APNRL/IMS/SOP/OP/055
STANDARD OPERATING Issue No. 01 Rev. No. 01
PROCEDURE
Adhunik Power & Natural Resources
Page 1 of 2
Ltd
PURPOSE:
To neutralize chemical laden water collected during DM plant operation.
SCOPE:
This document provides the Standard Operating Procedure details of
NEUTRALIZATION SYSTEM
OPERATION
START UP:
1. Open the valve of the air line for respective N-Pit whose water is to be
neutralized
2. Start the air blower
3. Check the pH of water in the N-Pit
4. If pH is in between 5.5 – 9, no need for neutralization as it is with in the
range of Central Pollution Control Board guidlines
5. If the pH is less than 5.5, than NaOH is to be added. If the pH is more than
9, than HCl is to be added
6. Accordingly fill the HCl/NaOH measuring tank & measure the initial level
7. Open the HCl/NaOH inlet valve at the inlet of N – Pit
8. Open the discharge valve of the HCl/NaOH measuring tank to 25%. The
HCl/NaOH will start dosing in the respective N-pit. The air blower is to be
continuously kept in service to ensure uniform mixing
9. Keep measuring the pH at every 10 mins interval
10. When the pH comes in the range of 5.5 – 9, close the discharge valve of
the HCl/NaOH tank
11. Note the final level of HCl/NaOH in the tank and calculate the
consumption
12. Close the HCl/NaOH inlet valve at the inlet of N – Pit
13. Stop the air blower
14. The water is neutralized within the guidelines of CPCB and can be used as
effluent for ETP
15. Start the N – Pit pumps and transfer the neutralized water to ETP
ALARM