Viduct Inclination according to the Section- A-A Ramp/Retaining Wall

Alignment Dwgs.
Scope of Track Work
Vertical Curve Section- B-B

Ramp Inclination according to the


Alignment Dwgs. Track Inclination according to the
700 Transition vertical curve according to the Scope of Track Work
Expansion Joint
Movement Joint
Alignment Dwgs. Alignment Dwgs.
rail
4200
700
uic60 700
200 150

rail uic60

150
50
100
50
200 184

Dowel Bar installed


by civil contractor

concrete layer
with 200mm spacing

Girder 1 Grade of Concrete Layer - M 25 A 20

800
Scope of Track-work

Scope of Civil Work End Cross Beam


2

600
1- Concrete Layer
Drain Stones Ev2 = Modulus of Elasticity taken
DPr 0.98 2- Subgrade Protection Layer (Subballast, to be K from second load step in a plate
loading test
done by Civil Contractor - not less than 300mm) DPr > 0.97
DPr = Proctor density degree of compaction Scope of Civil Work

Soil

Plan of drainage on transition from Viaduct to At Grade


Portion of Ballastless Track
ELASTOMER OMEGA-SHAPED
COVER JOINT (TH=8mm) 700
GALVANSIED STEEL PLATE 80X8
WITH OBLONG HOLES 400 Movement Joint
Expansion Joint

2.5%
2.5% 1%
rail 1%
uic60
GAP
200 150
2.5% 2.5%

150
50
100
50
OMEGA JOINT
Viaduct Portion At Grade Portion
200 184

Dowel Bar installed


by civil contractor
with 200mm spacing

Note : - 1. Fastening System Vossloh 336.


2. All Dimensions are in mm.
3. Grade of Concrete for Plinth - M35 A 20,Grade of Steel Fe 500
12
4. Grade of Concrete Layer - M 35 A 20 Scope of Track-work
5. The final size and the position for third rail bracket .

Scope of Civil Work


mounting shall be obtained from EP1-CC Contractor
346

Trackwork contractor shall do necessary interface


accordingly.
6. The Drainage System is only for reference and will be
constructed by the Civil Contractor
7. Track Work Contractor to connect Drainage System provided by 517 REVISION CONTROL
the Civil Contractor.
8. Shear connectors will be provided in all sections
9. Shear connectors in the Retaining wall section will be as
per the other sections 0 16.01.2017 FOR APPROVAL
10. E & M Services shown for information only - refer the civil for details
Shear Connector REV. NO. DATE DESCRIPTION

ISSUED BY
PROJECT NAME:
PROOF CONSULTANT CONSTRUCTION OF BRIDGES (INCLUDING RAIL OVER BRIDGE OVER CONCOR SIDING AT KHAPRI),
THE DESIGN AND DRAWING AS CERTIFIED AND SUBMITTED BY THE INTERIM CLIENT : NAGPUR METRO RAIL CORPORATION LIMITED RETAINING WALLS, BOUNDARY WALLS AND EARTH WORK IN DEPOT AND AT GRADE SECTION
BETWEEN AIRPORT - KHAPRI - MIHAN DEPOT SECTION ON NORTH SOUTH CORRIDOR OF NAGPUR
DESIGN CONSULTANT HAVE BEEN REVIEWED AND PROOF CHECKED BY PROOF METRO RAIL PROJECT,
CONSULTANT AND ARE RECOMMENDED FOR APPROVAL

(QUALITY ASSURANCE)
LOCATION : AT GRADE SECTION (CONCOR SIDING VIADUCT) ISSUE RECORD APPROVED
THE RESPONSIBILITY OF CONTROL, CHECK AND VERIFICATION OF ACCURACY
DRAWING TITLE: TRANSITION SECTION - AT GRADE TO AS - BUILT
CORRECTNESS,COMPLETENESS,INTEGRATION AND FULL COMPLIANCE OF CONTRACT
PROVISIONS IN RESPECT OF DESIGN ANALYSIS AND DRAWING RESTS WITH THE DESIGNER
NO OBJECTION FOR CONSTRUCTION (Name and Designation)
ELEVATED SECTION GOOD FOR CONSTRUCTION
Authorised Signatory for Proof Consultant.
DRAWING NO.: 221124/CONCOR/TRACK/ 042 TENDER DRAWINGS
EX. EN PROOF CONSULTANT:
V.N.I.T, NAGPUR A R K Reddy M V S S Raju Shameer Basha Shameer Basha REV. : 0 SHEET. : 1 of 3 DESIGN DEVELOPMENT
GM (D&P) PRELIMINARY DESIGN
PREPARED BY CHECKED BY APPROVED BY ISSUED BY SCALE :
SHEET SIZE: A1 PLOTTING SCALE 1:1