 2 040 2 126 1 852
2 090
4 216
Bottom View
50
B-B
Top View
BC A
2x p292
15
60
138 20
54
CS2 ( m42 ) A
27
59
Front View
2 ø 18.0
2 ø 18.0 B p2
60
54
C
2 ø 18.0
166
60
59
2 100
4 226
6 068
60
2 ø 18.0
52
59 2 040 2 126 1 843
6 068
Bottom View
C-C
6 034
6 034 34
Front View
6 068
649
749
32
2 ø 14.0
QUALITY CONTROL
32
4 164
2 964
1 764
564
470
4 264
3 064
1 864
664
345
100 1 100 100 1 100 100 1 100 100 219
221
25
687 100 3 819
249
470
Front View
Top View
100
100
p290
149
4 606
25
149
2 531 2 021
RD
4 748
2 217
196
416
5 50 2 ø 14.0
2 ø 18.0 54
470
28
60
37
CS3 ( m43 ) m47
56
8
A-A
2 ø 18.0 A
60
178
A
59
62
5 075 (C178*54 x 4606) 2 ø 18.0
4 758
2 226
196
272
2 531 2 030 468
Front View
100 2 900 100 1 301
4 746
4 646
1 746
1 646
345
2 ø 14.0 2 ø 14.0 2 ø 14.0 2 ø 14.0 2 ø 14.0
32
2 ø 14.0
Bottom View
QUALITY CONTROL
32
32
1 419
1 519
2 619
2 719
3 819
3 919
219
319
4 606
RD
219 100 1 100 100 1 100 100 1 100 100 687 470
221
3 819 100 687 p290
25 100 25
249
470
2 ø 14.0
Front View
Top View
149 100
149
468 4 606
RD
2 021 2 531 54
2 021
4 552
470 54
4 606
150
28 A-A
A
37
60
A m48 CS4 ( m45 )
8
178
59
4 606
2 ø 18.0
2 ø 18.0
4 561
2 ø 18.0 2 030
468
Front View
4 301
4 401
4 606
2 ø 14.0 2 ø 14.0 2 ø 14.0 2 ø 14.0
32
2 ø 14.0 2 ø 14.0
Bottom View
32
QUALITY CONTROL
22
25 100 25 25 100 25 Start date :...............................
25 100 25 25 100 25 25 100 25
Complete Date :.......................
3 467
Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
1 054
1 554
1 654
2 154
2 254
2 754
2 854
3 333
3 433
Released for welding by :...................................................
354
454
954
Date :.......................................
RD 354 100 500 100 500 100 500 100 500 100 479 100
34
Top View
6 525 (C178*54 x 3467)
3 467 3 058
44 2 558 865
2 602
3 467
44
3 067
470 100
925
100
CS5 ( m49 ) 831
2x p295 98 100 404
62
62 40
56
56
38
2 ø 14.0
10
63
m39
2 ø 14.0
2 ø 18.0
240
2 ø 14.0 A
60
59
2 ø 18.0
2 ø 18.0
2 ø 14.0
60
2 ø 18.0
59
A
775
39
100
2 597
3 467
RD 2 185
39 2 558 870
Front View
RD
258 100 1 890 100 1 119
2 248
2 348
3 467
258
358
2 ø 14.0
p294 p291
p293 p294
32
2 ø 14.0 2 ø 14.0 2 ø 14.0 2 ø 14.0
2 ø 14.0 2 ø 14.0
2 ø 14.0
Bottom View
Top View
Front View
178
Bottom View
A-A
4 04 Issued for Approval 2018-04-23
Material list for 1 CONVEYOR STRINGER assembly marked CS5 - only 1 assembly is required 3 03 Issued for approval 2018-04-20
Mark No Profile Length Grade Paint area Mass Rev Mark Revision Description Date
m39 1 C178*54 3067 S355JR 1.7 44.5 Drawn FDT
m49 1 C178*54 3467 S355JR 1.9 50.3
KENMORE CRUSHING SOLUTIONS Scale 1:15
p291 1 FL10*150 54 S355JR 0.0 0.6 ASNKO PLANT PHASE II Issued 23.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
32
54
QUALITY CONTROL
54
22
25 100 25 Name :........................................Clock No :........................
25 100 25 25 100 25 25 100 25
25 100 25 Start date :...............................
9 100 2 954 354 Complete Date :.......................
25 25 Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
34
3 467
RD Released for welding by :...................................................
Top View
3 058 RD 865 2 558 44
3 423
865
34 100 479 100 500 100 500 100 500 100 500 100 340 14
3 467
3 067
0 470
613 100 212 10
98 2x p295
831
100 100
62
62
56
56
404
38
40
10
63
CS6 ( m50 )
240
60
m40
59
3 467
2 ø 18.0 2 ø 18.0
60
3 428
2 ø 18.0
2 ø 18.0
59
870
A
870 2 558 39
Front View
1 119
1 219
3 109
3 209
3 467
2 ø 14.0 p291 2 ø 14.0 p294 p294 p293
2 ø 14.0 2 ø 14.0 2 ø 14.0 2 ø 14.0 2 ø 14.0
32
Drawn
178
Total for 1 assembly 3.8 112.8 1 'CONVEYOR STRINGER' required marked CS6 Tel: 011 768 7508 Fax: 086 600 7508
Helderkruin 1733, South Africa
vdcc@vodamail.co.za A [CS.6] 4
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 1 All profile notches to have 11mm radius unless noted otherwise
32
A
1 050
2 150
2 250
3 350
3 450
4 550
4 650
5 080
950
0
C178*54 x 5080
Top View
2 267
2 367
5 080
2 267 100 2 713
0
32
Bottom View
5 080
5 052
28
2 576 2 585
5 016 5 025
100
50 59
5 080
16
50 9 2 517 9 2 431 9 55
0
2 ø 18.0 2 ø 18.0
59
60
CS7
2 ø 18.0 16
28
100
28
0
Back View
Top View
Back View
Bottom View
A-A
4 04 Issued for Approval 2018-04-23
3 03 Issued for approval 2018-04-20
Rev Mark Revision Description Date
Drawn FDT
KENMORE CRUSHING SOLUTIONS Scale 1:5
The part shown is required for the following assemblies:- ASNKO PLANT PHASE II Issued 16.04.2018
1 required in 1 'CONVEYOR STRINGER' assembly marked CS7
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
A
32
1 631
1 731
2 831
2 931
4 031
4 131
5 080
431
531
0
C178*54 x 5080
Top View
2 713
2 813
5 080
2 713 100 2 267
0
32
2 ø 14.0 2 ø 14.0 2 ø 14.0 2 ø 14.0 2 ø 14.0
Bottom View
28
100
28
0
2 ø 18.0 16
2 ø 18.0 2 ø 18.0
59
60
CS8
55 9 2 431 9 2 517 9 50
2 504 2 495
5 031 5 021
5 080
64 55
0
16
100
28
5 052
5 080
Back View
Top View
Back View
Bottom View
A-A
4 04 Issued for Approval 2018-04-23
3 03 Issued for approval 2018-04-20
Rev Mark Revision Description Date
Drawn FDT
KENMORE CRUSHING SOLUTIONS Scale 1:5
The part shown is required for the following assemblies:- ASNKO PLANT PHASE II Issued 16.04.2018
1 required in 1 'CONVEYOR STRINGER' assembly marked CS8
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
C178*54 x 1360
Top View
1 360
1 333
27
27 1 306 27
0
2 ø 18.0
2 ø 18.0
60
60
CS9
Back View
Top View
Back View
A-A
25
25
2 000
A-A
27
1 323
1 296
1 350
27
27
0
1 295
1 645
1 795
2 038
145
295
645
795
0
A=-90°
22 1 994 22
4 04 Issued for Approval 2018-04-23
PLT3*1350 x 2038 3 03 Issued for approval 2018-04-20
Rev Mark Revision Description Date
Drawn FDT
Front View KENMORE CRUSHING SOLUTIONS Scale 1:5
The part shown is required for the following assemblies:- ASNKO PLANT PHASE II Issued 16.04.2018
1 required in 1 'DECK PLATE' assembly marked DP1
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
25
25
A-A
27
1 323
1 296
1 350
27
27
0
295
645
795
1 145
1 295
2 038
0
A=-90°
22 1 994 22
QUALITY CONTROL
32
Checked by Supervisor :....................................................
38
Checked by Inspector :.......................................................
57
Released for welding by :...................................................
25
Date :.......................................
