Sei sulla pagina 1di 7

# Description Qty UNIT PRICE TOTAL

A FIRE FIGHTING SYSTEM -


Combined Fire Fighting Pump for Sprinkler & Wet riser system consisting of: -( Diesel +
1
Electrical + Jockey) 1500 GPM, 10 bar, VERTICAL TURBINE, UL Listed 1
2 Accessories and Fittings for The Above Pump 1
-
B FIRE FIGHTING SYSTEM
1 6” x 4 Way Breaching Inlet with Cabinet 3
Fire Hose Reel with Double Cabinet Surface Mounted, SS, Brush Finish Door &
Architrave, Consisting Of: -
1No. Ø 25 x 30m long Automatic Hose Reel with Nozzle
1No. Ø 25 Lock Shield Valve
1No. Ø 25 Pressure Reducing Valve
2 72
1No. Ø 65 Landing Valve X 30 MTR Long Hose & Nozzle with Built-in PRV
1No. Ø 65 Pressure Reducing Angle Valve (UL/FM Approved)
1No. Ø 65 x 30m Long Hose & Nozzle UL Listed
1No. 5kg CO2 Fire Extinguisher - Kitemark
1No. 6kg DCP Fire Extinguisher – Kitemark
3 1’’ Air Release Valve 3
4 Retard Chamber 1
5 Water Motor Alarm Gong 1
6 4” OS and Y Gate Valve 1
7 Supervisory Switch for OS & Y Valve 1
8 Butterfly Valve Ampere Switch 1
9 Water Flow Switch 1
10 Sure, Test and Drain Valve 1
11 Spare Sprinkler Cabinet 12 Nos Capacity 1
12 2 kg DP Fire Extinguisher 72
13 5 Kg CO2 Fire Extinguisher 4
14 6 kg DP Fire Extinguisher 4
-
C SPRINKLER & FIRE HYDRANT SYSTEM
1 Pendent Sprinkler 212
2 Upright Sprinkler 950
3 6" Fire Hydrant 4
4 HDPE Pipe & Accessories 1
5 65 mm Zone Control Valve 73
-
D FIRE SUPPRESSION SYSTEM
1 LV Room @GF (25) SQM: Height-4 1
-
E FIRE ALARM SYSTEM
1 Addressable Main Fire Alarm Control Panel - 4 loop 1
2 Addressable Type Smoke Detector 116
3 Addressable Type Smoke Detector with sounder 82
4 Addressable Type Multi Smoke Detector 72
5 Addressable Type Optical Heat Detector 72
6 Addressable Type Manual call point 72
7 Addressable Type Fire Alarm Sounder with Flasher W/P 22
8 Addressable Type Fire Alarm Sounder 72
9 Isolator Modules 30
10 Monitoring Modules For ZCV 9
11 Control Relay Module For Roller Shutter 72
12 Interfacing Units 10
13 Fireproof Cable and Accessories 1
14 Installation, Testing and Commissioning Charges 1
-
F MONITORED TYPE EMERGENCY LIGHTING SYSTEM
1 Monitoring Panel 2
2 Addressable Emergency Ligh, Non – Maintained, Surface Mounted (Non-LED Type) 304
3 Addressable Exit Light, Maintained, ( Non- LED Type) 100
4 Fireproof Cable and Accessories 1
5 Installation, Testing and Commissioning Charges 1
-
AMOUNT
SL. NO SYSTEM DESCRIPTION BRAND
(IN AED)
1 FIRE PUMP SET
2 FIRE FIGHTING SYSTEM ALL
3 FIRE SPRINKLER SYSTEM MATERIAL
S DCD
4 FIRE SUPPRESSION SYSTEM APPROVE
5 FIRE ALARM SYSTEM D
6 EMERGENCY LIGHTING MONITORING SYSTEM
TOTAL Dirham’s Fils Only
VAT 5 %
GRAND
Dirham’s Fils Only
TOTAL

SL NO. ITEM DESCRIPTION QTY


A FIRE FIGHTING PUMP SET

Horizontal Fire Fighting Pump Set (D+J+E) Capacity: 1000GPM @10 Bar 1 Nos.
1 1
Electrical Pump, 1 Nos. Diesel Pump, 1 No. Jockey Pump

3 Valves and Necessary Fittings for above Pump set 1

4 Installation, Testing and Commissioning charges for above Pump sett 1

SUB-TOTAL PRICE OF FIRE PUMP


B FIRE FIGHTING SYSTEM
1 6” x 4 Way Breaching Inlet with Cabinet 2

Fire Hose Reel with Double Cabinet Surface Mounted, SS, Brush Finish Door &
Architrave, Consisting Of: -

