Sei sulla pagina 1di 8

Project: Asta de Bandera Page # ___

Engineer: César Rodríguez 2/28/2018


Descrip: zapata de asta

GEOMETRY SOIL PRESSURES (Comb: Service)


6.00
6.00
16.0
0.50
12.0
12.0
0.00
0.00
2.00

APPLIED LOADS

0.4 0.6
2.5 3.5
2.5 3.5
0.2 0.2
0.2 0.2

OVERTURNING CALCULATIONS (Comb. Service)


- Overturning about X-X

- Resisting about X-X


W * L * Thick * Density =
W/2=
W * L * H * Density =
W / 2 - Offset =
W * L * SC * Density =
W/2=
W * L * γ * (SC + Thick - WT) =
W/2=

W / 2 - Offset =

Resisting moment
Overturning moment

1 of 8
Project: Asta de Bandera Page # ___
Engineer: César Rodríguez 2/28/2018
Descrip: zapata de asta

- Overturning about Z-Z

- Resisting about Z-Z


W * L * Thick * Density =
L/2=
W * L * H * Density =
L / 2 - Offset =
W * L * SC * Density =
L/2=
W * L * γ * (SC + Thick - WT) =
L/2=

L / 2 - Offset =

Resisting moment
Overturning moment

SOIL BEARING PRESSURES (Comb. Service)

Footing + Pedestal + Soil - Buoyancy + P =

Z-Resisting moment - Z-Overturning moment


Resisting force

X-Resisting moment - X-Overturning moment


Resisting force
Length / 2 - Xp =
Width / 2 - Zp =
Width * Length =
Length * Width² / 6 =
Width * Length² / 6 =

P * (1/ A + Z-ecc / Sx + X-ecc / Sz) =


P * (1/ A - Z-ecc / Sx + X-ecc / Sz) =
P * (1/ A - Z-ecc / Sx - X-ecc / Sz) =
P * (1/ A + Z-ecc / Sx - X-ecc / Sz) = 2 of 8
Project: Asta de Bandera Page # ___
Engineer: César Rodríguez 2/28/2018
Descrip: zapata de asta

SLIDING CALCULATIONS (Comb. Service)

kp = 1 / ka =
kp * Density * (Cover + Thick / 2) =
Pressure * Thick * Width =
Pressure * Thick * Length =
Resisting force * Friction coeff. =
Use 100% of Passive + 100% of Friction for sliding resistance
X-Passive force + Friction
X-Horizontal load
Z-Passive force + Friction
Z-Horizontal load

UPLIFT CALCULATIONS (Comb. Service)

Pedestal + Footing + Cover - Buoyancy


Uplift load

ONE-WAY SHEAR CALCULATIONS (Comb. Factored)

Thick - Cover - X-diameter / 2 =


Thick - Cover - X-diameter - Z-diameter / 2 =
Thick - Cover - X-diameter / 2 =
Thick - Cover - X-diameter - Z-diameter / 2 =
2 * ϕ * √(f'c) * Width * d / 1000 =
2 * ϕ * √(f'c) * Length * d / 1000 =

3 of 8
Project: Asta de Bandera Page # ___
Engineer: César Rodríguez 2/28/2018
Descrip: zapata de asta

FLEXURE CALCULATIONS (Comb. Factored)


5 * ϕ * √(f'c) * L * Thick² / 6 =
5 * ϕ * √(f'c) * W * Thick² / 6 =
- Top Bars
No Top Reinforcement Provided at the Footing

- Bottom Bars
Use 7 #5 Z-Bars ρ = As / b d =
Use 7 #5 X-Bars ρ = As / b d =
ϕMn = ϕ * b * d² * f'c * q * (1 - 0.59 * q)

0.0018 * Width * Thick =


0.0018 * Length * Thick =
Min (2.5, (Cover + db /2, Spacing / 2) / db) =
X-Ld = Max (12.0, 3 / 40 * fy / (f'c)½ * Size * Location / Cover * db * ratio)

X-Ldh = 0.02 * fy / (f'c)½ * db * 0.7 =


(Length - Col) / 2 + Offset - Cover =
(Length - Col) / 2 - Offset - Cover =

4 of 8
Project: Asta de Bandera Page # ___
Engineer: César Rodríguez 2/28/2018
Descrip: zapata de asta

