11NURSE CALL & MEJA NURSE STATION
1Mater Call Station UNIT 2 12,500.000 25,000,000.000 425,000.000
2Power Supply UNIT 2 2,100,000.000 4,200,000.000 250,000.000
3Hand Help Call button bh 46 45,000.000 20,700,000.000 50,000.000
4Call reset Button bh 46 192,000.000 8,832,000.000 5,000.000
5Indicator Light ? Corridor Lamp bh 46 450,000.000 20,700,000.000 25,000.000
6Shower pull cord bh 46 375,000.000 17,250,000.000 25,000.000
instalasi pengkabelan dengan kabel UTP cable 4 Pair
7 titik
cat 5 E dalam condult PVC HI dia. 20 mm 134 145,000.000 19,396,857.000 5,000.000
8 meja penerima ( Nurse Station ) m2 14 250,000.000 3,375,000.000 50,000.000
JUMLAH PEKERJAAN NURSE CALL & MEJA NURSE SATTION 119,453,857.000
B PEKERJAAN CCTV
1 server CCTV unit 1 45,000,000.000 45,000,000.000 2,451,719.000
2 LCD TV 42'' unit 1 5,500,000.000 5,500,000.000 250,000.000
3 Indoor Fixed dome IP camera unit 10 1,550,000.000 15,500,000.000 830,388.000
JUMLAH PEKERJAAN CCTV 66,000,000.000
D PEKERJAAN MATV
1 Multi Cash server for MATV unit 1 14,000,000.000 14,000,000.000 1,168,750.000
2 Multi Cash Switch unit 1 7,500,000.000 7,500,000.000 908,055.000
3 IP TV + IP TV Headend ( setup box ) unit 48 750,000.000 36,000,000.000 150,000.000
JUMLAH PEKERJAAN MATV 57,500,000.000
JUMLAH PEKERJAAN INTEGRASI 296,012,000.000
13 PEKERJAAN PLUMPING
A INSTALASI PIPA UTAMA DAN KATUP
instalasi pipa air bersih ( header ) dengan Galvanized Hedium
1
Class ( GHC ) termasuk gantungan/hanger, support, fitting, aksesoris
dia. 200mm m 6 425,591.000 2,553,543.000 124,703.000
instalasi pipa utama air bersih ( riser ) dengan PPR80 - PN10 termasuk
2
gantungan/hanger, support,fitiing dan aksesoris
dia. 4" m 24 226,940.000 5,446,560.000 15,000.000
dia. 3" m 36 158,100.000 5,691,600.000 15,000.000
3 Gate Valve class 10K
dia. 4" bh 2 5,367,000.000 10,734,000.000 12,000.000
dia. 3" bh 2 3,014,000.000 6,028,000.000 12,000.000
4 Floater Valve
dia. 4" bh 2 1,750,000.000 3,500,000.000 12,000.000
dia. 3" bh 2 1,250,000.000 2,500,000.000 12,000.000
5 check valve 12K
dia. 4" bh 3 4,931,000.000 14,793,000.000 12,000.000
dia. 3" bh 2 3,370,500.000 6,741,000.000 12,000.000
6 foot Valve
dia. 4" bh 2 1,638,000.000 3,276,000.000 12,000.000
dia. 3" bh 2 1,350,000.000 2,700,000.000 12,000.000
7 Stainer 10K
dia. 4" bh 2 3,656,000.000 7,312,000.000 12,000.000
dia. 3" bh 2 3,621,000.000 5,242,000.000 12,000.000
8 Flexible Conection 10K
dia. 4" bh 2 731,800.000 1,453,600.000 60,000.000
dia. 3" bh 2 566,000.000 1,132,000.000 60,000.000
9 Pressure Gauge Lengkap Gate Valve bh 2 350,000.000 700,000.000 15,000.000
10 interkoneksi air panas dan pompa set 1 1,500,000.000 1,500,000.000 25,000.000
11 WLC lengkap dengan perkabelan set 1 5,250,000.000 5,250,000.000 900,000.000
86,553,303.000
B PEKERJAAN SPRINKLER
1 instalasi sprinkler dengan pipa black sch 40 tms fitting dan aksesories
dia 100 m 8 370,250.000 2,962,000.000 25,000.000
dia 80 m 30 275,300.000 8,259,000.000 25,000.000
dia 65 m 28 205,633.000 5,757,724.000 25,000.000
dia 50 m 11 105,700.000 1,162,700.000 25,000.000