1No. Ø 25 x 30m long Automatic Hose Reel with Nozzle

1No. Ø 25 Lock Shield Valve


1No. Ø 25 Pressure Reducing Valve

2 1No. Ø 65 Landing Valve X 30 MTR Long Hose & Nozzle with Built-in PRV 6

1No. Ø 65 Pressure Reducing Angle Valve (UL/FM Approved)

1No. Ø 65 x 30m Long Hose & Nozzle UL Listed

1No. 5kg CO2 Fire Extinguisher - Kitemark

1No. 6kg DCP Fire Extinguisher – Kitemark

3 1’’ Air Release Valve 2


4 Retard Chamber
5 Water Motor Alarm Gong
6 4” OS and Y Gate Valve
7 Supervisory Switch for OS & Y Valve
8 Butterfly Valve Ampere Switch 1
9 Water Flow Switch
10 Sure, Test and Drain Valve

11 Spare Sprinkler Cabinet 12 Nos Capacity

12 5 Kg CO2 Fire Extinguisher 74


13 6 kg DP Fire Extinguisher 74

14 Installation, Testing and Commissioning Charges 1

SUB-TOTAL PRICE OF FIRE FIGHTING SYSTEM

C SPRINKLER SYSTEM

1 Upright Sprinkler head 79-Deg C,K -5.6 STD RESPONSE 135

2 Recessed Pendant Sprinkler head 68-Deg C, , K -5.6 Quick RESPONSE 327

3 65 mm Zone Control Valve 5


4 150 mm Zone Control Valve 2

Alarm Check Valve 6", 175 PSI, includes Vertical Trim Water Motor Gong, Retard
5 2
Chamber and Pressure Switch

6 6'' Non-Return Valve 2

7 6" O S & Y Gate Valve with Tamper Switch 1

8 2"Gate Valve for Drain 2

9 1"Air release valve with pressure Gauge 2

10 Installation charges of Fire Fighting System 1

SUB-TOTAL PRICE OF FIRE SPRINKLER SYSTEM 190,500.00

D FIRE SUPPRESSION SYSTEM

1 Low current Room @GF (71) SQM: H-4 CAS 1

2 Tele Room @GF (28.4) SQM: H-4 CAS 1

3 Security Room @GF (21) SQM: H-4 CAS 1

4 Deluge System @ Roof For LPG 1

5 Machine Room 1 @ Roof - Pre-Action system 1


6 Machine Room 2 @ Roof - Pre-Action system 1

7 Installation, Testing and Commissioning Charges 1

SUB-TOTAL PRICE OF SPECIAL SYSTEM

E FIRE ALARM SYSTEM WITH VOICE EVACUATION SYSTEM

1 Fire Alarm Control Panel (2 LOOP) With Voice Evacuation Panel (with distribution panel) 1

2 Addressable Optical Smoke Detector with Standard base 114

3 Addressable Multi Sensor 4

4 Addressable heat Detector with Standard base 4

5 Addressable Manual Call Point 11


6 Addressable Manual Call Point W/P 4
7 Addressable Fire Alarm Sounder 8
8 Addressable Fire Alarm Sounder W/P 8
9 Isolator Module 8
10 Fire Alarm Sounder with Flasher 4
11 IFU (Interface Control Module) 22
12 Ceiling Speaker 61
13 Wall Mounted Speaker 12
14 Telephone Jack 12

15 5 no's of Pluggable Telephone with Emergency Cabinet 1

16 Programing 1

17 Installation, Testing and Commissioning Charges 1

SUB-TOTAL PRICE OF ALARM SYSTEM

F EMERGENCY LIGHT MONITORING SYSTEM


1 Emergency Light Monitoring Panel(ELMP) 2

2 Addressable Emergency Light Non-Maintained – Surface Type – Led 24

3 Addressable Emergency Light Non-Maintained Recessed Type – Led 109

4 Addressable Exit Light Maintained – Led 66

5 Programing 1

6 Installation, Testing and Commissioning Charges 1

SUB-TOTAL PRICE OF EMERGENCY SYSTEM


TERMS & CONDITIONS:

1.         Our offer is based on the drawings provided by you, however if any additional materials, equipment are
required during detailed engineering / execution based on the requirements of client consultant and civil defense, it
will be treated as variation.

