UNIT I

1. (a) Discuss the role of quantity Surveying in construction industry. (10)

(b) Briefly explain the basic measurement rules in the construction of a


community hall. (10)

Or

2. (a) Explain briefly the role of measurement in estimation and payment. (10)

(b) State the steps to be followed in measurement of an agricultural land of


200 acres. (10)

UNIT II

3. Discuss the unit of works and general rules followed while carrying out the
measurement of academic building. (20)

Or

4. Briefly describe about modem dismantling and demolishing methods. (20)

UNIT III

5. Estimate the quantity of materials for the following works

(a) Water bound macadam road. (10)

(b) Laying of railway track for a length of 50 kM. (10)

Or
wk 9

6. Estimate the quantity of materials for the following works


(a) Foundation concrete 1:5:10 using 40 mm stone jelly for 1m3. (10)
(b) Brickwork in C.M 1 : 5 using first class bricks for 10 m3. (10)

UNIT IV

7. Explain briefly the systems of plumbing with neat sketches. (20)

Or

8. Explain briefly about different types of fire extinguisher and explain any two
with neat sketches. (20)

UNIT V

9. Describe briefly the role of AUTOCAD and architectural CAD in building


construction. (20)

Or

10. Write short notes on the following commands : (5 × 4 = 20)


(a) Mirror
(b) Chamfer
(c) Polygon
(d) Hatching
(e) Trim.

——————