Sei sulla pagina 1di 4

Production Title: Production Date(s):

Vibez radio

Team names:
Lewis Mulligan,​ Georgia Pearce​, Charlotte Skelhorn

Date of Risk Assessment: Risk Assessment conducted by:


05/02/2018

Location of Potential Person(s) who Property Risk Assessment LOW, Further action required to Person(s)
filming & Hazard may be harmed which may MODERATE, HIGH, control risk Responsible.
date. be damaged EXTREME

Franklin Cable leading Members of Microphone Moderate Be aware of the wire at all Ourselves and other
College - from the the team times and keep it out of the members of the
studio microphone way from where we are team
walking back forth from

Franklin ​Electric Shock ​ embers of


M ​ n electrical
A Low All electrical appliances must Franklin College
College the team equipment be pat tested Staff
Franklin Wheelie chair Members of Chair Moderate Sit carefully and don't lean Ourselves
college - the team back too much on it or swing
studio around

Franklin Objects falling Members of the Any studio Moderate Make sure no equipment at Ourselves and other
college - and moving team equipment a high level is balanced or members of the
studio unsecured team

Franklin Noise Members of Only High Sound crew should follow Ourselves and other
college - the team person(s) regulations in accordance members of the
studio would be with the ‘The control of team
damaged noise at work regulations
2005’

Franklin Equipment Members of the No recording Low Checking all equipment and Ourselves
College - failure team having a contingency plan.
studio

Potrebbero piacerti anche