Sei sulla pagina 1di 7

1.

OBJECTIVE
Provide guidance and standard of work to be performed during inspection
and testing against with any device contained therein in accordance with
specifications that have been specified in the design and drawing.
2. SCOPE
This procedure defines the things that must be done while doing inspection work
and panel switchgear / switchboard testing in accordance with the scope of work that has been
agreed between the contractor and the customer.
3. RESPONSIBILITY
Implementing the testing job is obliged to do the testing work that has been
agreed upon and in accordance with the scope of work and data report on all the work
have been done.
4. TEST REPORT
Test reports should include the following:
1. Project name
2. Description of tested equipment
3. Description of the test
4. Test data record
5. Analysis and recommendations / recommendations (if any)
Test data records must cover all aspects of the required information and records of the results
all the testing has been done.
5. TESTING
1. Testing characteristics
1. Protective Relay, this test includes:
This test is done according to the characteristics and settings that have been determined by
the customer. The procedure is set up in a protective relay testing procedure (document
separate).
2. Transformator Current, this test scopes:
1) Checking ratio
2) Polarity checking
3) Inspection of magnetism curve (excitaion curve)
4) Measurement of direct winding resistance (DC winding resistance)
5) Burden Measurement (VA)
6) Measurement of insulation resistance (Insulation Resistance)
3. Voltage Transformer
1) Checking ratio
2) Polarity checking
3) Measurement of insulation resistance (Insulation Resistance)
2. Circuit Breaker, this test includes:
1) Measurement of insulation resistance (Insulation Resistance)
2) measurement of opening and closing time (Opening time & closing time)
3) measurement of contact resistance (contact resistance)
4) examination of minimum working voltage of the coil (Closing & Opening)
3. Disconnecting Switch, this test includes:
1) Measurement of insulation resistance (Insulation Resistance)
2) Measurement of contact resistance
4. Busbar Main Panel, this test includes:
1) Measurement of insulation resistance (Insulation Resistance)
2) High voltage testing with CB rack-out position
3) High voltage testing with CB rack-in position (optional)
4) Testing of contact resistance busbar connection (contact resistance)
5. Nuetral Grounding Resistor (NGR), this test includes:
1) Measurement of insulation resistance (Insulation Resistance)
2) Measurement of element resistance value
3) Pengukukuran grounding (Earth Resistance)
6. Medium voltage power cable, this test includes:
1) Measurement of insulation resistance (Insulation Resistance)
2) High voltage test with DC voltage
3) Continuity checking (test continity)
1. Procedure of character inspection
1. Current Transformer (CT)
1) Checking ratio
2) Polarity checking
3) Inspection of magnetism curve (excitaion curve)
4) Measurement of direct resistance (DC resistance)
Examination and measurement of CT characteristics according to the above items is done with
using CT Analizer. This tool will work automatically after the RUN test. This tool
will show results:
- Test ratio (including% deviation / error value)
- Polarity (positive or negative)
- Excitation curve, current rating and excitation voltage
- Value of resitance and reference resistance
Burden measurements were performed using a CT Analizer. This tool will work
automatically after the RUN test. This tool will show results:
- Value impedance (Z)
- Total burden (VA)
6) Measurement of insulation resistance (Insulation Resistance)
This test aims to determine the level of resistance value of Primary voltage isolation and
secondary. This test is done by giving the voltage according to the table below
(adjusted with CT voltage rating and secondary quantity in CT).

2. Voltage Transformer (VT)


1) Checking ratio
2) Polarity checking
Figure 3: Ratio & Polarity Voltage Transformer test scheme
Burden measurements were performed using a CT Analizer. This tool will work
automatically after the RUN test. This tool will show results:
- Test ratio (including% deviation / error value)
- Polarity (positive or negative)
3) Measurement of insulation resistance (Insulation Resistance)
This test aims to determine the level of resistance value of Primary voltage isolation and
secondary. This test is done by giving the voltage according to the table below
(adjusted to the VT voltage rating and the secondary number present in VT).

2. Circuit Breaker
1) Measurement of opening and closing time (Opening time & closing time)
This test aims to determine the length of time Open and Close CB so it can
known performancenya. Open and close time must be smaller or equal to
standard from manufacturer / specification. The time difference between the phases of R-S-T should not
be
exceeding than 2.5ms for network frequency 50 Hz and 2.08ms for network with
frequency 60 Hz.
2) Measurement of contact resistance
This test aims to determine the value of the main contact resistance (pole R-S-T) with CB position
Close. This test is done by giving a current of 100 Amperes and measured the voltage value
dropnya, so get the value of his prisoner. Measurements were made using SMC-PRIME
600 which can display the value of resistance and its drop voltage.
3) Check the minimum working voltage of the coil (Closing & Opening)
This test aims to determine the minimum sensitivity of pickup voltage (energize) and
sensitivitsa voltage drop-out (de-energize). So it can be determined voltage value
minimum supplay that must be provided from the power supply.
4) Measurement of insulation resistance (Insulation Resistance)
This test aims to determine the value of insulation resistance from main main contact (pole R-S-T)
both between phases, phases and load lines, phases and ground. The magnitude of the voltage value
given in accordance with Breaker Breaker specification (see table 1).
3. Disconnecting Switch, this test includes:
1) Measurement of insulation resistance (Insulation Resistance)
2) Measurement of contact resistance
The method and purpose of this test is the same as the Circuit Breaker, as per the scope items.