Sei sulla pagina 1di 17

387237865.

xlsx

AS PLAN BoQ - IMPLEMENTATION


INDOSAT RIGHT OF WAY AND PERMIT PROJECT

Subcontractor : PT.Trans Mitra Mandiri


Site ID : SBY-DPP
Site Name : Apartemen Tamansari Depapilio
Cluster/Tower Name : Tower A

No DESCRIPTION UOM

1 Right Of Way and permit


1.1 Bridge Permit M

1.2 Public Right of Way Permit(underground) M

Signature:

Responsible Subcontractor
Name: Anggun Setiyono
Signature:
Date:

05/15/2018
387237865.xlsx

AS PLAN BoQ - IMPLEMENTATION


INDOSAT RIGHT OF WAY AND PERMIT PROJECT

Tamansari
SOW Total
Depapilio Tower A

Bridge Permit 13 13
Public Right of Way Permit, for National & Public Road included district road and
provincial road 1,306 1,306

Responsible Huawei Site Engineer Responsible Huawei RPM


Name: Name:
Signature: Signature:
Date: Date:

05/15/2018
387237865.xlsx

AS PLAN BoQ - IMPLEMENTATION


INDOSAT SURVEY & DESIGN PROJECT

Subcontractor : PT.Trans Mitra Mandiri


Site ID : SBY-DPP
Site Name : Apartemen Tamansari Depapilio
Cluster/Tower Name : Tower A

No DESCRIPTION UOM

0 Survey & Design

0.1 Detail Survey & Design M

0.2 Manhole/Handhole survey PCS

0.4 Detail Survey & Design (ISP) FTTB/H M

Signature:

Responsible Subcontractor
Name: Anggun Setiyono
Signature:
Date:

05/15/2018 华为保密信息,未经授权禁止扩散 第3页,共17页


387237865.xlsx

AS PLAN BoQ - IMPLEMENTATION


INDOSAT SURVEY & DESIGN PROJECT

Tamansari
SOW Depapilio
Tower A
Services
1. Subcontractors are required to do the survey and give the output with min. 3 options for the route, incl. survey
for the cable and duct route until OTB / Termination Location
2. The output result is completed As Plan Drawing and As Plan BoQ ( incl. civil design, cable drawing, optical core
schedule, link buget loss calculation etc.)
3. The route should be the shortest route, safe and ease to construct.
4. If the route is rejected, Subcontractors are required to re-do the survey without any additional charge. 1,463
5. The survey quantity will be calculated based on approved route and total km for trenching / boring.
6. The Documentation should be provided in 3 copies (softcopies and hardcopies).
7.The route will consist in hidden path and not in the straight line

8. Provide as build drawing

1. Subcontractors are required to open handhole/manhole by using suitable tools and check the existing FO
backbone route according to customer data.
2. Subcontractor shall take the coordinate data and existing FO backbone route from customer data.
3. The output result is location existing Hand Hole and idle duct/subduct information, existing FO backbone
information. 1
3. If the result is rejected, Subcontractors are required to re-do the survey without any additional charge.
4. The Documentation should be provided in 3 copies (softcopies and hardcopies),include: Photograph,b.
Coordinate of HH Existing, ACAD Drawing of HH existing,etc.

1. Subcontractors are required to do the survey and give the output with min. 3 options for the route, incl. survey
for the cable and duct route from ODF to ODP Termination Location through building shaft .
2. The route will consist in hidden path and not in the straight line .
3. The output result is completed As Plan Drawing and As Plan BoQ. Means completed si incl. civil design, cable
drawing etc. 50
4. The route should be the shortest route, safe and easy to construct.
5. If the route is rejected, Subcontractors are required to re-do the survey without any additional charge.
6. The survey quantity will be calculated based on approved route.
7. The Documentation should be provided in 3 copies (softcopies and hardcopies).

Responsible Huawei Site Engineer Responsible Huawei R


Name:Agnia Bela Name: Risky Septiadi
Signature: Signature:
Date: Date:

05/15/2018 华为保密信息,未经授权禁止扩散 第4页,共17页


387237865.xlsx

Total

1,463

50

sible Huawei RPM


Risky Septiadi

05/15/2018 华为保密信息,未经授权禁止扩散 第5页,共17页


387237865.xlsx

BoQ OPNAM / BoQ ACTUAL


INDOSAT ISP PROJECT

Subcontractor : PT.Trans Mitra Mandiri


Site ID : S36
Site Name : Apartment Sumatra 36

No DESCRIPTION UOM

2 Material
2.2 Pipe & Duct

2.2.14 Flexible spiral pipe 1.5" M

2.6 Cable Tray


Galvanize cable tray widht: 400mm, thickness:
2.6.11 M
1.8mm
2.7 Others

2.7.2 cable clamp PCS

5 Cable Work

5.4 Pulling optical fiber cable in duct 96-288 cores M

6 ODN product installation

Installation of wall mounted FAT and accessories


6.2 SET
including bracket

Install Optical Distribution Frame/ODF c/w Box,


6.9 SET
matrix terminal & accessories

6.12 Install micro splitter 1:8 PCS

6.14 Install micro splitter 2:8 PCS

7 DUCT INSTALLATION
Install flexible spiral pipe 1.5" included
7.2 M
accessories
8 Testing and Acceptance

Optical fiber cable splicing and testing per


8.4 EACH
core(96-288)

05/15/2018 华为保密信息,未经授权禁止扩散 第6页,共17页


387237865.xlsx

8.6 Bidirectional Testing(ODF-FAT) EACH

8.8 Optical splitter testing (modular/micro type) PORT

8.10 Documentation for acceptance for building EACH

Provide As-build drawing, core assignment,


8.12 EACH
customer CMDB database information for buidling

9 Labeling and Painting

9.1 Labeling for cable SET

9.2 Labeling for ODF, Pedestal, ODC, ODP SET

Signature:

Responsible Subcontractor
Name: Anggun Setiyono
Signature:
Date:

05/15/2018 华为保密信息,未经授权禁止扩散 第7页,共17页


387237865.xlsx

BoQ OPNAM / BoQ ACTUAL


INDOSAT ISP PROJECT

SOW AS PLAN

supply Flexible spiral pipe 1.5"


Detail standard refer to specification and design -

supply cable tray height: 50mm


Detail standard refer to specification and design
38

supply the aluminium cable clamp include screw , fishcer


Detail standard refer to specification and design 5

1. receive and store the 12-72 cores cable on site


2. installation of the cable with the standard work method
3. all the accessories, tools, cable labelling etc included -
4. cable is supplied by Huawei
5. detail standard refer to specification and design

1.receive and store the FAT on site.


2. install wall mounted FAT and any accessories
3. termination the Fiber Optic Cable incl. install the pigtail and all accessories -
4.pigtail and all accessories supply by Huawei
5.Detail standard refer to specification and design

1.delivery the ODF from Regional Warehouse to the location


2. install ODF and any accessories, Painting & Coding
3. termination the Fiber Optic Cable incl. install the pigtail and all accessories 1
4.pigtail and all accessories supply by Huawei

deliveryand Install micro splitter inside existing closure or pedestal FAT. Material included in 2.5
Detail standard refer to specification and design -
delivery and Install micro splitter inside existing closure. Material included in 2.5
Detail standard refer to specification and design 2

Delievery & installation incl. accessories excluded Pipe materials


Detail standard refer to specification and design -

1. perform splicing the fiber optic of ODF,FDT,FAT,Closure(96-288)


2. provide splicing data
1 EACH = 1 CORE 132
3.Detail standard refer to specification and design

05/15/2018 华为保密信息,未经授权禁止扩散 第8页,共17页


387237865.xlsx

1. perform the link testing(ODF-FAT)- OPM bidirectional for 2 wavelength: 1310nm and 1550nm, OTDR
bidirectional for 2 wavelength: 1310nm and 1550nm
2. provide the link test report 11
3. all the tools and accessories included
1 EACH = 1 CORE

1.Perform the optical splitter testing with - OPM and laser source using 1310/1490/1550 wavelength.
2.Plug-in or direct splice all pigtail according to port/core assignment. 120
3.Provide document test report.
Subcontractor are required to finish up and provide OTDR & OPM test photos, test results and all acceptance
documentation base on project requirements 1
1EACH=1Building

1. Subcontractors are required to provide as-build drawing after finish acceptance.


2. Core assignment shall be include on as-build drawing.
3. Subcontractors shall complete the customer CMDB database with all as-build information (ex. Core assignment, 1
ODF id, ODP id, FO cable id and etc).
1EACH=1Building

Supply & install labeling for cable, the detail standard cable labeling as requirement of 1pc for 3m length. The
propose material for label would be vinyl and font,dimension follow as customer requirement. -

Supply & install labeling for cable, the detail standard cable labeling as requirement on outside using vinyl and
inside using glossy and normal paper sticker. The propose font,dimension follow as customer requirement. 5

Responsible Huawei Site Engineer Responsible Indosat I


Name: Name:
Signature: Signature:
Date: Date:

05/15/2018 华为保密信息,未经授权禁止扩散 第9页,共17页


387237865.xlsx

ACTUAL DELTA

18 18

- -38

- -5

18 18

11 11

1 -

11 11

2 -

18 18

4 -128

05/15/2018 华为保密信息,未经授权禁止扩散 第10页,共17页


387237865.xlsx

11 -

120 -

1 -

1 -

6 6

12 7

sible Indosat IM2

05/15/2018 华为保密信息,未经授权禁止扩散 第11页,共17页


387237865.xlsx

AS Built BoQ - IMPLEMENTATION


INDOSAT OSP PROJECT

Subcontractor : PT.Trans Mitra Mandiri


Site ID : S36
Site Name : Apartment Sumatra 36

No DESCRIPTION UOM

SUBPACKAGE A+B+C
2 Material
2.2 Pipe & Duct

2.2.1 HDPE 40/33mm M

2.2.4 HDPE subduct 27/32mm M

2.2.8 Galvanized steel pipe (2" ID, 7.4 mm WT) M

2.3 Pole

2.3.9 Pole accessories Set

2.4 Wire

2.4.1 Messenger Wire 6mm M

2.4.3 Stay / guy wire and steel plate PCS

3 Civil Work
4 AERIAL WORK

Install stay / guy wire incl. accessories and steel


4.7 PCS
plate under the ground

4.10 Install messenger wire 6mm m

4.12 Install cable installation Accessories PCS

5 Cable Work

5.2 Install Self support aerial cable 96-144 cores M

5.4 Pulling optical fiber cable in duct 96-288 cores M

7 DUCT INSTALLATION

7.11 Install Galvanized steel pipe (2" ID, 7.4 mm WT) M

7.15 Install HDPE 40/33mm M

05/15/2018 华为保密信息,未经授权禁止扩散 第12页,共17页


387237865.xlsx

8 Testing and Acceptance

8.2 Optical cable testing for existing FO cable EACH

Optical fiber cable splicing and testing per


8.4 EACH
core(96-288)

8.15 Documentation for acceptance for OSP/Feeder M

Provide As-build drawing, core assignment,


8.16 customer CMDB database information for M
OSP/Feeder

Signature:

Responsible Subcontractor
Name: Anggun Setiyono
Signature:
Date:

05/15/2018 华为保密信息,未经授权禁止扩散 第13页,共17页


387237865.xlsx

AS Built BoQ - IMPLEMENTATION


INDOSAT OSP PROJECT

SOW S36

SUBPACKAGE A+B+C

Supply HDPE (exclude supply accecories)


Detail standard refer to specification and design base on project requirment 6
Supply HDPE (exclude supply accecories)
Detail standard refer to specification and design base on project requirment 140
Supply Galvanized Steel Pipe
Detail standard refer to specification and design base on project requirment 3

Supply Pole Accessories for 1 FO cable routing.


Detail standard refer to specification and design 6

Supply messenger Wire 6mm


Detail standard refer to specification and design 140
Supply stay / guy wire and steel plate
Detail standard refer to specification and design 140

Delivery & installation stay / guy wire incl. accessories and steel plate under the ground, exluded Stay/guy wire
and steel plate materials 140
Detail standard refer to specification and design
Delivery & installation 6mm messenger wire incl. accessories,exclude messenger wire materials
Detail standard refer to specification and design 140
Delivery & Install Additional Pole Accessories for more than 1 FO cable routing.
Detail standard refer to specification and design 6

1. receive and store the 96-144 cores Self support aerial cable ( Figure 8 cable ) on site.
2. installation of the cable with the standard work method
3. included all the accessories, tools, cable labelling etc.(except for slack hanger) 140
4. cable is supplied by Huawei
5. detail standard refer to specification and design

1. receive and store the 12-72 cores cable on site


2. installation of the cable with the standard work method
3. all the accessories, tools, cable labelling etc included 73
4. cable is supplied by Huawei
5. detail standard refer to specification and design

Delievery & installation incl. accessories excluded Pipe materials


Detail standard refer to specification and design 3
Delivery & installation incl. supply and install accessories. HDPE materials refer to 2.2
Detail standard refer to specification and design 6

05/15/2018 华为保密信息,未经授权禁止扩散 第14页,共17页


387237865.xlsx

1. Perform the cable testing: OTDR unidirectional for 2 wavelengths: 1310 and 1550nm
2. provide the test report
3. all the tools and accessories and splicing service included 4
4.1 EACH = 1 CORE

1. perform splicing the fiber optic of ODF,FDT,FAT,Closure(96-288)


2. provide splicing data
1 EACH = 1 CORE 3
3.Detail standard refer to specification and design
Subcontractor are required to finish up and provide OTDR & OPM test photos, test results and all acceptance
documentation base on project requirements 140
For OSP/Feeder only , calucate by meter
1. Subcontractors are required to provide as-build drawing after finish acceptance.
2. Core assignment shall be include on as-build drawing.
3. Subcontractors shall complete the customer CMDB database with all as-build information (ex. Core assignment, 140
ODF id, ODP id, FO cable id and etc).

Responsible Huawei Site Engineer Responsible Huawei R


Name: Name:
Signature: Signature:
Date: Date:

05/15/2018 华为保密信息,未经授权禁止扩散 第15页,共17页


387237865.xlsx

Total

140

140

140

140

140

140

73

05/15/2018 华为保密信息,未经授权禁止扩散 第16页,共17页


387237865.xlsx

140

140

sible Huawei RPM

05/15/2018 华为保密信息,未经授权禁止扩散 第17页,共17页

Potrebbero piacerti anche