Sei sulla pagina 1di 7

Fuel Consumption OWNING &

OPERATING COSTS
Construction
(3) Hydraulic excavators
Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
PC20MR-2 0.21 ~ 0.29 0.8 ~ 1.1 0.29 ~ 0.45 1.1 ~ 1.7 0.45 ~ 0.77 1.7 ~ 2.9
PC27MR-2 0.29 ~ 0.42 1.1 ~ 1.6 0.42 ~ 0.61 1.6 ~ 2.3 0.61 ~ 1.03 2.3 ~ 3.9
PC30MR-2 0.34 ~ 0.48 1.3 ~ 1.8 0.48 ~ 0.74 1.8 ~ 2.8 0.74 ~ 1.22 2.8 ~ 4.6
PC35MR-2 0.37 ~ 0.50 1.4 ~ 1.9 0.50 ~ 0.77 1.9 ~ 2.9 0.77 ~ 1.29 2.9 ~ 4.9
PC40MR-2 0.58 ~ 0.82 2.2 ~ 3.1 0.82 ~ 1.24 3.1 ~ 4.7 1.24 ~ 2.06 4.7 ~ 7.8
PC50MR-2 0.50 ~ 0.71 1.9 ~ 2.7 0.71 ~ 1.08 2.7 ~ 4.1 1.08 ~ 1.80 4.1 ~ 6.8
PC78US-6, PC78MR-6 0.63 ~ 0.90 2.4 ~ 3.4 0.90 ~ 1.4 3.4 ~ 5.2 1.4 ~ 2.3 5.2 ~ 8.6
PC120-6, PC130-6 1.1 ~ 1.6 4.1 ~ 5.9 1.6 ~ 2.3 5.9 ~ 8.8 2.3 ~ 3.9 8.8 ~ 14.6
PC130-7 1.1 ~ 1.6 4.1 ~ 5.9 1.6 ~ 2.3 5.9 ~ 8.8 2.3 ~ 3.9 8.8 ~ 14.6
PC138US-2, PC138USLC-2 1.1 ~ 1.6 4.1 ~ 5.9 1.6 ~ 2.3 5.9 ~ 8.8 2.3 ~ 3.9 8.8 ~ 14.6
PC160LC-7 1.2 ~ 1.8 4.7 ~ 6.8 1.8 ~ 2.7 6.8 ~ 10.1 2.7 ~ 4.5 10.1 ~ 16.9
PC200, LC-7 1.6 ~ 2.4 6.2 ~ 8.9 2.4 ~ 3.5 8.9 ~ 13.4 3.5 ~ 5.9 13.4 ~ 22.3
PC200, LC-8 1.7 ~ 2.4 6.4 ~ 9.1 2.4 ~ 3.6 9.1 ~ 13.7 3.6 ~ 6.0 13.7 ~ 22.8
PC220, LC-7 2.0 ~ 2.9 7.5 ~ 10.8 2.9 ~ 4.3 10.8 ~ 16.2 4.3 ~ 7.1 16.2 ~ 26.9
PC220, LC-8 1.9 ~ 2.7 7.3 ~ 10.4 2.7 ~ 4.1 10.4 ~ 15.6 4.1 ~ 6.9 15.6 ~ 26.0
PC228US, USLC-3E0 1.7 ~ 2.4 6.3 ~ 9.0 2.4 ~ 3.6 9.0 ~ 13.5 3.6 ~ 5.9 13.5 ~ 22.5
PC240LC,NLC-8 1.9 ~ 2.7 7.3 ~ 10.4 2.7 ~ 4.1 10.4 ~ 15.6 4.1 ~ 6.9 15.6 ~ 26.0