535
100 125 25
150
Top View
RD
71
A B
DR1 ( p62 )
150
8
RD
79
m115
25
150
79 150
1 ø 18.0
250
150
342
150
Front View
Front View
250 14
500
350
350
350
175
8
250
71
429 500
71
485
Bottom View
500 500 500 B-B
75
A B
Bottom View
40 57 125 25
150
M16 THREADED ROD
WITH M16 LOCK NUT
125 25
m98
25
p27
57
57
38
32
Material list for 1 DOOR assembly marked DR1 - only 1 assembly is required 1 ø 18.0 4 04 Issued for Approval 2018-04-23
Mark No Profile Length Grade Paint area Mass m115 WASHER 1 ø 18.0 3 03 Issued for approval 2018-04-20
HD2 1 M16_NUT 16 S355JR 0.0 0.1
Bottom View Rev Mark Revision Description Date
m97 1 D16 50 S355JR 0.0 0.1 Drawn FDT
m98 1 D16 283 S355JR 0.0 0.4
KENMORE CRUSHING SOLUTIONS Scale 1:5
m115 1 D40 4 S355JR 0.0 0.0 ASNKO PLANT PHASE II Issued 16.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
140
130
50
QUALITY CONTROL
113
Checked by Inspector :.......................................................
RD
937
Released for welding by :...................................................
113 824
Date :.......................................
Top View
74
Top View
385
GA4 ( g13 )
p310
379
6
Front View
p308
178
948
6
130
140
p310
379
6
74
6
Bottom View
A-A
335 178 6 A
412
6
341
937
RD 341 596
937 6
Front View
2x p309 p309 BS
p312 p311 p313
p308
130
140
1 ø 14.0
Bottom View
Material list for 1 Grating assembly marked GA4 - only 1 assembly is required 5 05 Issued for Approval 2018-04-26
Mark No Profile Length Grade Paint area Mass 4 04 Issued for Approval 2018-04-23
g13 1 OG25*936.9 948 RS40 25*4.5 1.8 0.0 Rev Mark Revision Description Date
p308 2 FLT6*130 178 S355JR 0.1 2.2 Drawn FDT
p309 4 FLT6*74 130 S355JR 0.1 1.8
KENMORE CRUSHING SOLUTIONS Scale 1:7.5
p310 2 FLT6*130 379 S355JR 0.2 4.6 ASNKO PLANT PHASE II Issued 26.04.2018
OXIDE LOADING STATION Revised 2018-04-26
Tekla structures
QUALITY CONTROL
18 68 765 765 68 18
Name :........................................Clock No :........................
Start date :...............................
Complete Date :.......................
16 50 50
50 Checked by Supervisor :....................................................
Date :.......................................
1 ø 12.0 1 ø 12.0
25
1 ø 12.0
1 ø 12.0
A B C
Top View
85 765 765
Top View
20
Top View
L35*35*3 x 1700 20
20
Top View
m137
m137
30
1 ø 12.0
30
30
p117
m133
615
698
698
Back View
1 023
Back View
Back View
1 023
983
997
325
166
325
166
325
325
m133
242
m128
RD
RD
6
6
1 700
83
1 615
83
85
RD
850
1 700
Back View
Material list for 1 GAURD FRAME assembly marked GF2 - only 1 assembly is required 4 04 Issued for Approval 2018-04-23
Mark No Profile Length Grade Paint area Mass 3 03 Issued for approval 2018-04-20
m128 1 L35*35*3 1700 S355JR 0.2 2.7 Rev Mark Revision Description Date
m131 1 L35*35*3 1700 S355JR 0.2 2.7 Drawn FDT
m133 2 L35*35*3 1023 S355JR 0.3 3.2
KENMORE CRUSHING SOLUTIONS Scale 1:7.5
m137 3 D10 30 S355JR 0.0 0.0 ASNKO PLANT PHASE II Issued 20.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
1 615
1 700
850
85
QUALITY CONTROL
200
Released for welding by :...................................................
Date :.......................................
m130
1 ø 12.0
4x p113
REMOVE ALL BURS
AND SHARP EDGES
166
150
p116
939
809
18 17
35
6
GF3 ( m131 )
25
1 ø 12.0
R
35
1 089
1 034 Back View
1 ø 12.0
160
1 273
1 ø 12.0
p112
929
1 ø 12.0
291
2x m129
1 840
30
2 ø 12.0
2 ø 12.0
638 35
35
30
1 034
260
2x m129 m131
35
378
77
m191
m191
m191
150
m191
18 68 765 765 68 17
303
m130
1 ø 12.0 95 1 700 95
4x p113
200
75 1 ø 12.0
GF3 ( m131 ) 1 890 (L35*35*3 x 1700)
75
RD
Front View
20 20
70 Bottom View 70
Material list for 1 GAURD FRAME assembly marked GF3 - only 1 assembly is required 4 04 Issued for Approval 2018-04-23
Mark No Profile Length Grade Paint area Mass 3 03 Issued for approval 2018-04-20
m129 4 L35*35*3 60 S355JR 0.0 0.4 Rev Mark Revision Description Date
m130 2 L35*35*3 1973 S355JR 0.5 6.2 Drawn FDT
m131 2 L35*35*3 1700 S355JR 0.5 5.3
KENMORE CRUSHING SOLUTIONS Scale 1:7.5
m191 4 D16 287 S355JR 0.1 1.6 ASNKO PLANT PHASE II Issued 20.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
1 004
884
75
QUALITY CONTROL
25
50
m134
A 2 ø 12.0 B Top View
REMOVE ALL BURS
p115 724 260 AND SHARP EDGES
L35*35*3 x 1004
Top View
20
20
1 515
30
3
Top View
1 515
1 190
Back View
1 115
1 190
1 489
2x m87
Back View
m191
2x m137
m191
325
1 004
325
150
325
984
724
RD 724 260 20
325
RD
20
250
1 004
6
20 984
83
RD
Back View
6
83 B-B
Material list for 1 GAURD FRAME assembly marked GF8 - only 1 assembly is required 4 04 Issued for Approval 2018-04-23
Mark No Profile Length Grade Paint area Mass A-A 3 03 Issued for approval 2018-04-20
m87 2 L35*35*3 1515 S355JR 0.4 4.7 Rev Mark Revision Description Date
m132 1 L35*35*3 1004 S355JR 0.1 1.6 Drawn FDT
m134 1 L35*35*3 1004 S355JR 0.1 1.6
KENMORE CRUSHING SOLUTIONS Scale 1:7.5
m137 2 D10 30 S355JR 0.0 0.0 ASNKO PLANT PHASE II Issued 20.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
1 004
929
75
at position shown for correct site orientation
18 969 18
QUALITY CONTROL
50
1 ø 12.0 Complete Date :.......................
Checked by Supervisor :....................................................
25
Checked by Inspector :.......................................................
m135
2 ø 12.0 Released for welding by :...................................................
A B C
Date :.......................................
GF9 ( m132 )
366 260
REMOVE ALL BURS
L35*35*3 x 1004
AND SHARP EDGES
p115 Top View
Top View
Top View
1 515
20
Top View
20
20
1 515
10
30
915
990
30
3
75
1 515
Back View
990
m191
Back View
Back View
525
2x m87
150
1 489
2x m137 m191
525
450
525
1 004
366
626
RD
75
6
B-B
525
Back View
A-A
Material list for 1 GAURD FRAME assembly marked GF9 - only 1 assembly is required 4 04 Issued for Approval 2018-04-23
RD
Mark No Profile Length Grade Paint area Mass 3 03 Issued for approval 2018-04-20
m87 2 L35*35*3 1515 S355JR 0.4 4.7 Rev Mark Revision Description Date
6
1 004
120
929
QUALITY CONTROL
50
Released for welding by :...................................................
25
2 ø 12.0 m136
A B REMOVE ALL BURS
260 724 AND SHARP EDGES
p115
L35*35*3 x 1004
Top View
Top View
Top View
20
1 515
1 515
3
30
1 115
1 190
1 190
1 509
Back View
2x m87
Back View
1 515
1 512
1 489 75
2x m137 m191
m191
325
150
20
1 004
RD
280
325
20 260 724
325
250
325
RD
Back View
6
RD
Material list for 1 GAURD FRAME assembly marked GF10 - only 1 assembly is required B-B 4 04 Issued for Approval 2018-04-23
Mark No Profile Length Grade Paint area Mass 3 03 Issued for approval 2018-04-20
m87 2 L35*35*3 1515 S355JR 0.4 4.7 Rev Mark Revision Description Date
m132 1 L35*35*3 1004 S355JR 0.1 1.6 A-A Drawn FDT
m136 1 L35*35*3 1004 S355JR 0.1 1.6
KENMORE CRUSHING SOLUTIONS Scale 1:7.5
m137 2 D10 30 S355JR 0.0 0.0 ASNKO PLANT PHASE II Issued 20.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
929
1 004
75
QUALITY CONTROL
18 969 18 Name :........................................Clock No :........................
