NO COST CENTER NO JDE WORK ORDER DESCRIPTION WORK AREA DAY
1 Stand by at Office (have'nt Badge) Duri Camp 1
2 Stand by at Office (have'nt Badge) Duri Camp 1
3 Stand by at Office (have'nt Badge) Duri Camp 1
4 Stand by at Office (have'nt Badge) Duri Camp 1
5 Stand by at Office (have'nt Badge) Duri Camp 1
6 Stand by at Office (have'nt Badge) Duri Camp 1
7 Stand by at Office (have'nt Badge) Duri Camp 1
Check Battery AC/DC (Gravity Test, Impedance Battery,
8 Batang Substation 1
Measurement Voltage Battery
9 Visit to Site AWT 10 Substation 1
Check Battery AC/DC (Gravity Test, Impedance Battery,
10 Bekasap Substation 1
Measurement Voltage Battery
11 Tan Delta Test Recloser Warehouse Duri Camp 1
12 Callibration Automechanic Relay 50/51, 79 Central Duri 1
13 Stand by at Office 1
14 Function Test Switcher Nella Substation 1
Duri Camp (Shop
15 Check Wiring Control Panel Control Fan Transformer Old 1
Transformer)
16 Troubleshooting fault 87G and 50/51G (Continuity CT of CB 44) Duri Ring Bus 1
Date :
1.000 94,266,000 94,266,000
0.045 4,284,818
4/11/2017
4/12/2017
4/13/2017
4/16/2017
4/17/2017
4/18/2017
4/19/2017
4/20/2017
4/23/2017
4/24/2017
4/25/2017
4/26/2017
Responible :
PT. CHEVRON PACIFIC INDONESIA 4/27/2017
Signature,
4/30/2017
Name :
Badge :
Date :
SUMMARY ACTIVITY
Date :
22 1.000 94,266,000 94,266,000
1 0.045 4,284,818
4/3/2017
4/4/2017
4/7/2017
4/8/2017
4/9/2017
4/10/2017
4/11/2017
4/12/2017
4/13/2017
4/16/2017
4/17/2017
4/18/2017
4/19/2017
4/20/2017
4/23/2017
4/24/2017
4/25/2017
4/26/2017
4/27/2017
4/30/2017
Responible :
PT. CHEVRON PACIFIC INDONESIA
Signature,
Name :
Badge :
Date :