Sei sulla pagina 1di 2

AIR HANDLING UNIT (AHU)/

AIR CONDITIONING & COOLING


UNIT (ACCU)

ITR No H03B
Item/Tag No. @T System No. @S
Item/Tag Description @D Sub System No. @SS
Sub System Description @SSD
Location @L Print Date @PD

INFORMATION
Lay Out Drawing

No. Items to be Checked OK N/A Punch List no.

Check that unit is airtight with no air leaks through joints


1
and access doors.
2 Confirm operation of local start stop control station.
Complete tests of internal items of equipment as
appropriate.
Air Filters
3
Fan shut off Dampers
Fan
Electric Heaters
4 Check Filter / Coalescer Unit.
5 Check Cooling Coil (water).
6 Check Heating coil (electricity).
7 Check name plate and ensure information is correct.
Check flexible duct connectors are installed correctly and
8
as per specification.
Check mixing box and return fresh air damper
9
installation.
Verify that electrical check on motors, cabling and motor
10
control center are completed.
COMMENT(S) / ADDITIONAL INFORMATION:
COMPLETED BY CONTRACTOR VERIFIED BY PMT/OWNER
Designation
Company
Name
Signature
Date

Potrebbero piacerti anche