Start date :...............................
Complete Date :.......................
75 854 75
Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
2x p114
A B C Released for welding by :...................................................
1 ø 12.0 1 ø 12.0
GF11 ( m132 ) Date :.......................................
m87
25
50
m85
2 ø 12.0
AND SHARP EDGES
A B C
p115
378 260
L35*35*3 x 1004
Top View
Top View
20
30
3
20
10
30
3
915
990
Back View
m87
Back View
1 509
2x m137
75
m191
1 004
378
638
525
150
20
1 004
20 984
Back View
525
450
B-B
Material list for 1 GAURD FRAME assembly marked GF11 - only 1 assembly is required 4 04 Issued for Approval 2018-04-23
RD
Mark No Profile Length Grade Paint area Mass 3 03 Issued for approval 2018-04-20
m85 1 L35*35*3 1004 S355JR 0.1 1.6 Rev Mark Revision Description Date
6
QUALITY CONTROL
1 750
p56 Date :.......................................
p223
250
1 500
2x p58 FS
250
1 250
Top View
250
1 000
48 250 250 250 250 250 250 250 48
1 845
250
750
D D
250
Front View
500
1 845
2x p58 FS
250
1 798
25
250
935
RD 935 863 48
250
GR1 ( m116 )
0
12 4 500 12
1 845
5
p56
p223
B
p56
70
12
Front View
100
100
40
p306
p58
1 255 1 283
A 1 ø 32.0
50 50 402
355 383
4 500
B
953
1 845
953 3 547
0
Front View
B-B
Top View
m274
12
70 12
Material list for 1 GRIZZLY assembly marked GR1 - only 1 assembly is required
60
Mark No Profile Length Grade Paint area Mass 5 05 Issued for Approval 2018-04-26
60
m116 8 RAIL_22 4500 S355JR 0.0 812.3 1 ø 40.0 4 04 Issued for Approval 2018-04-23
m274 1 D16 224 S355JR 0.0 0.3 8 104 8 60 60 Rev Mark Revision Description Date
p56 3 FL12*100 1845 S355JR 1.2 52.1 Drawn FDT
p58 4 FL12*100 70 S355JR 0.1 2.7
KENMORE CRUSHING SOLUTIONS Scale 1:15
p223 1 PLT5*833.3 1845 BENNOX 3.1 60.3 D-D ASNKO PLANT PHASE II Issued 26.04.2018
OXIDE LOADING STATION Revised 2018-04-26
Tekla structures
QUALITY CONTROL
95
1 750
Released for welding by :...................................................
p56
p223
250
Date :.......................................
D D
p56
m116
1 500
95
2x p58 FS
p58
250
p58
m116 p56 Top View
1 250
1 845
250
m116
1 000
1 845
5
250
m116
C C 750
2x p58 FS p58
1 ø 32.0
250
Front View
m116
500
p58
1 450 1 478
250
m116
550 578
250
1 845
250
GR2 ( m116 )
RD 550 28 872 28 367
Top View
B-B
Top View
4 524 (RAIL_22 x 4500)
12 4 500 12
50 50 402
A 48 250 250 250 250 250 250 250 48
B
p56 p56
12
Front View
100
95
100
40
p223 p56
p58
B 1 ø 32.0
A
1 003
50 50
48
25
1 845
RD
953
935
4 500
48 887 910
953 50 3 497
0
Top View
Top View
p301
m274
70 12
Material list for 1 GRIZZLY assembly marked GR2 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass 5 05 Issued for Approval 2018-04-26
m116 8 RAIL_22 4500 S355JR 0.0 812.3 4 04 Issued for Approval 2018-04-23
60
m274 1 D16 224 S355JR 0.0 0.3 Rev Mark Revision Description Date
60
QUALITY CONTROL
HF2 ( m84 ) A
HF2 ( m84 )
260 980 200
2 ø 18.0
2 ø 18.0 2 ø 18.0 2 ø 18.0
40
80
50 1 600 50
240
m114
m114
2 ø 22.0 2 ø 22.0
942
m100
1 077
50 120 1 360 120 50
2 ø 32.0
1 600
2 ø 18.0 Slotted (18.0x34.0)
m19
m65
m20
Front View
35
m69 m65
m20
470
60
m
2x p49
m114
m114
865
240
80
2 ø 18.0 2 ø 18.0
40
788
4 ø 18.0
m67
B-B
m99
m68
B B
m70
m114 A
40 260 40 40 200 40
40 80 240 1 600 240 80 40
980
A-A
Front View
Material list for 1 HEAD FRAME assembly marked HF2 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass
m19 1 L90*65*6 140 S355JR 0.0 1.0
m20 1 L90*65*6 140 S355JR 0.0 1.0
m65 1 PC200*75 1600 S355JR 0.8 38.9
m66 1 PC200*75 315 S355JR 0.2 7.7
m67 2 PC200*75 1224 S355JR 1.3 59.5 4 04 Issued for Approval 2018-04-23
m68 1 PC200*75 258 S355JR 0.1 6.3 3 03 Issued for approval 2018-04-20
m69 1 PC200*75 315 S355JR 0.2 7.7 Rev Mark Revision Description Date
m70 1 PC200*75 258 S355JR 0.1 6.3 Drawn FDT
m84 1 IPE200 1600 S355JR 1.2 35.8
KENMORE CRUSHING SOLUTIONS Scale 1:15 1:10
m99 1 PC260*90 2200 S355JR 1.5 76.6 ASNKO PLANT PHASE II Issued 16.04.2018
Tekla structures
Total for 1 assembly 11.3 481.8 1 'HEAD FRAME' required marked HF2 Tel: 011 768 7508 Fax: 086 600 7508 vdcc@vodamail.co.za A [HF.2] 4
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 2 All profile notches to have 11mm radius unless noted otherwise
8*375 x 656
606
656
50
50 556 50
0
L52 375
50
325
2 ø 14.0 CSK FS
275
375
50
50
0
2 ø 14.0 CSK FS
Front View
1 074
1 150
256
894
76
76 180 638 180 76
0
1 150
927
223
223
223
0
50
471
421
521
1 ø 14.0 CSK NS
50
50
0 0
8*521 x 1150
1 ø 14.0 CSK NS
Front View
50
50
450 450
500
400
400
50 50
50
50
0 0
700
750
50
0
8*500 x 750
Front View
597 597
1 ø 14.0 CSK NS
69
L55
528
251
218
346
310
597
260
346
50
50
1 ø 14.0 CSK NS
0 0
2 ø 14.0 CSK NS
50 650 50
700
750
50
0
8*597 x 750
Front View
8*597 x 750
597 597
1 ø 14.0 CSK FS
69
528
251
L56
218
346
310
597
260
346
50
50
1 ø 14.0 CSK FS
0 0
2 ø 14.0 CSK FS
50 650 50
700
750
50
0
Front View
8*647 x 734
648 648
1 ø 14.0 CSK NS
74
574
295
L57
255
353
648
319
2 ø 14.0 CSK NS
269
353
50
50
0 0
684
734
50
0
Front View
648 648
1 ø 14.0 CSK NS
74
L58
574
295
255
353
648
319
269
353
50
50
0 0
684
734
50
0
8*647 x 734
Front View
8*553 x 992
992
960
48
48 912 32
0
1 ø 14.0 CSK NS
L59 553
40
513
1 ø 14.0 CSK NS
463
553
50
1 ø 14.0 CSK NS
50
0
1 ø 14.0 CSK NS
Front View
8*553 x 992
944
992
48
48 896 48
0 1 ø 14.0 CSK NS
L60 553
40
513
1 ø 14.0 CSK NS
463
553
50
1 ø 14.0 CSK NS
50
0
1 ø 14.0 CSK NS
Front View
8*553 x 992
