Sei sulla pagina 1di 4

CURRICULUM VITAE

FLAT 3, BLOCK 191, ILASAN ESTATE, LEKKI,


LAGOS, NIGERIA.
Tel: 234-805-630-5566
E-mail: adebayosamson@yahoo.com

Personal Details

Name: Samson G. Adebayo

Profession: Mechanical Engineering

Position: Senior Mechanical/Piping Engineer

Date of Birth: 1977

Nationality: Nigerian

Languages: English

Academic Qualifications
Name of School/College/University Year Degree/Diploma
Ladoke Akintola University of Technology 2002 B.Tech Mechanical Engineering
University of Lagos, Lagos. M.Sc Mechanical Engineering
(In View)

Professional bodies membership:


Nigeria Society of Engineers (NSE)
American Society of Mechanical Engineer (ASME)
Council for the Regulation of Engineering in Nigeria (COREN)

Career Summary
Samson has Mechanical/Piping engineering experience in the following areas:
 Engineering Design using PDMS, Bentley Auto PLANT 2004, AutoCAD (R14, LT,
2000 & Higher Version), MICROSTATION and all Microsoft offices.
 Isometric Database Control and Management using MS Access.
 Generation of Catalogues and Specs.
 Pipe General Arrangement and Piping Studies.
 Generation of Isometrics and Bill of Materials.
 Plant Layout and Piping Design

Synopses of Experience in Oil & Gas Sector


Senior Mechanical/Rotating Engineer – International Energy Services Ltd Nov.
2011 to Date
Project Title: Domestic Supply Obligation (DSO) (EPIC)
Client: Chevron Nig. Ltd
 Preparation of Equipment RFQ
 Preparation of Equipment Datasheet
 Preparation of Equipment TBE
 Preparation of Equipment POS

Senior Piping Engineer – Atlas International Engineering Services August 2010 to


Oct. 2011
Project Title: TANK 3 WASH TANK CONVERSION (DED)
Client: Chevron Nig. Ltd
 Plot Plan
 General Piping Arrangement
 Pipe Support Details
 Preparation of Bill of Material
 Preparation of the Piping Isometric Drawings

Intermediate Piping Engineer – Atlas International Engineering Services August


2008 to 2010
Project Title: TANK 3 WASH TANK CONVERSION (DED)
Client: Chevron Nig. Ltd
 Plot Plan
 General Piping Arrangement
 Pipe Support Details
 Preparation of Bill of Material
 Preparation of the Piping Isometric Drawings

Project Title: ESCRAVOS TANKS 1, 2, 8 & 10 REPAIR and UPGRADE (FEED)


Client: Chevron Nig. Ltd
 Plot Plan
 Drafting and Development of Piping layout drawings
 Pipe Support Details
 Preparation of Bill of Material
 Preparation of the Piping Isometric Drawings

Project Title: MEREN WIP REVAMP STAGE 2 (DED)


Client: Chevron Nigeria Limited
 Design and Fabrication drawings development/analysis
 Drafting and Development of Piping layout drawings
 Pipe Support Details
 Plot Plan
 Preparation of Bill of Material
 Preparation of the Piping Isometric Drawings

Project Title: MEJI GAS GATHERING COMPRESSOR PLATFORM


Client: Chevron Nigeria Ltd
 Design and Fabrication drawings development/analysis
 Drafting and Development of Piping layout drawings
 Pipe Support Details

Piping Engineer – Terra Energy Services – July 2007 to July 2008


Project Title: DETAILED DESIGN OF ADANGA NORTH ‘B’ WELLHEAD PLATFORM
Client: Addax Petroleum Development (Nigeria) Ltd.
 Generation of MTOs for Piping and Valves
 Preparation of Datasheet for Special Equipments
 Preparation of the Piping General Arrangement
 Pipe Support Drawings

Project Title: CONCEPT VERIFICATION & DETAILED DESIGN OF H2S SCAVENGER


INJECTION SYSTEM FOR BONGA FPSO
Client: Shell Nigeria Engineering & Production Coy (SNEPCO)
 Piping & Pipeline Routing plan
 Initiate and maintain line list
 Plot Plan
 Preparation of Bill of Material
 Preparation of the Piping Isometric Drawings
 Generation of MTO

Project Title: DETAILED DESIGN OF ORON WEST-SOUTH WELLHEAD PLATFORM


Client: Addax Petroleum Development (Nigeria) Ltd.( July 2006 to May 2007)
 Production of Isometric for the different lines on the Jacket.
 Modelling of pipes using Bentley AutoPlant.
 Generating MTOs for different lines.
 Making reports for the cut length of pipes and reports for QA/QC on
the weld maps.

Project Title: TOPSIDE MODIFICATION OF MEREN 102, 77 MEFA 1, DELTA 4


JACKET
Client: Chevron Nigeria Ltd.( March 2006 to June 2006)
 Production of Isometric for the different lines on the Jacket.
 Modelling of pipes using Bentley AutoPlant.
 Generating MTOs for different lines.
 Making reports for the cut length of pipes and reports for QA/QC on
the weld maps.

Project Title: GIJ GAS COMPRESSION PLATFORM


Client: Addax Petroleum Development (Nigeria) Ltd.(July 2004 to May 2006)
 Development of Isometric Drawings for the modification to Existing
Piping Arrangement
 Development of P&ID for GIJ Suction Header Modifications
 Development of Bulk Materials Take Off

Other Experience:

CAD Operator – ZARTECH Ltd, Oluyole Estate, Ibadan - November 2034 to June
2004
 Design of Poultry houses.
 Editing of previously existing 2-D drawings.
 Analysis of Staff Welfare Packages.
 Conducting seminars on the use of AutoCAD.
 Assisting in the use of Spreadsheet.
Operations Officer – Maneffort Ltd., Ikorodu, Lagos – Sept. 2003 to Oct. 2003
 Responsibilities include: Preparing rentals for prospective clients.
 Overseeing the total operations of the company
 Maintenance of equipment on site.

NYSC – Abakaliki Local Government, Abakaliki – September 2002 to August 2003


 Servicing of local government area cars.
 Design of local government pipe layout.
 Servicing of D8K Engine

REFEREES on Request!

Potrebbero piacerti anche