dia 40 m 16 82,800.000 1,324,800.000 11,725.000
dia 32 m 42 75,133.000 3,155,586.000 5,004.000
dia 25 m 412 65,133.000 26,834,796.000 987.000
2 instalasi pipa test drain blackb steel sch 40 tms fitting dan aksesoris
dia 50 m 104 67,716.000 7,042,464.000 25,000.000
gate valve dia 50 bh 4 2,604,700.000 10,418,800.000 12,000.000
branch valve / butterfly valve with supervisory switch dia 100m bh 1 6,500,000.000 6,500,000.000 425,000.000
sight glass dia 50 bh 2 450,000.000 900,000.000 255,000.000
flow switch dia 100 bh 1 550,000.000 550,000.000 240,000.000
pressuew gauge + gate valve 25mm bh 1 950,000.000 950,000.000 2,500.000
head splinker type pendant bh 132 250,000.000 33,000,000.000 2,500.000
JUMLAH PEKERJAAN SPRINKLER 108,817,870.000
JUMLAH PEKERJAAN HYDRAN & SPRINKLER 137,317,870.000
19 PEKERJAAN LIFT
1 pengadaan eskalator dan perlengkapannya set 2 350,000,000.000 700,000,000.000 15,000,000.000
2 asesoris, arsitektur, interior & exterior lif LS 2 25,515,500.000 51,031,000.000 3,500,000.000
3 biaya perijinan dari DEPNAKER lot 1 3,500,000.000
4 lattering & sign LS 1 1,000,000.000 1,000,000.000 300,000.000
JUMLAH PEKERJAAN LIFT 752,031,000.000
JUMLAH TOTAL PEKERJAAN RUANG VIP LANTAI 3 2,422,421,069.000
D PEKERJAAN PLUMBING
1 INSTALASI AIR KOTOR
1 Instalasi air bersih cabang dan toilet
dia. 6'' m3 30 189.500 5,685,000.000 2.500
dia. 4'' m 3
70 140.000 9,800,000.000 2.500
dia. 3'' m 3
35 116.365 4,072,775.000 2.500
dia. 2'' m3 40 90.500 3,620,000.000 2.500
SUB JUMLAH PEKERJAAN INSTALASI AIR KOTOR 23,177,775.000
F PEKERJAAN SANITAIR
1 Pas Kitchen Sink 1 Lubang unit 1 350,000.000 350,000.000 15,000.000
2 Pas Floor Drain unit 1 275,000.000 275,000.000 50,000.000
3 Pas Kran Kitchen Sink unit 1 155,000.000 155,000.000 12,000.000
4 Pasang Meja Kitchen Sink beton finish m3 3 750,000.000 2,250,000.000 100,000.000
sub jumlah pekerjaan sanitair 3,030,000.000
3 SPRINKLER SYSTEM
Head Sprinkler bh 52 250,000.000 13,000,000.000 2,500.000 130,000.000
Fire Extingulsher type ABC kap. 3Kg bh 1 525,000.000 525,000.000 2,000.000 2,000.000
indoor hydran box bh 1 4,250,000.000 4,250,000.000 204,000.000 204,000.000
Pipa ∅25 m 200 65,133.000 13,026,600.000 15,000.000 3,000,000.000
Pipa ∅32 m 5 75,133.000 375,665.000 15,000.000 75,000.000
Pipa ∅50 m 107 105,700.000 11,309,900.000 15,000.000 1,605,000.000
Pipa ∅65 m 15 205,633.000 3,084,495.000 15,000.000 225,000.000
Pipa ∅80 m 24 275,200.000 6,604,800.000 25,000.000 600,000.000
Pipa ∅100 m 40,0 370,250.000 14,810,000.000 50,000.000 2,000,000.000
Pipa ∅150 m 41,5 640,250.000 26,570,375.000 50,000.000 2,075,000.000
93,556,835.000 9,916,000.000
2,384,112,113.000 242,310,708.000
Lantai 3 2,204,552,068 362,060,208
Lantai 2 358,235,045 33,625,500
Total Pekerjaan saya 395,532,333
Upah Harga Satuan Jumlah
265,194,143.000 3,324,945,388.000
selisih
2,891,616,964.000 2,861,062,344 30,554,620
433,328,424.000 184,212,385 249,116,039
3,324,945,388.000 3,045,274,729 279,670,659
383,376,143 2,614,733,343
31,443,000 423,303,045
414,669,518 3,037,749,479