32
1 ø 14.0 CSK NS
944
992
32 912 48
0
553 L61
40
1 ø 14.0 CSK NS
513
463
553
1 ø 14.0 CSK NS
50
50
1 ø 14.0 CSK NS
Front View
8*644 x 811
59
585
133
L62
117
511
468
1 ø 14.0 CSK NS
644
418
50
1 ø 14.0 CSK NS
50
0
1 ø 14.0 CSK NS
50 711 50
761
811
50
0
Front View
8*513 x 698
513
1 ø 14.0 CSK NS
81
432
299
513
2 ø 14.0 CSK NS
165
134
84
165
50
50
0 0
648
698
50
0
Front View
1 000
349
349 651
318
318
0
765 765 765 765
56
1 ø 14.0 CSK NS 1 ø 14.0 CSK NS
709
110
152
655
612
L64
765
709
562
50
50
0 0 0
1 000
950
75
0
1 ø 14.0 CSK NS
1 000 (8*764 x 1000)
Front View
L65
59
596
161
204
1 ø 14.0 CSK NS
493
451
654
545
401
50 50
50
50
0 0
1 000
950
50
0
1 ø 14.0 CSK NS
1 000 (8*654 x 1000)
Front View
1 013
50
50 963
0
L66
59
272
163
205
2 ø 14.0 CSK NS
168
331
222
126
76
168
50 50
50
50
0 0 0 0
948 9 56
1 013
948
0
957
21
1 013
992
Front View
1 037
589
589 447
0
36
51
465
449
30
419
1 ø 14.0 CSK NS
L67
501
369
1 ø 14.0 CSK NS
50
50
0 0
1 037
136
605
954
983
0
1 ø 14.0 CSK NS
37
1 000
1 037
8*500 x 1037
Front View
8*466 x 993
943
993
50
50 893 50
0
54
79
L68
412
125
388
341
466
362
291
50 50
50
50
0 0
Front View
54
L69
59
2 ø 14.0 CSK NS
254
105
249
203
308
204
153
50 50
50
50
0 0 0
53 9 633 50
695
745
53
0
62
15
15
0
Front View
8*510 x 698
511 511
1 ø 14.0 CSK FS
81
430
381
511
380
161
130
80
161
50 50
50
50
0 0 0
648
698
50
0
2 ø 14.0 CSK FS
Front View
8*644 x 811
59
585
133
L71
511 176
468
1 ø 14.0 CSK FS
644
535
418
50 50
50
50
0 0
1 ø 14.0 CSK FS
50 711 50
761
811
50
0
1 ø 14.0 CSK FS
Front View
L72
59
434
161
204
2 ø 14.0 CSK NS
332
289
493
384
239
50 50
50
50
0 0
50 900 50
1 000
950
50
0
1 ø 14.0 CSK NS
1 000 (8*492 x 1000)
Front View
8*387 x 993
943
993
50
50 893 50
0
387 387
54
79
L73
333
308
71
262
2 ø 14.0 CSK NS
387
212
50
50
0
2 ø 14.0 CSK NS
Front View
1 000
349
349 651
318
318
0
765 765 765 765
56
1 ø 14.0 CSK FS 1 ø 14.0 CSK FS
709
110
152
655
612
L74
765
709
562
50
50
0 0 0
1 000
950
75
0
1 ø 14.0 CSK FS
1 000 (8*764 x 1000)
Front View
L75
59
596
161
204
1 ø 14.0 CSK FS
493
451
654
545
401
50 50
50
50
0 0
1 000
950
50
0
1 ø 14.0 CSK FS
1 000 (8*654 x 1000)
Front View
1 013
50
50 963
0
L76
59
272
163
205
2 ø 14.0 CSK FS
168
331
222
126
76
168
50 50
50
50
0 0 0 0
948 9 56
1 013
948
0
957
21
1 013
992
Front View
1 037
589
589 447
0
36
51
465
449
30
419
1 ø 14.0 CSK FS
1 ø 14.0 CSK FS
L77
501
369
1 ø 14.0 CSK FS 1 ø 14.0 CSK FS
50
50
0 0
1 037
136
605
954
983
0
37
1 000
1 037
8*500 x 1037
Front View
8*466 x 993
943
993
50
50 893 50
0
54
79
L78
412
388
71
341
2 ø 14.0 CSK FS
466
291
50
50
0
1 ø 14.0 CSK FS
Front View
54
L79
59
2 ø 14.0 CSK FS
254
105
249
203
308
204
153
50 50
50
50
0 0 0
15
15
0
53 9 633 50
695
745
53
0
Front View
62
L80
59
434
161
204
1 ø 14.0 CSK FS
2 ø 14.0 CSK FS
332
289
493
384
239
50 50
50
50
0 0
50 900 50
1 000
950
50
0
1 ø 14.0 CSK FS
1 000 (8*492 x 1000)
Front View
8*387 x 993
943
993
50
50 893 50
0
387 387
54
79
L81
333
308
71
262
2 ø 14.0 CSK FS
387
212
50
50
0
2 ø 14.0 CSK FS
Front View
50
589
539
639
50
50
1 ø 14.0 CSK NS
0
764
814
0
8*638 x 814
Front View
8*814 x 897
897
50
847
50 797 50 1 ø 14.0 CSK NS
0
L83 814
50
764
1 ø 14.0 CSK NS
664
814
100
1 ø 14.0 CSK NS
100
0
1 ø 14.0 CSK NS
Front View
8*638 x 752
110
702
752
110 592 50
0
1 ø 14.0 CSK FS
L85 638
50
588
1 ø 14.0 CSK FS
538
638
50
50
0
Front View
1 ø 14.0 CSK FS
754 L86
100
654 1 ø 14.0 CSK FS
754
604
50 1 ø 14.0 CSK FS
50
943
993
32
0
8*753 x 993
Front View
1 ø 14.0 CSK FS
L87 754
100
654
1 ø 14.0 CSK FS
754
604
50
50
1 ø 14.0 CSK FS
0
943
991
50
0
8*753 x 991
Front View
1 ø 14.0 CSK FS
754 L88
100
654 1 ø 14.0 CSK FS
754
604
50 1 ø 14.0 CSK FS
50
941
991
48
0
8*753 x 991
Front View
1 ø 14.0 CSK FS
L89 754
100
654
1 ø 14.0 CSK FS
754
604
50
50
1 ø 14.0 CSK FS 0
961
993
46
0
8*753 x 993
Front View
50
589
639
539
1 ø 14.0 CSK NS
50
50
50 689 75
1 ø 14.0 CSK NS
739
814
50
0
8*638 x 814
Front View
1 ø 14.0 CSK NS
L91 814
75
739
1 ø 14.0 CSK NS
814
689
50
1 ø 14.0 CSK NS
50
0
847
897
50
0
8*814 x 897
Front View
8*638 x 752
100
677
752
100 577 75
0
638 L93
50
1 ø 14.0 CSK FS
588
1 ø 14.0 CSK FS
638
538
50
50
Front View
8*752 x 896
896
50
1 ø 14.0 CSK FS
846
50 796 50
0
752 L94
50
702 1 ø 14.0 CSK FS
592
752
1 ø 14.0 CSK FS
Front View
1 ø 14.0 CSK FS
752 L95
75
677 1 ø 14.0 CSK FS
577
752
0
1 ø 14.0 CSK FS
50 796 50
846
896
50
0
8*752 x 896
Front View
1 043
640
640 403
1 043
398
611
398 213 432
0
1 ø 14.0 CSK NS 1 ø 14.0 CSK NS
50
656
60
596
706
546
50
50
0 0
50 993
1 ø 14.0 CSK NS
1 043
50
0
8*705 x 1043
Front View
1 043
640
640 403
1 043
398
611
398 213 432
0
1 ø 14.0 CSK FS
50
656
60
596
706
WELDED SOCKET
546
50
50
0 0
50 993
1 ø 14.0 CSK FS
1 043
50
0
8*705 x 1043
Front View
8*814 x 897
897
50
399
847
50 349 448 50 1 ø 14.0 CSK NS
0
814 L98 814
50
764
1 ø 14.0 CSK NS
401
664
413
814
413
100
100
0 0
Front View
8*814 x 897
897
50
499
847
50 449 348 50 1 ø 14.0 CSK NS
0
L99 814
50
764
1 ø 14.0 CSK NS
351
HOLE TO CLEAR 1 "
WELDED SOCKET
413
814
313
100
1 ø 14.0 CSK NS
100
0
Front View
896
50
1 ø 14.0 CSK FS
846
50 796 50 1 ø 14.0 CSK FS
0
752 L100 752
50
702
380
HOLE TO CLEAR 1 "
WELDED SOCKET
592
752
372
372
1 ø 14.0 CSK FS
110
110
0 0
498 398
1 ø 14.0 CSK FS
498
896
0
1 ø 48.0
8*752 x 896
Front View
896
50
1 ø 14.0 CSK FS
846
50 796 50
0
752 L101
50
702 1 ø 14.0 CSK FS
330
372
262
398 498
1 ø 14.0 CSK FS
398
896
0
1 ø 48.0
