Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
ANNEXURE “A”
The Tenderer shall indicate below, the description and the basic unit prices of all items of materials and labour
on which increased costs will be claimed, any items omitted from these schedules will be regarded as FIXED in
price.
Please be specific and list each item- a general reference to suppliers’ price lists or catalogue is not acceptable.
“State the obvious”
WITNESSES
1. ____________________________________ _______________________________________
SIGNATURE OF CONTRACTOR
2. ___________________________________ ________________________________________
DATE
ANNEXURE “B”
The Tenderer is to submit a proposed construction programme for all works, sufficiently detailed to indicate the
tenderer’s ability to complete the works within the completion times required or such shorter period as the
tenderer considers practical. The programme shall be accompanied by detailed information which reflects the
placing of resources upon which the tender is based.
WITNESSES
1. ____________________________________ ______________________________________
SIGNATURE OF CONTRACTOR
2. ____________________________________ ______________________________________
DATE
ANNEXURE “C”
My/Our anticipated cash flow based on my/our proposed price and the completion dates is given below:
The Contractor will be required to provide updates of the above information on request from the Architect.
The Contractor should note that his cash flow prediction shall in no way affect the terms of payment as stated
elsewhere in this Document.
WITNESSES
1. ____________________________________ ________________________________________
SIGNATURE OF CONTRACTOR
2. ____________________________________ ________________________________________
DATE