PC270, LC-7 2.1 ~ 3.1 8.1 ~ 11.6 3.1 ~ 4.6 11.6 ~ 17.4 4.6 ~ 7.7 17.4 ~ 29.0
PC270, LC-8 2.1 ~ 3.1 8.1 ~ 11.6 3.1 ~ 4.6 11.6 ~ 17.4 4.6 ~ 7.6 17.4 ~ 28.9
PC300, LC-7, PC350, LC-7 2.9 ~ 4.1 10.8 ~ 15.4 4.1 ~ 6.1 15.4 ~ 23.1 6.1 ~ 10.2 23.1 ~ 38.5
PC300, LC-7E0, PC350, 2.8 ~ 4.0 10.6 ~ 15.2 4.0 ~ 6.0 15.2 ~ 22.8 6.0 ~ 10.0 22.8 ~ 37.9
LC-7E0
PC400, LC-7, PC450LC-7 5.1 ~ 6.8 19.3 ~ 25.7 6.8 ~ 8.5 25.7 ~ 32.1 8.5 ~ 12.7 32.1 ~ 48.2
PC400, LC-7E0, PC450, 5.3 ~ 7.1 20.1 ~ 26.8 7.1 ~ 8.9 26.8 ~ 33.5 8.9 ~ 13.3 33.5 ~ 50.2
LC-7E0
PC600, LC-7 6.2 ~ 8.2 23.4 ~ 31.2 8.2 ~ 10.3 31.2 ~ 39.0 10.3 ~ 16.5 39.0 ~ 62.4
PC600, LC-8 6.9 ~ 9.2 26.1 ~ 34.8 9.2 ~ 11.5 34.8 ~ 43.5 11.5 ~ 18.4 43.5 ~ 69.6
PC750, LC, SE-7, PC800, SE-7 6.7 ~ 9.0 25.6 ~ 34.1 9.0 ~ 11.3 34.1 ~ 42.6 11.3 ~ 18.0 42.6 ~ 68.2
PC800, LC, SE-8, PC850, SE-8 6.7 ~ 8.9 25.2 ~ 33.7 8.9 ~ 11.1 33.7 ~ 42.1 11.1 ~ 17.8 42.1 ~ 67.3
PC1250, LC, SP-7 9.5 ~ 12.7 36.0 ~ 48.0 12.7 ~ 15.8 48.0 ~ 59.9 15.8 ~ 25.3 59.9 ~ 95.9
PC1250, LC, SP-8 10.5 ~ 14.1 39.9 ~ 53.2 14.1 ~ 17.6 53.2 ~ 66.5 17.6 ~ 28.1 66.5 ~ 106.5
PC1800-6 13.2 ~ 17.5 49.8 ~ 66.4 17.5 ~ 21.9 66.4 ~ 83.0 21.9 ~ 35.1 83.0 ~ 132.9
Low: Intermittent work with job efficiency less than 65 %.
Material; Easy to excavate
Medium: Digging and loading 65 - 80 % of machine operation hours.
Material; Not easy to excavate
High: Work with job effficiency more than 80 %.
Direct excavation needed sometimes.