8*752 x 896
Front View
75
739
1 ø 14.0 CSK NS
419
HOLE TO CLEAR 1 "
WELDED SOCKET
814
395
689
395
50
50
0 0
847
897
50
0
8*814 x 897
Front View
75
739
1 ø 14.0 CSK NS
344
HOLE TO CLEAR 1 "
WELDED SOCKET
814
395
345
50
1 ø 14.0 CSK NS
50
0
847
897
50
0
8*814 x 897
Front View
1 ø 14.0 CSK FS
1 ø 48.0 1 ø 14.0 CSK FS
752 L104 752
75
677
386
577
752
366
366
100
100
0 1 ø 14.0 CSK FS 0
1 ø 14.0 CSK FS
50 448 348 50
498
846
896
50
0
8*752 x 896
Front View
1 ø 14.0 CSK FS
1 ø 48.0
752 L105
75
677 1 ø 14.0 CSK FS
311
366
266
0
1 ø 14.0 CSK FS
50 348 448 50
398
846
896
50
0
8*752 x 896
Front View
293
502
900
293 210 398
0
1 ø 48.0 1 ø 14.0 CSK NS
258
0 258
1 ø 14.0 CSK NS
50
656
60
596
706
546
1 ø 14.0 CSK NS
50
50
0 0
1 ø 14.0 CSK NS
71 779 50
850
900
71
0
8*705 x 900
1 045
1 448
403
1 016
1 448
50
1 ø 48.0
398
50 348 618 432
0
1 ø 14.0 CSK NS
656
55
600
706
527
73
73
0 0
1 349
1 448
0
8*705 x 1448
Front View
258
1 159
258
1 109
1 ø 48.0
293
761
293 469 348 50 1 ø 14.0 CSK NS
0
L108 706 706
1 ø 14.0 CSK NS
50
656
56
600
706
527
1 ø 14.0 CSK NS
73
73
0 0
80 1 079
1 ø 14.0 CSK NS
1 159
80
0
8*705 x 1159
Front View
293
502
900
293 210 398
258
258 1 ø 48.0 1 ø 14.0 CSK FS
0
L109 706 706
1 ø 14.0 CSK FS
50
656
60
596
706
546
1 ø 14.0 CSK FS
50
50
0 0
1 ø 14.0 CSK FS
71 779 50
850
900
71
0
1 045
1 448
403
1 016
1 448
50
1 ø 48.0
398
50 348 618 432
0
1 ø 14.0 CSK FS
656
55
600
706
527
73
73
0 0
1 349
1 448
0
8*705 x 1448
Front View
258
1 159
258
1 109
1 ø 48.0
293
761
293 469 348 50 1 ø 14.0 CSK FS
0
L111 706 706
1 ø 14.0 CSK FS
50
656
56
600
706
527
1 ø 14.0 CSK FS
73
73
0 0
80 1 079
1 ø 14.0 CSK FS
1 159
80
0
8*705 x 1159
Front View
82
82
0
1 ø 14.0 CSK FS
115
606
656
50
50 65 491 50
0
497 L112 497 497
50
447
192
1 ø 14.0 CSK FS
305
397
497
305
50
50
0 0 0
Front View
541
606
656
50
50 491 65 50
574
656
82
50
447
192
305
497
397
305
1 ø 14.0 CSK FS
50
50
0 0 0
Front View
1 096
548
548 548 1 ø 14.0 CSK NS
0
812 812 L114 812 812
50
762
199
234
613
578
1 ø 14.0 CSK NS
812
762
528
50
50
0 0 0
1 046
1 096
50
0
8*812 x 1096
Front View
1 096
548
548 548 1 ø 14.0 CSK FS
0
812 812 L115 812 812
50
762
199
234
613
578
1 ø 14.0 CSK FS
812
762
528
50
50
0 0 0
1 046
1 096
50
0
8*812 x 1096
Front View
8*750 x 918
918
50
868
50 818 50 1 ø 14.0 CSK NS
0
L116 750 750
50
700
1 ø 14.0 CSK NS
650
750
50
50
1 ø 14.0 CSK NS
0 0
1 ø 14.0 CSK NS
Front View
71
540
334
389
L117
612
490
277
222
277
172
50 50
50
50
0 0 0 0
868
918
50
0
Front View
8*750 x 1096
1 096
1 046
50
50 996 50 1 ø 14.0 CSK FS
0
L118 750
50
700
1 ø 14.0 CSK FS
650
750
50
50
1 ø 14.0 CSK FS
0
1 ø 14.0 CSK FS
Front View
279
279
889
0
313
839
313 526 50 1 ø 14.0 CSK NS
0
L119 750 750
1 ø 14.0 CSK NS
50
700
650
750
1 ø 14.0 CSK NS
50
50
0 0
1 ø 14.0 CSK NS
72 767 50
839
889
72
0
8*750 x 889
Front View
71
540
334
389
L120
612
490
277
222
277
172
50 50
50
50
0 0 0 0
868
918
50
0
Front View
279
279
889
0
313
839
313 526 50 1 ø 14.0 CSK FS
0
L121 750 750
1 ø 14.0 CSK FS
50
700
650
750
1 ø 14.0 CSK FS
50
50
0 0
1 ø 14.0 CSK FS
72 767 50
839
889
72
0
8*750 x 889
Front View
149
102
968
102 47 819
968
50
2 ø 14.0 CSK NS
168
918
50 118 750 50 1 ø 14.0 CSK NS
0
812 812 L122 812 812
50
50
762 762
166
196
646 42
604
566
712
812
516
604
50 50
50
50
0 0 0 0
Front View
149
102
968
102 47 819
968
50
2 ø 14.0 CSK FS
168
918
50 118 750 50 1 ø 14.0 CSK FS
0
812 812 L123 812 812
50
50
762 762
166
196
646 42
604
566
712
812
516
604
50 50
50
50
0 0 0 0
Front View
317
RD 290 300 300 300 300 300 300 300 300 300 300 300 278 60 1 005 p237 Date :.......................................
p237
1 190
1 490
1 790
2 090
2 390
2 690
2 990
3 290
3 590
3 868
3 928
4 933
290
590
890
4 5°
2 443
Front View
410
442
35
Top View
p238
45
p237
65
p237
p237
610
450
415
382
350
p259
317
p237 p237
45°
45
p259
35
Front View
3 738
4 933
442
3 738 1 195
B-B
p239
Top View
229
LA1 ( p253 )
m232
33
2 490 634 614 583 563 50
2 490
3 124
3 738
4 320
4 883
4 933
p252
5 450 5
50 50
D C B
D-D
p237 BS
Top View
p237 BS
p237
800
p237
p237
317
2x p238
2x p239
p237
p240
p237
45°
A
LA1 ( p253 )
32
p252
A D m200 BS
410
60
R 175
443
415
231
685
107
2 ø 18.0 LA1 ( p253 ) p252
Front View
31 34
p259 p240
m200
C B
242
242
105 1 ø 18.0
1 ø 18.0
m200
3 928
1 190
1 490
1 790
2 090
2 390
2 690
2 990
3 290
3 590
3 868
4 933
60
75
32
290
590
890
RD 290 300 300 300 300 300 300 300 300 300 300 300 278 60 1 005
65
33
p259
p259
10 4 933 206
2 ø 18.0 30 486 30 2 ø 18.0
C-C
Front View
Top View
610
Material list for 1 Stringer assembly marked LA1 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass
m200 2 L60*60*6 50 S355JR 0.0 0.5 450
m232 12 D20 460 S355JR 0.3 12.3
Front View
p252 1 FL10*65 4948 S355JR 0.7 25.3 ASNKO PLANT PHASE II Issued 26.04.2018
Tekla structures
Total for 1 assembly 5.1 153.9 1 'Stringer' required marked LA1 Tel: 011 768 7508 Fax: 086 600 7508 vdcc@vodamail.co.za A [LA.1] 5
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 1 All welds 6mm continuous fillet welds unless noted otherwise
Corrosion protection: As per Architect / Engineer
Ends of Column Shaft to be Machine Sawn True & Square
All profile notches to have 11mm radius
659 8 All steelwork to be hardstamped with the Job Number,
at position shown for correct site orientation
QUALITY CONTROL
p10 LC1 ( p106 ) Name :........................................Clock No :........................
