Sei sulla pagina 1di 7

5/19/2018 Transformer Assembly, Installation & Commissioning

Sitemap
info@tyronpowerservices.com
+2348-053-900-000

Search...
Search

Menu

Home
Testing
Merger Test
Switchgear Testing
Power Transformer Testing
Neta Testing
Power Cable Testing
Circuit Breaker Testing
Protective Relay Testing
Generator Testing
Instrument Testing
Hi Pot Testing
Fall of Potential Ground Test
SF6 Circuit Breaker Testing
Ground Fault Testing
High Voltage Testing
Maintenance
Substation Maintenance Services
Transformer Maintenance
Switchgear Maintenance
Circuit Breaker Maintenance
SF6 Maintenance
Neta Maintenance
Other Services

http://www.tyronpowerservices.com/?p=2443 1/7
5/19/2018 Transformer Assembly, Installation & Commissioning

Power System Analysis


Arc Flash Analysis
Power Plant Services
Electrical Consultants
Electrical Repair
Circuit Breaker Repair
Automatic Transfer Switch
Installations
Transformer Rigging And Moving
Transformer Assembly, Installation & Commissioning
Process
Service Project Inquiry Form
Contact Us

Transformer Assembly, Installation &


Commissioning
You are here:

1. Home
2. Transformer Assembly, Installation & Commissioning

Our Experienced Team Has Installed Thousands of Transformers and Kept Them In
Service, Delivering The Reliable Power You Need

You’ve purchased a new transformer, but there’s SOME ASSEMBLY REQUIRED! TPS has the capability

and equipment to completely assemble and install your


http://www.tyronpowerservices.com/?p=2443 2/7
5/19/2018 Transformer Assembly, Installation & Commissioning

.
transformers We install transformer of all capacities ranging for 50KVA to 100MVA.TPS can also
disassemble units that may need to be moved.

We can start with receiving inspection at the rail siding, port of entry, substation site or wherever the
unit is located, and then assemble all parts that were removed for shipment to make the transformer
operational. If the unit was shipped oil-filled and it is necessary to lower the oil level to install
bushings or other parts, Waukesha® Service can get it done.

TPS oil tank trucks can be summoned to the site for oil storage or hauling, and we can bring in one of
our many oil-processing rigs. Using your specifications, the transformer supplier’s specifications or
ours, TPS can vacuum degasify and prepare new oil for installation, pull vacuum on the transformer
and professionally complete the vacuum oil-filling process.

A wide range of tests can also be performed to verify that your transformer is ready for service:

Omicron Power Factor Test of Windings


Omicron Power Factor Test of Bushings
Omicron Surge Arrester Test
Core Resistance (Megger)
TTR (Transformer Turns Ratio)
Winding Insulation Resistance
Winding Excitation
Winding Resistance
CT (Current Transformer) Ratio, Polarity and Saturation
Operational Check of Controls
Calibration of Gauges
Thermal Scans
Doble® Sweep Frequency Response Analysis
Phase Relation
Materials & Oil Testing:
Oil General Chemistry
DGA (Dissolved Gas Analysis)
Furfural Analysis
Particle Count
Metals-in-Oil Analysis
Degree of Polymerization

Your transformer is one of the most expensive and important components in your substation, and you
can be confident that the skilled TPS team will assemble and install it right.

http://www.tyronpowerservices.com/?p=2443 3/7
5/19/2018 Transformer Assembly, Installation & Commissioning

We handle any other sub station jobs that might be needed to ensure proper operation of your
transformer like

Extension of HV power 132KV/66KV/33KV/11KV (Underground and Overhead)


Reticulation of LV power ie connection to end users
Professional trunking, connection and termination of cables.

See more

1. Prev:Power System Analysis


2. Back: All Posts
3. Next:Transformer Rigging And Moving

Home
Testing
Merger Test
Switchgear Testing
Power Transformer Testing
Neta Testing
Power Cable Testing
Circuit Breaker Testing
Protective Relay Testing
Generator Testing
Instrument Testing
http://www.tyronpowerservices.com/?p=2443 4/7
5/19/2018 Transformer Assembly, Installation & Commissioning

Hi Pot Testing
Fall of Potential Ground Test
SF6 Circuit Breaker Testing
Ground Fault Testing
High Voltage Testing
Maintenance
Substation Maintenance Services
Transformer Maintenance
Switchgear Maintenance
Circuit Breaker Maintenance
SF6 Maintenance
Neta Maintenance
Other Services
Power System Analysis
Arc Flash Analysis
Power Plant Services
Electrical Consultants
Electrical Repair
Circuit Breaker Repair
Automatic Transfer Switch
Installations
Transformer Rigging And Moving
Transformer Assembly, Installation & Commissioning
Process
Service Project Inquiry Form
Contact Us

http://www.tyronpowerservices.com/?p=2443 5/7
5/19/2018 Transformer Assembly, Installation & Commissioning

Testing Services
Circuit Breaker Testing
Fall of Potential Ground Test
Generator Testing
High Voltage Testing
Instrument Testing
Power Cable Testing
Neta Testing

SF6 Circuit Breaker Testing


Switchgear Testing And Maintenance
Ground Fault Testing
Hi Pot Testing
Merger Test
Power Transformer Testing
Protective Relay Testing

Maintenance Services
SF6 Circuit Breaker Maintenance
Switchgear Maintenance
Circuit Breaker Maintenance
Neta Maintenance
Transformer Maintenance
Substation Maintenance Services

Contact Us
Tyron Power Servicesr
Tyron Ultra Applications Limited
400 Gbazango Extension,
Along Arab Road,

http://www.tyronpowerservices.com/?p=2443 6/7
5/19/2018 Transformer Assembly, Installation & Commissioning

Kubwa Abuja
Nigeria

Phone +2348-053-900-000
Fax +2348-053-900-000

Home
Testing Services
Careers
Contact Us

© 2014 by Tyron Ultra Applications

Back to Top

http://www.tyronpowerservices.com/?p=2443 7/7

Potrebbero piacerti anche