5 Clock IN
8 EHS Inspection
14 Clock OUT
Page 3
Preconditions/dependencies for sharing Task in ISDP Mobile: All in One Delivery
• Once Activity Owner mapping to be done under Project Member Role Configuration, Rights for activity
visibility , Workload access mapping ( in case where workload is applicable) must be set under Project
Activity Library.
• Activity Owner Mapping to be done in Rollout Plan for the Task that needs to be shared and must be
• Needless to mention, Activity owner must have data access activated in his Mobile.
Page 4
Topics: All in One Delivery
5 Clock IN
8 EHS Inspection
Page 7
ISDP Home Menu and Project Selection: All in One Delivery
Step 3
Step 4
Page 8
Topics: All in One Delivery
5 Clock IN
8 EHS Inspection
Page 10
Topics: All in One Delivery
5 Clock IN
8 EHS Inspection
Step 1
Page 12
Site Visit Preparation: All in One Delivery
Page 13
Site Visit Preparation: All in One Delivery
Step 5
Step 6
Page 14
Topics: All in One Delivery
5 Clock IN
8 EHS Inspection
Step 1
Page 16
Clock IN using ISDP APP on your Mobile:
All in One Delivery
p5 Page 17
Clock IN using ISDP APP on your Mobile:
All in One Delivery
Step 5
Step 5: Click on
the Clock Option.
Step 6
Step 6 : Next click
on the Clock
Page 18
Clock IN check ISDP PC:
All in One Delivery
Step 8: Click on
the Clock
Report Option
Step 8
under the
Project
Resource
Report option
from the Main
Menu option of
Report.
Page 19
Clock IN check ISDP PC:
All in One Delivery
Step 8: Click on
the Clock Detail
Report Option
which will then
display all the
Clock IN done for
Step 9 the day for the
various sites along
with Time details
and distance from
site.
Note: Statics Date
needs to be for
the Day to be
checked.
Page 20
Topics: All in One Delivery
5 Clock IN
8 EHS Inspection
Step 1
Page 22
Starting Work Order or Task Assigned:
All in One Delivery
Step 3: Site
Progress can be
captured daily by
using the Camera
option. Album
Step 3
Option can be
used to upload
Step 4
photos taken
earlier in the day.
Step 4: Remarks
must be added to
report on the
days progress.
Page 23
Create QC Task:
All in One Delivery
Step 1: Click
on the QC/QA
Menu Option
Step 2
from the Main
Menu.
Step 3
Step 2: Type
in the site ID in
which a new
QC Task needs
Step 1
to be Created.
Step 3: Click
on the DU ID
in which the
QC Task needs
to be created.
Page 24
Create QC Task:
All in One Delivery
Step 4: Select
Step 4 the Business
Type.
Step 5
Step 5: Select
the Template
to be used for
the QC task
reporting.
Page 25
Topics: All in One Delivery
5 Clock IN
8 EHS Inspection
Page 27
Topics: All in One Delivery
5 Clock IN
8 EHS Inspection
Page 29 plate.
EHS Inspection using ISDP Mobile:
All in One Delivery
Page 30
EHS Inspection using ISDP Mobile:
All in One Delivery
Step 7
Step 6: EHS Checklist- Take
Photo of the filled in EHS
checklist.
Step 7: Click on the save and
Step 6
submit option to upload the
photos.
Page 31
EHS Inspection using ISDP Mobile:
All in One Delivery
Step 9
Step 8: EHS Risk Assessment- Take
Photo of the filled in EHS Risk
Assessment sheet..
Step 9: Click on the save and
Step 8 submit option to upload the
photos.
Page 32
EHS Inspection using ISDP Mobile:
All in One Delivery
Page 33
EHS Inspection using ISDP Mobile:
All in One Delivery
Page 34
EHS Inspection using ISDP Mobile:
All in One Delivery
Page 35
EHS Inspection – Check Using ISDP PC:
All in One Delivery
Page 36
EHS Inspection – Check Using ISDP PC:
All in One Delivery
Page 37
EHS Inspection – Check Using ISDP PC:
All in One Delivery
Page 38
Topics: All in One Delivery
5 Clock IN
8 EHS Inspection
• Once a QC Task is chosen then the KCP’s are displayed as per what was defined in the QC
Step 1 Plan.
• The Photographs or the other output requirements as mentioned against each KCP then needs
to be generated.
Page 40
Quality Reporting from site using ISDP Mobile : All in One Delivery
Step 2
Page 41
Quality Reporting from site using ISDP Mobile :
All in One Delivery
Page 42
Quality Reporting from site using ISDP Mobile : All in One Delivery
• ISDP also presents the option of uploading sample photographs for a KCP when a
KCP is defined by the Project QA team.
• This benefits the Task owner to help understand the expected content of the photo to
be taken.
• In case any Item is not applicable then the same ca be mentioned as NA.
Page 43
Quality Reporting from site using ISDP Mobile :
All in One Delivery
• Once all the Photographs and other details are taken as per the KCP, then the
same needs to be Saved.