Start date :...............................
70 4 016 70 Complete Date :.......................
p5
Checked by Supervisor :....................................................
30 40 158 200 200 200 175 175 175 175 200 175 175 175 175 200 175 175 175 175 200 200 200 158 40 30 C Checked by Inspector :.......................................................
37 9 898 104 900 104 900 104 601 274 85 41 Released for welding by :...................................................
30 Date :.......................................
B
763
A
p6
1 021
8
p5
16
p10 p10
52
32
LC1 ( p106 )
27
p4
1 ø 14.0
p8
180
1 ø 14.0
258
180
598
B
826
180
176 349 134
51
180
630 A-A
D
91
50
2 ø 14.0
74
12
13
877
C
30
86 p9
52 535 80 52 84 40
17
18 74
872 150 D-D
30 A
D 121 150
150
53
82
22
23 355 179 703
15
446 1 ø 14.0 1 ø 14.0
140 30 48 180 180 180 90
29
p10
58
711
76
Top View
43
1 ø 14.0 1 ø 14.0
70 4 016 70
30 40 40 30
59
B-B
52 418 54
90
180
C-C
180
737
180
77
30
70 158 200 200 200 175 175 175 175 200 175 175 175 175 200 175 175 175 175 200 200 200 158 70
Front View
Material list for 1 LANGLAAGTE CHUTE assembly marked LC1 - only 1 assembly is required 4 04 Issued for Approval 2018-04-23
Mark No Profile Length Grade Paint area Mass 3 03 Issued for approval 2018-04-20
p4 1 PLT8*506.8 3763 S355JR 2.8 119.8 Rev Mark Revision Description Date
p5 1 PLT8*774.3 4029 S355JR 3.8 195.9 Drawn FDT
p6 1 PLT8*660 1523 S355JR 1.5 63.3
KENMORE CRUSHING SOLUTIONS Scale 1:10
p8 1 FL8*70 883 S355JR 0.1 3.8 ASNKO PLANT PHASE II Issued 19.04.2018
Tekla structures
Total for 1 assembly 9.2 409.7 1 'LANGLAAGTE CHUTE' required marked LC1 Tel: 011 768 7508 Fax: 086 600 7508 vdcc@vodamail.co.za A [LC.1] 4
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 1 All welds 6mm continuous fillet welds unless noted otherwise
Corrosion protection: As per Architect / Engineer
Ends of Column Shaft to be Machine Sawn True & Square
All profile notches to have 11mm radius
All steelwork to be hardstamped with the Job Number,
at position shown for correct site orientation
QUALITY CONTROL
p7
p9 Name :........................................Clock No :........................
Start date :...............................
Complete Date :.......................
Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
Released for welding by :...................................................
p8 Date :.......................................
Top View
Front View
Back View
Top View
B Bottom View
A-A
Top View
Front View
Back View
A B
p4
TO BE OPP-HAND OF LC1
Bottom View
LC2 ( p106 )
p10
p10
Back View
Material list for 1 LANGLAAGTE CHUTE assembly marked LC2 - only 1 assembly is required 4 04 Issued for Approval 2018-04-23
Mark No Profile Length Grade Paint area Mass 3 03 Issued for approval 2018-04-20
p4 1 PLT8*506.8 3763 S355JR 2.8 119.8 Rev Mark Revision Description Date
p5 1 PLT8*774.3 4029 S355JR 3.8 195.9 Drawn FDT
p7 1 PLT8*660 1523 S355JR 1.5 63.3
KENMORE CRUSHING SOLUTIONS Scale 1:10
p8 1 FL8*70 883 S355JR 0.1 3.8 ASNKO PLANT PHASE II Issued 19.04.2018
Tekla structures
Total for 1 assembly 9.2 409.7 1 'LANGLAAGTE CHUTE' required marked LC2 Tel: 011 768 7508 Fax: 086 600 7508 vdcc@vodamail.co.za A [LC.2] 4
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 1 All welds 6mm continuous fillet welds unless noted otherwise
Corrosion protection: As per Architect / Engineer
Ends of Column Shaft to be Machine Sawn True & Square
All profile notches to have 11mm radius
All steelwork to be hardstamped with the Job Number,
at position shown for correct site orientation
QUALITY CONTROL
1 470
20
1 490
Date :.......................................
30 30 30 30
30
2 ø 18.0 2 ø 18.0
Top View
230
230
44 16 64
Front View
90
90
p3
160
p3
Top View
1 510 (L60*60*6 x 1490) A-A
60 41 1 288 10 60
10 41
m122
A
NA1 ( m117 )
90
A
10 1 490 10
Front View
QUALITY CONTROL
10 10
100
Top View Top View
Top View
1 320 (L80*80*10 x 1300)
145
145
A B
NA2 ( m121 )
60
60
Front View
Front View
50
50
50
50
p83
p83
30
30
225
A-A B-B
A B
10 1 300 10
Front View
2 ø 24.0
206 RB1
53
153
206
100
2 ø 24.0
53
53
0
78 100 78
178
256
78
0
50*206 x 256
Front View
Material list for 6 parts named '60 SHORE RUBBER' Project Number
Mark Profile Grade Length Paint Area Mass AV1716
Supplied by P O Box 21473
RB1 50*206 RUBBER 256 0.2 0.0 Drawing Rev
VISION DRAUGHTING cc
Total for 6 parts 1536 0.9 0.0 Tel: 011 768 7508 Fax: 086 600 7508
Helderkruin 1733, South Africa
vdcc@vodamail.co.za W [RB.1] 4
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 2 All profile notches to have 11mm radius unless noted otherwise
PFC300*100 x 4616
Top View
SB1
Back View
Top View
Back View
A-A
PFC200*75 x 2650
Top View
SB2
Back View
Top View
Back View
A-A
QUALITY CONTROL
Top View
219
107
100
2x m275
167
p302
16 16
Front View
2 ø 40.0
158
1 250
3 245
1 205
3 200
4 466
p304 BS
RD 1 205 45 1 950 45 1 221
Top View
A-A
B
2 110 245 2 110
2 110
2 356
4 466
A A Top View
SB10 ( m265 )
55
98
49
16
35 35
70
8
Front View
55
16 A 16 A
16 16
4 386
B-B
40
2 268
4 426
4 466
110
B
2 198
4 356
RD
40 70 2 088 70 2 088 70 40
4 356 70 40
PC180*70 x 4466
Front View
PLT12*140 x 540
540
35
115
195
345
425
505
35 80 80 150 80 80 35
0
SP1 140
35
105
6 ø 18.0
140
70
35
35
0
6 ø 18.0
Front View
30
Name :........................................Clock No :........................
m272
2 ø 18.0 Start date :...............................
m269
6x m261 Complete Date :.......................
m260
Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
Released for welding by :...................................................
Date :.......................................
2 ø 18.0
p300
90
m271
m256
Top View
Top View 833 80 1 399
13
m271 m253
0
175
2x m268
517
200
m
25
6 1
m268 BS
08
6
Front View
200
m260
1 441
1 175
200
13
0
m260
20
746
200
m
25
5
200
m252
m257
m252
254
6x m261 NS
A-A
Material list for 1 STAIR STRINGER assembly marked ST9 - only 1 assembly is required
m258
12
Mark No Profile Length Grade Paint area Mass
m252 1 C178*54 1170 S355JR 0.6 17.0
m253 1 C178*54 967 S355JR 0.5 14.0
Front View
m255 1 C178*54 1827 S355JR 1.0 26.5
m256 1 C178*54 1827 S355JR 1.0 26.5 A
m257 1 C178*54 254 S355JR 0.1 3.7
m258 1 C178*54 254 S355JR 0.1 3.7 5 05 Issued for Approval 2018-04-26
m260 1 L50*50*6 852 S355JR 0.2 3.8 4 04 Issued for Approval 2018-04-23
m261 6 PLT750*60 245 COMPONENT 2.9 0.0 Rev Mark Revision Description Date
m268 2 L90*65*6 1257 S355JR 0.8 17.8 Drawn FDT
m269 1 C178*54 840 S355JR 0.5 12.2
KENMORE CRUSHING SOLUTIONS Scale 1:10
m270 1 C178*54 80 S355JR 0.0 1.2 ASNKO PLANT PHASE II Issued 26.04.2018
OXIDE LOADING STATION Revised 2018-04-26
Tekla structures
Top View
Front View
40
2 ø 18.0
p1
1 051
m24
35 60 298
p1
A-A
Top View
m1
40
2 ø 18.0
Front View
125
m26
30
956 60 35
Top View
2 320
B-B
2 200 80 40
2 240
80 360 1 720 80
A B
TB1 ( m30 )
40 35
2 ø 18.0
75
2 ø 18.0
A B
Front View
QUALITY CONTROL
RD
65 1 360 65 Name :........................................Clock No :........................