Fuel consumption ltr./hr (U.S. Gal/hr)


Model Easy Average Rather difficult Difficult
PC3000-6 161 (42.5) 172 (45.4) 184 (48.6) 208 (55.0)
PC4000-6 228 (60.2) 244 (64.5) 260 (68.7) 293 (77.4)
PC5000-6 306 (80.8) 328 (86.7) 350 (92.5) 393 (103.8)
PC8000-6 515 (136.1) 552 (145.8) 589 (37.9) 662 (174.9)

16-11
Fuel Consumption OWNING &
OPERATING COSTS
Construction
(4) Off-highway dump trucks
Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
HD255-5 3.4 ~ 5.0 12.7 ~ 19.0 5.0~ 6.7 19.0 ~ 25.4 6.7 ~ 9.2 25.4 ~ 34.9
HD325-6 5.2 ~ 7.7 19.5 ~ 29.2 7.7 ~ 10.3 29.2 ~ 39.0 10.3 ~ 14.2 39.0 ~ 53.6
HD325-7 5.2 ~ 7.7 19.5 ~ 29.2 7.7 ~ 10.3 29.2 ~ 38.9 10.3 ~ 14.1 38.9 ~ 53.5
HD405-6 5.2 ~ 7.7 19.5 ~ 29.2 7.7 ~ 10.3 29.2 ~ 39.0 10.3 ~ 14.2 39.0 ~ 53.6
HD405-7 5.2 ~ 7.7 19.5 ~ 29.2 7.7 ~ 10.3 29.2 ~ 38.9 10.3 ~ 14.1 38.9 ~ 53.5
HD465-7 7.3 ~ 11.0 27.8 ~ 41.6 11.0 ~ 14.7 41.6 ~ 55.5 14.7 ~ 20.2 55.5 ~ 76.4
HD465-7E0 7.7 ~ 11.5 29.0 ~ 43.6 11.5 ~ 15.4 43.6 ~ 58.1 15.4 ~ 21.1 58.1 ~ 79.9
HD605-7 7.3 ~ 11.0 27.8 ~ 41.6 11.0 ~ 14.7 41.6 ~ 55.5 14.7 ~ 20.2 55.5 ~ 76.4
HD605-7E0 7.7 ~ 11.5 29.0 ~ 43.6 11.5 ~ 15.4 43.6 ~ 58.1 15.4 ~ 21.1 58.1 ~ 79.9
HD785-5 10.4 ~ 15.6 39.4 ~ 59.2 15.6 ~ 20.8 59.2 ~ 78.9 20.8 ~ 28.7 78.9 ~ 108.5
HD985-5 11.9 ~ 17.9 45.2 ~ 67.8 17.9 ~ 23.9 67.8 ~ 90.3 23.9 ~ 32.8 90.3 ~ 124.2
HD1500-5 13.7 ~ 17.1 51.8 ~ 64.7 17.1 ~ 23.9 64.7 ~ 90.6 23.9 ~ 32.8 90.6 ~ 124.3
730E 19.3 ~ 24.2 73.2 ~ 91.5 24.2 ~ 33.7 91.5 ~ 127.6 33.7 ~ 46.2 127.6 ~ 175.0
830E 24.5 ~ 30.6 92.7 ~ 115.9 30.6 ~ 42.8 115.9 ~ 162.2 42.8 ~ 58.8 162.2 ~ 222.5
930E-3 24.9 ~ 31.1 94.1 ~ 117.6 31.1 ~ 43.5 117.6 ~ 164.7 43.5 ~ 59.7 164.7 ~ 225.8
CONDITIONS:
Low : High ratio of loading time to cycle time, good haul road conditions.
Low truck job efficiency.
Medium : Medium raio of traveling time to cycle time, medium load factor of truck, and medium haul road
conditions and grade.
Total resistance; Over 2 % through 10 %.
High : High raio of traveling time to cycle time, tough load factor of truck, severe haul road conditions
and grade.
Total resistance; 10 % and above.

(5) Articulated dump trucks


Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
HM300-1 3.4 ~ 5.1 12.8 ~ 19.3 5.1 ~ 6.8 19.3 ~ 25.7 6.8 ~ 9.3 25.7 ~35.3
HM300-2 3.5 ~ 5.2 13.1 ~ 19.7 5.2 ~ 6.9 19.7 ~ 26.2 6.9 ~ 9.5 26.2 ~ 36.1
HM350-1 4.1 ~ 6.1 15.4 ~ 23.1 6.1 ~ 8.1 23.1 ~ 30.8 8.1 ~ 11.2 30.8 ~ 42.3
HM350-2 4.4 ~ 6.5 16.5 ~ 24.7 6.5 ~ 8.7 24.7 ~ 33.0 8.7 ~ 12.0 33.0 ~ 45.4
HM400-1 4.5 ~ 6.7 17.0 ~ 25.5 6.7 ~ 9.0 25.5 ~ 34.0 9.0 ~ 12.4 34.0 ~ 46.8
HM400-2 4.6 ~ 7.0 17.6 ~ 26.4 7.0 ~ 9.3 26.4 ~ 35.2 9.3 ~ 12.8 35.2 ~ 48.3
CONDITIONS:
Low : Long loading time, downhill travel with load, travel on well maintained road.
Medium : Normal loading time , uphill travel with load (normal grade), travel on well maintained road.
High : Short loading time, uphill travel with load (steep grade), travel on normally maintained road.