Min (2.5, (Cover + db /2, Spacing / 2) / db) =


Z-Ld = Max (12.0, 3 / 40 * fy / (f'c)½ * Size * Location / Cover * db * ratio)

Z-Ldh = 0.02 * fy / (f'c)½ * db * 0.7 =


(Width - Col) / 2 + Offset - Cover =
(Width - Col) / 2 - Offset - Cover =

LOAD TRANSFER CALCULATIONS (Comb. Factored)


A1 = col L * col W =
col W * col L² / 6 =
col L * col W² / 6 =
Pbu = P / A1 + Mz / Sx + Mx / Sz =
Min (L / 2 - X-offset - col L / 2, W / 2 - Z-offset - col W / 2)

A2 = Min [L * W, (col L + 2 * Min edge) * (col W + 2 * Min edge)]

ϕPnc = ϕ * 0.85 * f'c * Min [2, √(A2 / A1)] =


ϕPns = ϕ * As * Fy / A1 =
ϕPn = ϕPnc + ϕPns =
ϕPnc = ϕ * 0.85 * f'c =
ϕPns = ϕ * As * Fy / A1 =
ϕPn = ϕPnc + ϕPns =
ϕVn = ϕ * As * Fy * μ =
Vu = Max (Vux, Vuz) =
Ld = Max (12.0, 3 / 40 * fy / (f'c)½ * Size / Cover * db * ratio)

Ldh = 0.02 * fy / (f'c)½ * db * 0.7 =


Pedestal height - Cover =
Footing thickness - Cover =

5 of 8
Project: Asta de Bandera Page # ___
Engineer: César Rodríguez 2/28/2018
Descrip: zapata de asta

PUNCHING SHEAR CALCULATIONS (Comb. Factored)


d /2 =
d /2 =
αsx + αsz = L/W=
bo = αsz / 10 * (L + d / 2 + X-Edge) + αsx / 10 * (W + d / 2 + Z-Edge)

Abo = (L + d / 2 + X-Edge) * (W + d / 2 + Z-Edge) =


ϕ * Min (2 + 4 / β, αs * d / bo + 2, 4) * √(f'c)

F = P + Pedestal + Abo * Thick * Density - Bearing

L + d / 2 + X-Edge = W + d / 2 + Z-Edge =
1
1-
1 + (2/3) √(b2 / b1)
1
1-
1 + (2/3) √(b1 / b2)
b1 / 2 = b2 / 2 =
b1 * d³ / 6 + b1³ * d / 6 + b1² * b2 * d / 2

b2 * d³ / 6 + b2³ * d / 6 + b2² * b1 * d / 2

F / (bo * d) * 1000 =
γvx * X-OTM * X2x / Jcx =
γvz * Z-OTM * X2z / Jcz =
P-stress + Mx-stress + My-stress =

6 of 8
Project: Asta de Bandera Page # ___
Engineer: César Rodríguez 2/28/2018
Descrip: zapata de asta

COLUMN CALCULATIONS (Comb: Factored)

Ec = 57 * √(f'c * 1000) =
fr = 7.5 * √(f'c * 1000) / 1000 =

Use 8-#5 Longitudinal Bars Use Ties #3 Transverse Reinf. ,


1.20 * W * L * H * Density =

√(Mux² + Muz²) =
θ = Arc Tan (Muz / Mux) =
k=c/d=
(k * d - d1) / (k * d) * Max strain =

C = Sum (Fci) = Sum (fci * Aci) =


Sum (Mci) = Sum (Fci * (h / 2 - di)) =
Mn = Ms + Mc =
(0.65 - 0.90) / (0.65 * Pn (balanced) - 0.9 * Pn (Es = 0.005)

Min (0.9, Max (0.65, slope * (Pu - 0.9 * Pn (Es = 0.005)) + 0.9))

Pn = 0.8 * 0.85 * f'c * (A1 - As) + fy * As =

Max (Pu / ϕPn, Mu / ϕMn) =

7 of 8
Project: Asta de Bandera Page # ___
Engineer: César Rodríguez 2/28/2018
Descrip: zapata de asta

DESIGN CODES

8 of 8

Potrebbero piacerti anche