Start date :...............................
1 425
1 490
65
Complete Date :.......................
1 712 1 712 Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
Released for welding by :...................................................
505
41 1 384 55 10
Date :.......................................
1 207
m3
7
Top View
1 614
2 ø 18.0
40
m17
1 207
Front View
345 60
B-B
98
54
RD
98
Top View
1 690
1 525
A B
TB2 ( m31 )
178
45
m52
A B
Front View
Top View
2 ø 18.0
40
Front View
m9
60 345
A-A
QUALITY CONTROL
RD
65 1 360 65 Name :........................................Clock No :........................
Start date :...............................
1 425
1 490
65
Complete Date :.......................
1 379 1 379
Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
Released for welding by :...................................................
Date :.......................................
505
Top View
874
m3
6
2 ø 18.0
Front View
40
1 277
m10
60 345
A-A
Top View
874
2 ø 18.0
40
Front View
m18
345 60
102
B-B
102
RD
6
6
Top View
1 690
1 525
A B
TB3 ( m31 )
178
45
m52
A B
Front View
19
2 851 2 851 Name :........................................Clock No :........................
A B
Start date :...............................
130
m31 TB4 ( m31 ) Complete Date :.......................
Checked by Supervisor :....................................................
452
512
178
4 ø 18.0 4 ø 18.0 Checked by Inspector :.......................................................
45
Released for welding by :...................................................
2 399 m52 m225 m225 Date :.......................................
2 340 A B
1 290
m
33
100 1 490 100
384
m225
Front View
40
40
Top View
2 015
60
60
60
1 955 RD
54 60 2 737
40
40
4 ø 18.0
2 851
114
54
m225
4 ø 18.0
1 201
130
35 60 35
707
Front View
40
m11
2 ø 18.0
90
50
2 ø 18.0
75
40
m6
1 249
60 1 553
1 139
A-A
Top View
RD 2 737 60 54
2 737
2 797
2 851
1 249
1 040
35 60 35
40
m11
25 15
Front View
2 ø 18.0
50
2 ø 18.0
m14
50
4
m3
1 553 60
99
54
RD RD
6 99
2 751 60 40
6 0
2 851
1 415 26 29
Material list for 1 Tie assembly marked TB4 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass 5 05 Issued for Approval 2018-04-26
m6 1 L90*65*6 2851 S355JR 0.9 20.2 4 04 Issued for Approval 2018-04-23
m11 2 L90*65*6 130 S355JR 0.1 1.8 Rev Mark Revision Description Date
m14 1 L90*65*6 2851 S355JR 0.9 20.2 Drawn FDT
m31 2 L50*50*6 1490 S355JR 0.6 13.3
KENMORE CRUSHING SOLUTIONS Scale 1:10
m33 1 L50*50*6 1807 S355JR 0.4 8.1 ASNKO PLANT PHASE II Issued 26.04.2018
OXIDE LOADING STATION Revised 2018-04-26
Tekla structures
QUALITY CONTROL
1 690
Name :........................................Clock No :........................
165 Start date :...............................
65 35 30 1 110 30 35 65
Complete Date :.......................
60 60
20 Checked by Supervisor :....................................................
A B
Checked by Inspector :.......................................................
2 060 TB5 ( m31 ) Released for welding by :...................................................
Date :.......................................
178
130
45
4 ø 18.0
4 ø 18.0
453
m52 m225 m225
A B
1 290
1 608
60
1 548 100 1 490 100
Front View
m
38
324
m225
40
Top View
1 223
60
60
1 163 RD
69 60 1 931
40
2 060
129
69
4 ø 18.0
m225 4 ø 18.0 130
35 60 35
Front View
45
m12
2 ø 18.0
90
1 070
45
45
2 ø 18.0
75
45
m8
60 353
A-A
Top View
93 RD 1 931 60 69
1 931
1 991
2 060
6 93
6 0
1 360 55 35 60 35
Top View
Front View
45
m12
2 ø 18.0
90
45
45
75
2 ø 18.0
45
m16
353 60
B-B
Material list for 1 Tie assembly marked TB5 - only 1 assembly is required 5 05 Issued for Approval 2018-04-26
Mark No Profile Length Grade Paint area Mass 4 04 Issued for Approval 2018-04-23
m8 1 L90*65*6 2060 S355JR 0.6 14.6 Rev Mark Revision Description Date
m12 2 L90*65*6 130 S355JR 0.1 1.8 Drawn FDT
m16 1 L90*65*6 2060 S355JR 0.6 14.6
KENMORE CRUSHING SOLUTIONS Scale 1:10
m31 1 L50*50*6 1490 S355JR 0.3 6.7 ASNKO PLANT PHASE II Issued 26.04.2018
OXIDE LOADING STATION Revised 2018-04-26
Tekla structures
50 40
3 247 3 247 QUALITY CONTROL
2 ø 18.0
Name :........................................Clock No :........................
3 147
40
452
Start date :...............................
22 1 235 30 35
512
Complete Date :.......................
60
60
m31 2 795
452
Checked by Supervisor :....................................................
2 735
Checked by Inspector :.......................................................
736
m Released for welding by :...................................................
32
75 Date :.......................................
324
4 ø 18.0 90
40
2 411 2 411
60
60
60
2 351 2 351
40
140
4 ø 18.0
m225
m225
1 326
1 374
989
Top View
A 1 469
47
TB6 ( m31 ) 1 422
3 247
1 362
3 147
2 351
A
1 266
1 422
1 428
32
m
96
m52
RD
96
m5
1 415 22 33
QUALITY CONTROL
1 490
RD
65 1 360 65
1 425
1 490
65
1 690
2 455 2 455
1 525
452
50
2 003 A B
TB7 ( m31 )
60
1 944 m31
178
m3
29 5
45
324
m225 30 60 35
m52
m225 4 ø 18.0 m225
1 619 A m225 1 290 B
60
1 559
4 ø 18.0
100 1 490 100
481
35 60 30 Front View
2 355
1 079
1 026
53
60
966
2 ø 18.0 Top View
40
Front View
m7
966 140
60 352 978
5
A-A 140
m3 Top View
2 ø 18.0
101
RD RD
101
6 0
6
40
Front View
m15
90
55 1 389 26 1 330 60
Top View
B-B
QUALITY CONTROL
5 L50*50*6 x 1500 5
RD
70 80 1 200 80 70
150
80
1 350
1 280
1 200
A B
Top View
p28
40
40
2 ø 18.0
160
80
p1 2 ø 18.0
48
40
m22
40
TB8 ( m30 ) 60 319
150
p1
A-A
Top View
10
p28
40
2 ø 18.0
40
35 35 2 ø 18.0
160
80
40
48
10
m27
40
469 60
A B
B-B
40 40 40 40
80
80
Top View
QUALITY CONTROL
Top View
RD
35 746
841
p1 60
35
95
150
140
35 60 45
Front View
p1
10
40
m3
2 ø 18.0
90
160
50
50
2 ø 18.0
48
m23
60 269
A-A
35 1 360 35 Top View
RD 746 60
746
Top View 35
806
1 510 (L50*50*6 x 1500)
841
1 430
140
80 80
Front View
40 40 40 40 45 60 35
10
40
m4
2 ø 18.0
B
90
2 ø 18.0
A 160
50
50
40
2 ø 18.0
48
TB9 ( m30 )
40
m25
p28
419 60
80
p28
40
40
A B B-B
2 ø 18.0
Front View
Material list for 1 Tie assembly marked TB9 - only 1 assembly is required 4 04 Issued for Approval 2018-04-23
Mark No Profile Length Grade Paint area Mass 3 03 Issued for approval 2018-04-20
m3 1 L90*65*6 140 S355JR 0.0 1.0 Rev Mark Revision Description Date
m4 1 L90*65*6 140 S355JR 0.0 1.0 Drawn FDT
m23 1 L70*70*6 841 S355JR 0.2 5.4
KENMORE CRUSHING SOLUTIONS Scale 1:10
m25 1 L70*70*6 841 S355JR 0.2 5.4 ASNKO PLANT PHASE II Issued 16.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
Front View
m90
70
m94
m90
p40 p40
60
15
m95
60
A-A
TF2 ( m94 )
Bottom View
B m90
B
m90
40
60
TAIL FRAME
30
9
m94
m90
50 22 50
70
122
80
70
30
9
1 ø 18.0 m94
1 ø 26.0
B-B 1 210 15
COURSE THREAD
QUALITY CONTROL
100 100 1 360
Name :........................................Clock No :........................