16-12
Fuel Consumption OWNING &
OPERATING COSTS
Construction
(6) Wheel loaders
Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
WA150-5 1.3 ~ 1.8 4.9 ~ 6.9 1.8 ~ 2.3 6.9 ~ 8.7 2.3 ~ 3.0 8.7 ~ 11.4
WA200, PT-5 1.7 ~ 2.4 6.5 ~ 9.1 2.4 ~ 3.0 9.1 ~ 11.4 3.0 ~ 4.0 11.4 ~ 15.1
WA250, PT-5 1.9 ~ 2.7 7.2 ~ 10.1 2.7 ~ 3.4 10.1 ~ 12.7 3.4 ~ 4.4 12.7 ~ 16.7
WA320-5 2.3 ~ 3.2 8.7 ~ 12.1 3.2 ~ 4.0 12.1 ~ 15.3 4.0 ~ 5.3 15.3 ~ 20.1
WA320 custom 2.2 ~ 3.0 8.2 ~ 11.4 3.0 ~ 3.8 11.4 ~ 14.4 3.8 ~ 5.0 14.4 ~ 18.9
WA380-3 2.4 ~ 3.4 9.1 ~ 12.7 3.4 ~ 4.2 12.7 ~ 16.0 4.2 ~ 5.5 16.0 ~ 21.0
WA380-5 2.7 ~ 3.8 10.1 ~ 14.2 3.8 ~ 4.7 14.2 ~ 17.8 4.7 ~ 6.2 17.8 ~ 23.5
WA380-6 2.5 ~ 3.5 9.5 ~ 13.3 3.5 ~ 4.4 13.3 ~ 16.7 4.4 ~ 5.8 16.7 ~ 22.1
WA420-3 3.1 ~ 4.3 11.7 ~ 16.3 4.3 ~ 5.4 16.3 ~ 20.5 5.4 ~ 7.2 20.5 ~ 27.1
WA430-5 3.1 ~ 4.3 11.7 ~ 16.3 4.3 ~ 5.4 16.3 ~ 20.5 5.4 ~ 7.2 20.5 ~ 27.1
WA470-3 3.5 ~ 5.0 13.4 ~ 18.8 5.0 ~ 6.2 18.8 ~ 23.6 6.2 ~ 8.2 23.6 ~ 31.1
WA470-5 3.5 ~ 4.8 13.1 ~ 18.3 4.8 ~ 6.1 18.3 ~ 23.0 6.1 ~ 8.0 23.0 ~ 30.3
WA480-5 3.6 ~ 5.0 13.6 ~ 19.0 5.0 ~ 6.3 19.0 ~ 23.9 6.3 ~ 8.3 23.9 ~ 31.5
WA500-3 5.5 ~ 7.7 20.9 ~ 29.2 7.7 ~ 9.7 29.2 ~ 36.8 9.7 ~ 12.9 36.8 ~ 48.7
WA500-6 5.2 ~ 7.3 19.6 ~ 27.5 7.3 ~ 9.2 27.5 ~ 34.7 9.2 ~ 12.1 34.7 ~ 45.8
WA600-3 8.0 ~ 11.1 30.1 ~ 42.2 11.1 ~ 14.1 42.2 ~ 53.2 14.1 ~ 18.6 53.2 ~ 70.3
WA600-6 8.6 ~ 14.5 32.6 ~ 45.7 12.1 ~ 15.2 45.7 ~ 57.6 15.2 ~ 20.1 57.6 ~ 76.1
WA700-3 10.3 ~ 14.5 39.1 ~ 54.8 14.5 ~ 18.3 54.8 ~ 69.1 18.3 ~ 24.1 69.1 ~ 91.3
WA800-3 11.8 ~ 16.5 44.6 ~ 62.5 16.5 ~ 20.8 62.5 ~ 78.9 20.8 ~ 27.5 78.9 ~ 104.2
WA900-3 12.3 ~ 17.2 46.5 ~ 65.1 17.2 ~ 21.7 65.1 ~ 82.1 21.7 ~ 28.7 82.1 ~ 108.5
WA1200-3 26.4 ~ 37.0 100.1 ~ 140.1 37.0 ~ 46.7 140.1 ~ 176.8 46.7 ~ 61.7 176.8 ~ 233.5
CONDITIONS:
Low : Light utility, work with considerable amount of idling.
Medium : Non-stop operation over a long distance.
Operation according to a basic loader cycle with frequent idling.
High : Non-stop operation according to a basic loader cycle.

(7) Wheel dozers


Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
WD600-3 8.6 ~ 12.0 32.4 ~ 45.3 12.0 ~ 15.1 45.3 ~ 57.2 15.1 ~ 19.9 57.2 ~ 75.5
WD900-3 13.5 ~ 18.9 51.2 ~ 71.7 18.9 ~ 23.9 71.7 ~ 90.5 23.9 ~ 31.6 90.5 ~ 119.5
CONDITIONS:
Low : Work where machine spend most of operation hours idling or traveling with no load.
Medium : Average earth moving, scraper hauling, easy pushing.
High : Heavy pushing.
Continuous operation.