• On completion of all the KCP’s , the information so collected can be uploaded
on to the ISDP server using the Submit option.
Step 4
Page 44
Quality Reporting from site using ISDP Mobile : All in One Delivery
• Once the uploaded docs are checked by the approver and approved then the Task
owner will get the Pass notification against that Task with time details.
Page 45
Quality Reporting from site using ISDP Mobile :
All in One Delivery
• KCP Standards and Guidelines can be defined at the time of defining the Item in the
Quality Plan.
• By clicking on the Red Exclamation option , user can study the Standards for the Item
to help understand and initiate the needful action.
Page 46
Quality Reporting from site using ISDP Mobile :
All in One Delivery
Page 47
Quality Reporting from site using ISDP Mobile :
All in One Delivery
Page 48
Quality Reporting from site using ISDP Mobile :
All in One Delivery
• Once the required details are retaken for the rejected KCP….then the same can be
resubmitted.
• Once the revised inputs are submitted the exclamation mark against that particular
item will no longer exist.
Page 49
Quality Reporting from site using ISDP Mobile :
All in One Delivery
• A copy of an Item can be created by the ISDP mobile user by scrolling the Item Task
bar to the left.
• This will create another copy of the same Item. The mobile user can edit the Item name
to give unique identity to the additional Item.
Page 50
Topics: All in One Delivery
14 Clock OUT
Page 51
ISDP QC Access:
All in One Delivery
The Quality
Check/Assurance and
Acceptance are
grouped under the
Menu option of ISDP
Smart QC & ISDP
Acceptance under sub
menu option of Rollout
Management under
Plan and Rollout Menu
option.
Step 1
Detailed
table
about
clock
operation
and photo
Page 52
ISDP QC – Task View:
All in One Delivery
QC Acceptance tasks
are categorized in this
menu option like Closed,
Rejected, To be
Step 2 Reviewed etc..
Step 3
Detailed
table
about
clock
operation
and photo
Page 53
ISDP – Quality Check Using PC:
All in One Delivery
• Once the QC
activity is dispatched to
the owner , the owner
can see the Task
Step 4 against the particular
DU using the ISDP
mobile.
• Post completion of
the Quality Check Task
at site as per the Item
KCP’s that were
defined, the Task will
then reflect under the
Quality Check menu
Step 5
option for review and
approval.
Detailed
table
about
clock
operation
and photo
Page 54
ISDP – Quality Check Using PC:
All in One Delivery
• The QC approver
can check the QC
details as
submitted for the
particular DU and
then can
accordingly either
approve or reject
the details shared.
• If the details shared
is rejected the
notification will then
be send to the
Step 6
activity owner and
will figure again as
a Task with specific
Detailed remark as to what
table needs to be
about corrected.
clock
operation
and photo
Page 55
Topics: All in One Delivery
14 Clock OUT
Page 56
ISDP Mobile for Issue Feedback: All in One Delivery
Step 1
Step 2
• Step 2: Click on the Task to access the Task.
Page 57
ISDP Mobile for Issue Feedback: All in One Delivery
Step 4
Step 3
Page 58
ISDP Mobile for Issue Feedback: All in One Delivery
Page 59
ISDP Mobile for Issue Feedback: All in One Delivery
Step 7
Issue that are Initiated by the User can be seen
under “My Issues” Tab option from Main
Menu.
Page 60
ISDP Mobile for Issue Feedback: All in One Delivery
• Also from the “My Issues” Tab….tasks rejected by the approver will reflect.
• These are the tasks that were performed by the Task owner.
• Also any other site issue reported where the Issue Owner is mapped for the
ISDP Handset user will reflect in this menu option.
Page 61
Issue Feedback and Closure using ISDP PC: All in One Delivery
• Using ISDP PC
Issue status
needs to be
updated.
• This is done
by logging to
Issue
Management
from the
Project
Management
menu option.
Page 62
Issue Feedback and Closure using ISDP PC: All in One Delivery
• Issue status
updates must
be shared
regularly by
the issue
owner using
the Follow Up
option.
• This can be
accessed by
clicking on the
issue from the
previous
menu option.
Page 63
Issue Feedback and Closure using ISDP PC: All in One Delivery
Page 64
Topics: All in One Delivery
14 Clock OUT
Page 65
Closure of Work Order or Task:
All in One Delivery
Step 1
Page 66
Closure of Work Order or Task:
All in One Delivery
Step 4
Page 67
Topics: All in One Delivery
14 Clock OUT
Page 68
Offline Mode Operation of ISDP Mobile:
All in One Delivery
Page 69
Topics: All in One Delivery
14 Clock OUT
Page 70
Clock OUT Using ISDP Mobile:
All in One Delivery
Page 71
Clock OUT Check Using ISDP PC:
All in One Delivery
Page 72
Clock OUT Check Using ISDP PC:
All in One Delivery
Page 73
All in One Delivery
Thank you
Abhijit Ghosh
a00390760