Start date :...............................
160 1 450 160
Complete Date :.......................
m83 15 145 145 15 Checked by Supervisor :....................................................
m126 Checked by Inspector :.......................................................
A m126 Released for welding by :...................................................
m83
Date :.......................................
m127
m127
634
m60
56
955
1 260
40 1 450 40
B 61 2 ø 18.0
2 ø 18.0
m28
TF3 ( m64 )
Front View
60
m59
m28
215
m28
B 35 765 765 35
m125
m125
TF3 ( m64 )
742
m63
710
m62
m58
211
217
m119 m53
6
A
140 1 460 50
Front View
A-A
56 1 260 61
1 ø 18.0 1 ø 18.0
40
m61
40
m28
1 ø 18.0 1 ø 18.0
Material list for 1 TIE FRAME assembly marked TF3 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass
m28 4 L70*70*6 70 S355JR 0.1 1.8
m53 2 C178*54 1650 S355JR 1.8 47.8 m28
m58 1 PC200*75 1691 S355JR 0.9 41.1
m59 1 PC200*75 1377 S355JR 0.7 33.5 2 ø 18.0
m28
m60 1 PC200*75 1691 S355JR 0.9 41.1
m61 1 PC200*75 1377 S355JR 0.7 33.5
m62 1 PC200*75 704 S355JR 0.4 17.1 m59
4 04 Issued for Approval 2018-04-23
m63 1 PC200*75 704 S355JR 0.4 17.1 3 03 Issued for approval 2018-04-20
m64 1 PC200*75 1600 S355JR 0.8 38.9 Rev Mark Revision Description Date
2 ø 18.0
m83 1 IPE200 1450 S355JR 1.1 32.5 Drawn FDT
m118 4 L60*60*6 170 S355JR 0.2 3.7
KENMORE CRUSHING SOLUTIONS Scale 1:15
m119 4 L60*60*6 170 S355JR 0.2 3.7 ASNKO PLANT PHASE II Issued 19.04.2018
OXIDE LOADING STATION Revised 2018-04-23
Tekla structures
QUALITY CONTROL
25
Checked by Inspector :.......................................................
D B
Released for welding by :...................................................
35
35
75
Date :.......................................
p278
500
Top View
g5 g6 g7 650
75
35
60
Back View
125
35
D B
25
A C
22 56 22 22 56 22
50 50
100 100 Bottom View
A-A
3 050
Top View
22
78
3 028
275 100 275
150
2 008
2 972
RD
992
22 72 842 1 017 964 56
56 22 2 ø 18.0
L125*75*8 x 3050
m167
Top View
125
Back View
3 006
65
m201 m201
2 ø 18.0
2 ø 18.0
35 650 35
Bottom View
C-C
2x p278
2 ø 18.0
2 ø 18.0 2 ø 18.0
m201 m201
Bottom View
150 2 900
3 050
150
100 100
2 ø 18.0
35
WF3 ( m166 )
65
60
m165 2 ø 18.0
1 575
2 800
2 ø 18.0 2 ø 18.0
350
1 475
2 700
3 050
250
Back View
Top View Top View
Back View
Back View
6
Material list for 1 WALKWAY FRAME assembly marked WF3 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass 5 05 Issued for Approval 2018-04-26
g5 1 OG25*610 1014 RS40 25*4.5 1.3 0.0 4 04 Issued for Approval 2018-04-23
g6 1 OG25*610 1012 RS40 25*4.5 1.3 0.0 Rev Mark Revision Description Date
g7 1 OG25*610 994 RS40 25*4.5 1.3 0.0 Drawn FDT
m165 1 L125*75*8 3050 S355JR 1.2 37.2
KENMORE CRUSHING SOLUTIONS Scale 1:10
m166 1 L125*75*8 3050 S355JR 1.2 37.2 ASNKO PLANT PHASE II Issued 26.04.2018
Tekla structures
Total for 1 assembly 6.9 88.0 1 'WALKWAY FRAME' required marked WF3 Tel: 011 768 7508 Fax: 086 600 7508 vdcc@vodamail.co.za A [WF.3] 5
Phase Qty General Notes: All steelwork to comply with SANS 2001:CS1 & SANS 1921-3
Phase 1 1 All welds 6mm continuous fillet welds unless noted otherwise
Corrosion protection: As per Architect / Engineer
Ends of Column Shaft to be Machine Sawn True & Square
m276 All profile notches to have 11mm radius
1 ø 14.0 All steelwork to be hardstamped with the Job Number,
at position shown for correct site orientation
QUALITY CONTROL
710
Checked by Supervisor :....................................................
Checked by Inspector :.......................................................
Released for welding by :...................................................
Date :.......................................
10
60
684
98
2 629
5 160
7 691
1
2 530
5 061
7 592
9 431
RD
98
1 2 432 99 2 432 99 2 432 99 1 740
564
8 9 431 735
684
Back View
744
10 175 (L125*75*8 x 9431)
g8
Top View 120
m237
m237
40 80
40 2x p288 50
RD
50
m239 m240
2 ø 18.0 2 ø 18.0
g11 5x g12 g10 g9
30 30 750 30 30
7x p288
2x p288
R-R
600
Top View
p289
60
130
50
Back View
50 60 50 50 50 50 50 50 50
50 60 750 60
9 431
1 024
2 219
3 414
4 609
5 804
6 999
8 199
9 372
Bottom View
RD 1 024 1 195 1 195 1 195 1 195 1 195 1 200 1 172 60
A-A
Bottom View
30 750 30 m236
RD
744
734
22 56 22
10
Back View
100
RD
10
98 2 432 99 2 432 99 2 432 99 1 730 725
2 530
2 629
5 061
5 160
7 592
7 691
9 422
98
10 2 ø 18.0
8 100
100
65
B 2 ø 18.0 B-B
20
A 2 ø 18.0
115
2 ø 18.0
16
2 ø 18.0
B
60
R
50
30
7
65
m241
WF4 ( m238 ) 2 ø 18.0
2 ø 18.0 2 ø 18.0
2 ø 18.0
A R
100 40
1 563
40 80
1 533
1 593
2 056
3 528
4 939
6 350
7 761
9 172
267
547
100
1 956
3 428
4 839
6 250
7 661
9 072
9 431
377
447
447 100 986 30 364 100 1 371 100 1 311 100 1 311 100 1 311 100 1 311 100 260
744
30
Material list for 1 WALKWAY FRAME assembly marked WF4 - only 1 assembly is required
Mark No Profile Length Grade Paint area Mass
g8 1 OG25*710 732 RS40 25*4.5 1.1 0.0
g9 1 OG25*710 1200 RS40 25*4.5 1.8 0.0
g10 1 OG25*710 1195 RS40 25*4.5 1.8 0.0
Back View
g11 1 OG25*710 1045 RS40 25*4.5 1.6 0.0
g12 5 OG25*710 1190 RS40 25*4.5 8.9 0.0
m236 8 L60*60*6 100 S355JR 0.2 4.3 5 05 Issued for Approval 2018-04-26
m237 2 L60*60*6 160 S355JR 0.1 1.7 4 04 Issued for Approval 2018-04-23
m238 1 L125*75*8 9431 S355JR 3.7 115.1 Rev Mark Revision Description Date
m239 1 L125*75*8 9431 S355JR 3.7 115.1 Drawn FDT
m240 1 L125*75*8 744 S355JR 0.3 9.1
KENMORE CRUSHING SOLUTIONS Scale 1:10
m241 1 L125*75*8 744 S355JR 0.3 9.1 ASNKO PLANT PHASE II Issued 26.04.2018
Tekla structures
Total for 1 assembly 24.5 276.3 1 'WALKWAY FRAME' required marked WF4 Tel: 011 768 7508 Fax: 086 600 7508 vdcc@vodamail.co.za A [WF.4] 5