16-13
Fuel Consumption OWNING &
OPERATING COSTS
Construction
(8) Motor graders
Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
GD511A-1 1.9 ~ 3.1 7.2 ~ 11.6 3.1 ~ 4.2 11.6 ~ 15.9 4.2 ~ 5.4 15.9 ~ 20.3
GD555-3A, 3C 2.3 ~ 3.7 8.8 ~ 14.0 3.7 ~ 5.1 14.0 ~ 19.3 5.1 ~ 6.5 19.3 ~ 24.6
GD611A-1 2.4 ~ 3.8 9.0 ~ 14.5 3.8 ~ 5.3 14.5 ~ 19.9 5.3 ~ 6.7 19.9 ~ 25.3
GD655-3A, 3C 2.7 ~ 4.4 10.4 ~ 16.6 4.4 ~ 6.0 16.6 ~ 22.8 6.0 ~ 7.7 22.8 ~ 29.1
GD661A-1 2.5 ~ 4.1 9.6 ~ 15.4 4.1 ~ 5.6 15.4 ~ 21.2 5.6 ~ 7.1 21.2 ~ 26.9
GD675-3A, 3C 2.9 ~ 4.5 10.8 ~ 17.2 4.5 ~ 6.3 17.2 ~ 23.7 6.3 ~ 8.0 23.7 ~ 30.1
GD705A-4 2.8 ~ 4.4 10.5 ~ 16.8 4.4 ~ 6.1 16.8 ~ 23.1 6.1 ~ 7.8 23.1 ~ 29.4
GD825A-2 3.9 ~ 6.3 14.9 ~ 23.8 6.3 ~ 8.6 23.8 ~ 32.7 8.6 ~ 11.0 32.7 ~ 41.7
CONDITIONS:
Low: Minor road maintenance, leveling, traveling with no load.
Medium: Average road maintenance, scarifying, light snow removal.
High: Heavy pushing, continuous operation.

16-14
Fuel Consumption OWNING &
OPERATING COSTS
Table 3 Hourly Fuel Consumption
Mining
(1) Bulldozers
Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
D275A, AX-5 9.3 ~ 12.8 35.2 ~ 48.5 12.8 ~ 17.5 48.5 ~ 66.2 17.5 ~ 21.0 66.2 ~ 79.4
D275A, AX-5E0 9.5 ~ 12.8 35.8 ~ 48.3 12.8 ~ 17.5 48.3 ~ 66.2 17.5 ~ 20.8 66.2 ~ 78.8
D375A-5, -5E0 12.8 ~ 17.7 48.6 ~ 66.9 17.7 ~ 24.1 66.9 ~ 91.2 24.1 ~ 28.9 91.2 ~ 109.4
D475A-5, -5SD 18.0 ~ 24.7 68.0 ~ 93.5 24.7 ~ 33.7 93.5 ~ 127.5 33.7 ~ 40.4 127.5 ~ 153.0
D475A-5E0, ASD-5E0 18.0 ~ 24.7 68.0 ~ 93.5 24.7 ~ 33.7 93.5 ~ 127.5 33.7 ~ 40.4 127.5 ~ 153.0
D575A-3SD 24.0 ~ 33.1 91.0 ~ 125.2 33.1 ~ 45.1 125.2 ~ 170.7 45.1 ~ 54.1 170.7 ~ 204.8
CONDITIONS:
Low : Machine movement is mainly consisting of idle running or traveling unloaded.
Medium : Average earth moving, scraper hauling or easy pushing operation.
Ripping ratio more than 50%.
High : Ripping, heavy pushing, and operation continued without rest at full horspower.

