SUMMARY ACTIVITY

JOB TITTLE SPECIALIST RELAY 22


NAME MUCHAMAD JANUAR EFFENDI 1
PERIODE Apr-18

WORK
NO COST CENTER NO JDE WORK ORDER DESCRIPTION WORK AREA DAY
1 Stand by at Office (have'nt Badge) Duri Camp 1
2 Stand by at Office (have'nt Badge) Duri Camp 1
3 Stand by at Office (have'nt Badge) Duri Camp 1
4 Stand by at Office (have'nt Badge) Duri Camp 1
5 Stand by at Office (have'nt Badge) Duri Camp 1
6 Stand by at Office (have'nt Badge) Duri Camp 1
7 Stand by at Office (have'nt Badge) Duri Camp 1
Check Battery AC/DC (Gravity Test, Impedance Battery,
8 Batang Substation 1
Measurement Voltage Battery
9 Visit to Site AWT 10 Substation 1
Check Battery AC/DC (Gravity Test, Impedance Battery,
10 Bekasap Substation 1
Measurement Voltage Battery
11 Tan Delta Test Recloser Warehouse Duri Camp 1
12 Callibration Automechanic Relay 50/51, 79 Central Duri 1
13 Stand by at Office 1
14 Function Test Switcher Nella Substation 1
Duri Camp (Shop
15 Check Wiring Control Panel Control Fan Transformer Old 1
Transformer)

16 Troubleshooting fault 87G and 50/51G (Continuity CT of CB 44) Duri Ring Bus 1

17 Function Test Switcher Nella Substation 1


18 Troubleshooting fault 87G and 50/51G (CT NGR Test TRAFO 3 ) Duri Ring Bus 1

19 Function Test Recloser (Close/Open) Duri Camp 1


PT. INDOKOMAS BUANA PERKASA
20 Signature, Function Test Recloser (Close/Open) Duri Camp 1
Lancang Kuning Duri
21 HSE Annual Meeting 1
Camp
TOTAL

Date :
1.000 94,266,000 94,266,000
0.045 4,284,818

% Alocation / ACTUAL PRICE REMARKS DATE


Month
4/2/2017
4/3/2017
4/4/2017
4/5/2017
4/6/2017
4/9/2017
4/10/2017

4/11/2017

4/12/2017

4/13/2017

4/16/2017
4/17/2017
4/18/2017
4/19/2017

4/20/2017

4/23/2017

4/24/2017
4/25/2017

4/26/2017
Responible :
PT. CHEVRON PACIFIC INDONESIA 4/27/2017
Signature,
4/30/2017

Name :
Badge :
Date :
SUMMARY ACTIVITY

JOB TITTLE SPECIALIST RELAY


NAME MUCHAMAD YANUAR EFENDI
PERIODE Apr-18

NO COST CENTER NO JDE WORK ORDER DESCRIPTION WORK AREA

1 Function Test Recloser EX38BD18 and 41AW62 Warehouse Duri Camp

2 Maintenance GCB 31 North Duri Substation

3 Troubleshoot Recloser 28AS09 Puncak Grid


4 Troubleshoot Cable Control for TX3 Duri Ring Bus
5 Troubleshoot Cable Control for TX3 & Callibration Relay 51Y (6) Duri Ring Bus
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
TOTAL

PT. INDOKOMAS BUANA PERKASA


Signature,

Date :
22 1.000 94,266,000 94,266,000
1 0.045 4,284,818

WORK % Alocation / ACTUAL PRICE REMARKS DATE


DAY Month
4/2/2017

4/3/2017

4/4/2017
4/7/2017
4/8/2017
4/9/2017
4/10/2017
4/11/2017
4/12/2017
4/13/2017
4/16/2017
4/17/2017
4/18/2017
4/19/2017
4/20/2017
4/23/2017
4/24/2017
4/25/2017
4/26/2017
4/27/2017
4/30/2017

Responible :
PT. CHEVRON PACIFIC INDONESIA
Signature,

Name :
Badge :
Date :