HYDRO TEST CHECKLIST
Project Name: Project Location: Project Code:

S.No DESCRIPTION Rating Remarks


1 2 3 4 5
1 Did work safety Plan available on site? & full fill
Is pressure testing carried out using water, as the testing medium
2
(water is the least dangerous method)?
Is test equipment in good condition, properly fitted and of the
3
correct pressure rating for the job?
Did safety valves of adequate size and properly set, installed in
4 the test supply line to prevent the test pressure from being
exceeded?
5 Did calibrated pressure gauges fitted to equipment under test?
Are attachments unable to withstand the test pressure removed
6
or isolated?
Did you the controls/gauges at a safe distance from the
7 equipment to be tested and gauges clearly visible to the operator
controlling the pressure?
Is the area cordoned off to prevent unauthorized entry, and
8
warning signs posted?
9 Are look-out personnel posted to patrol the area?
Prior to pressuring, has the equipment to be tested thoroughly
10 examined e.g. for isolation, drains closed, vents open/shut as
required etc?
11 Are suitable vents and drains fitted to the system under test?
Are all personnel at a safe distance while system is under
12
pressure?
Are appropriate measures in place to safely de pressure the
13
system after testing?
Has provision been made for all safety devices isolated during
14 the test to be returned to their normal operating state after
testing?
Are appropriate procedures in place for treatment and disposal of
15
hydro test water?
16 Are the work men wearing the correct ppe s in site
Any other comments:

Name Designation Employee Code Signature with date


Filled By

Rating:1-Very poor 2- Poor 3- Average 4- Good 5- Very good