2.         Any fees pertaining to Civil Defense, 24 x7 panel installation, municipality or any other government
authorities applicable to obtain civil defense approval and for the execution of the project should be paid by the
client.

3.         The client shall provide all documentation required for civil defense application with original approved civil
defense drawings along with the following. (Site plan, municipality details, land rent agreement, safety certificates
etc.)

4.        The proposed equipment’s are rated for 12 bar (175 PSI) pressure unless otherwise mentioned.

5. We have considered above ground pipe of galvanized steel ERW ASTM A 53 GRADE B Sch. 40 which are listed
and approved (Not Seamless)

6. We have considered Horizontal Split Case Fire Pump capacity based on the drawings provided by you in the
main offer.
7. We have considered UL Listed grooved fittings above 2” size
8. We have considered threaded fittings for sizes below 2 ½” size.

9.        Please do mention our quotation reference number as mentioned on the top of our offer on the LPO.

10.     An additional amount of 5% VAT will be charged extra where applicable as per new UAE tax reforms.

11.     Based on the architectural drawings provided, it was found the suspended ceiling height in few area are more
800mm. In such situations, it is mandatory to provide Void Smoke Detector with Remote Indicator and Upright
Sprinkler. But the same was not indicated in the Fire Alarm & Fire fighting drawings provided. Its is estimated that,
in such occasion, it would cost an additional AED 98,752.00 (VAT Inclusive). This is based on rough estimation.
Proper BOQ could be provided based on DCD approved drawings.

EXCLUSIONS:

1.         All civil works such as concrete works, excavation and back filling, wall opening and closing, pump room
foundation, trucking work, conduit, fixation of black box, protection caps and electrical work etc. are excluded from
our scope of work.

2.        Third Party Approval is not considered in our offer.

3.        We have not considered Hydrant system, smoke management system in our scope of work.
4.         Installation of incoming power supply, electrical cable up to Fire Pump control panel insulator (inside the
pump room) along with all necessary isolator / MCB and proper earthling is not considered in our scope of work.

5.         Anti-vortex Plate, Expansion Joints, Seismic support, puddle flange, foot valve, level indicator, pressure
vessel for pump is not considered in our offer.

6.         Fire pump room, fire water tank with accessories, tank filling pipe line, site store for material, all civil works,
and fire stop materials required for closing of openings any type of spares, pipe sleeves for wall crossings and
aluminum scaffolding & man lift during execution.

7.        System maintenance, MEP services like power cables, water supply & tanks, drainage,
containment or conduit, seismic bracing, waxing for sprinklers, signage / labeling etc. or any
system other than mentioned above.

8.        Scaffolding/carnage/access platforms (with erection, dismantle, operation & inspection),


Man Lift, Scissor lift for facilitating works above 5 meters.

9.         Stand by Generator, Water Storage for Hydraulic testing, Site soil sample for geotechnical investigation, Fork
lift and cranes are excluded from our offer.

10.     Fire protection for the obstruction due to the ducts not considered since no details are provided.

11.     Secondary supports for firefighting and sprinkler system between columns and purlins.

12.     Aluminum cladding and insulation for Diesel engine exhaust pipe line.

13.     Factory Witness / acceptance test for any equipment.

14.     Any additional in bill of quantity due to the unforeseen design or required by consultant/client during that time
of installation would be at an additional cost.

15.     Any civil / builders works, false ceiling openings, Pipe sleeves, concrete
base/supports/chambers/thrust blocks, damper/drop curtain, pipe sleeves & fire proofing
compounds, Fire sealant, secondary steel supports.

16.     Basic facilities such as water, diesel, electricity, site access, and work permit required for
testing and commissioning of the system is not considered in our offer.

17.     Three phase power connection should be provided for the execution of the system.
18.     Fire water tank connection from municipality supply and its piping works is not considered
in our scope of work.
19.     Site office, storage facility with locking facility sufficient to store all our materials at site.

20.     Direct alarm system (24x7) or scan tonic system with civil defense

21.     Underground pipe for HDPE is not our scope


22.     Graphic Command Centre with PC & printer excluded. If required, shall be quoted
separately.
23.     Duct Detector Excluded From scope. If required would be additional.

24.     Preparation RCP drawing. We will only able to assist for the same

Terms & Conditions

Total Price : AED: 1,264,975.43


Materials are as per Vendor List provided.

Payment Terms : Can be mutually discussed and agreed.

Warranty : Warranty against manufacturing defect will be covered for one year from date of
commissioning.

Potrebbero piacerti anche