Sei sulla pagina 1di 1

NOTES

ALL DIMENSIONS MUST BE CHECKED ON SITE BY THE


1
20deg roof pitch CONTRACTOR BEFORE WORKS COMMENCES
portuguese clay tile
on roof structure to SEs details 2 FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE
ROOF LEVEL TO SCALING OF DRAWING

ALL RC COLUMNS, SLABS, FOUNDATIONS AND ROOF


3

3,250
staircase shaft STRUCTURE TO STRUCTURAL ENGINEERS DETAILS

3,400
to ses details
4 THIS DRAWING MUST READ IN CONJUCTION WITH
DRAWINGS CODED THEREIN
900mm high parapet block wall

150
150
SECOND FLOOR LEVEL with throated coping
plastered and painted 5 COPYRIGHT IN THIS DRAWING AND IN THE WORK
to architects approval EXECUTED FROM IT IS THE PROPERTY OF
ARCH. CATHERINE N. MUYINDA

600
200mm thick concrete blockwall Ridge ventilator to
3,000

plastered and painted MEs specifications


SHARED BATH REVISIONS

2,400
CLOSET to architects approval

FIRST FLOOR LEVEL


NO. DATE DESCRIPTIONS
cantilevered rc slab to ses details
Louvred roof vent to details

600
window to openings schedule
3,000

3,300
BATHROOM ROOF LEVEL

2,400
BANQUETE HALL DRIVEWAY
3.3m clear height
GROUND FLOOR LEVEL
rc column to ses details

3,400
rc foundations to ses details
450

450
GROUND LEVEL 900mm high parapet block wall
with throated coping
SECOND FLOOR LEVEL plastered and painted
to architects approval

SECTION

3,000
door to openings schedule

L[--]06 FIRST FLOOR LEVEL

plaster mouldings to
architects approval

3,000
Ridge ventilator to 200mm thick concrete blockwall
MEs specifications plastered and painted
GROUND FLOOR LEVEL to architects approval

Solar panels to

450
GROUND LEVEL
MEs specifications

20deg roof pitch


portuguese clay tile
ROOF LEVEL
on roof structure
to SEs details
ELEVATION
L[--]08
3,400

900mm high parapet block wall


with throated coping
SECOND FLOOR LEVEL plastered and painted
to architects approval
3,000

window to openings schedule

FIRST FLOOR LEVEL

200mm thick concrete blockwall


plastered and painted
3,000

to architects approval

door to openings schedule Ridge ventilator to MEs specifications


GROUND FLOOR LEVEL
450

GROUND LEVEL Louvred roof vent to details

ROOF LEVEL

ELEVATION staircase shaft

3,400
to ses details

L[--]07
SECOND FLOOR LEVEL CLIENT
ANNIE NAKYEYUNE KYEYUNE
P. O. Box 149,
door to openings schedule MASAKA.

3,000
CLIENT'S SIGNATURE
Ridge ventilator to 900mm high parapet block wall
FIRST FLOOR LEVEL with throated coping
MEs specifications
plastered and painted
to architects approval
PROJECT
Solar panels to

3,000
MEs specifications PROPOSED RESIDENTIAL HOUSE ON
200mm thick concrete blockwall
PLOT NO 259,260, BLOCK No 442, LAND AT
20deg roof pitch plastered and painted BUSAMBAGA.
portuguese clay tile GROUND FLOOR LEVEL
to architects approval
ROOF LEVEL on roof structure
to SEs details
450

GROUND LEVEL
CONSULTANTS
3,400

elevator to MEs specifications


arch. catherine n. muyinda
aluminium curtain walling ELEVATION
SECOND FLOOR LEVEL
to openings schedule MOB: (+256) 712 218 788
L[--]10
ARB No. 188
3,000

window to openings schedule

900mm high parapet block wall


FIRST FLOOR LEVEL with throated coping STRUCTURAL ENGINEER
plastered and painted
to architects approval

MECHANICAL AND ELECTRICAL ENGINEER


3,000

200mm thick concrete blockwall


plastered and painted
GROUND FLOOR LEVEL to architects approval
DRAWING TITLE
450

GROUND LEVEL
SECTION AND ELEVATIONS

ELEVATION SCALE
1:100
JOB NO.

L[--]09 DRAWN BY DRAWING NO.


SOLO. K. L[--]06-10
CHECKED BY REVISION
C.M.
DATE
March 2018