(2) Hydraulic excavators


Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
PC1250, LC, SP-7 9.9 ~ 14.9 37.6 ~ 56.3 14.9 ~ 19.8 56.3 ~ 75.1 19.8 ~ 26.5 75.1 ~ 100.2
PC1250, LC, SP-8 10.1 ~ 14.7 38.1 ~ 55.8 14.7 ~ 19.8 55.8 ~ 74.9 19.8 ~ 26.4 74.9 ~ 100.1
PC1800-6 13.8 ~ 20.8 52.4 ~ 78.7 20.8 ~ 27.7 78.7 ~ 104.9 27.7 ~ 36.9 104.9 ~ 139.8
CONDITIONS:
Low : Digging account for less than 50% in daily working hours.
Loading of low density materials. Unnecessary for big digging force.
Medium : Digging account for 60-85% in daily working hours.
After blasting or after dozing. Small rock suitable for the bucket size.
High : Digging account for more than 85% in daily work hours. Direct digging.
Heavy duty digging after blasting.

Fuel consumption ltr./hr (U.S. Gal/hr)


Model Easy Average Rather difficult Difficult
PC3000-6 161 (42.5) 172 (45.4) 184 (48.6) 208 (55.0)
PC4000-6 228 (60.2) 244 (64.5) 260 (68.7) 293 (77.4)
PC5000-6 306 (80.8) 328 (86.7) 350 (92.5) 393 (103.8)
PC8000-6 515 (136.1) 552 (145.8) 589 (37.9) 662 (174.9)

16-15
Fuel Consumption OWNING &
OPERATING COSTS
Mining
(3) Off-highway dump trucks
Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
HD785-5 10.4 ~ 18.2 39.4 ~ 69.0 18.2 ~ 23.4 69.0 ~ 88.7 23.4 ~ 30.2 88.7 ~ 114.4
HD1500-5 13.7 ~ 17.1 51.8 ~ 64.7 17.1 ~ 23.9 64.7 ~ 90.6 23.9 ~ 32.8 90.6 ~ 124.3
730E 19.3 ~ 24.2 73.2 ~ 91.5 24.2 ~ 33.8 91.5 ~ 128.0 33.8 ~ 46.4 128.0 ~ 175.6
830E 24.5 ~ 30.6 92.7 ~ 115.9 30.6 ~ 42.9 115.9 ~ 162.2 42.9 ~ 58.8 162.2 ~ 222.4
830E-AC 24.5 ~ 30.6 92.7 ~ 115.9 30.6 ~ 42.9 115.9 ~ 162.2 42.9 ~ 58.8 162.2 ~ 222.4
930E-3 24.9 ~ 31.1 94.1 ~ 117.6 31.1 ~ 43.5 117.6 ~ 164.7 43.5 ~ 59.7 164.7 ~ 225.8
CONDITIONS:
Low : Variable travel times with the majority of the travel time attributed to segments with total
resistance less than 4%. Abnormal operating efficiency with significant periods of wait time or
delays.
Medium : Average travel times with a balance between travel time along routes in excess of 10% total
resistance and routes less than 4% in total resistance. Normal operating efficiency with
occasional periods of wait time or delays.
High : Long travel times with the majority of the travel time attributed to road segments in excess of
10% total resistance. Highly efficient applications with minimum delay or wait periods.

(4) Wheel loaders


Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
WA800-3 12.5 ~ 17.5 47.4 ~ 66.4 17.5 ~ 22.1 66.4 ~ 83.7 22.1 ~ 33.4 83.7 ~ 126.4
WA900-3 12.9 ~ 18.1 48.9 ~ 68.5 18.1 ~ 22.8 68.5 ~ 86.4 22.8 ~ 34.5 86.4 ~ 130.5
WA1200-3 26.4 ~ 44.1 100.0 ~ 166.8 44.1 ~ 57.3 166.8 ~ 216.8 57.3 ~ 74.9 216.8 ~ 283.5
CONDITIONS:
Low : Low production aggregate truck loading, large amount of idling time.
Medium : Loading to stock-pile dump trucks. Short time waiting hours for dump trucks.
High : Continuous loading. Short time waiting hours for dump trucks.
Digging hard bank. Takes a lot of time for digging.
Load and carry operation with high productivity.

16-16
Fuel Consumption OWNING &
OPERATING COSTS
Mining
(5) Wheel dozers
Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
WD600-3 9.2 ~ 12.9 34.8 ~ 48.8 12.9 ~ 16.2 48.8 ~ 61.5 16.2 ~ 21.6 61.5 ~ 81.7
WD900-3 13.9 ~ 19.5 52.7 ~ 73.8 19.5 ~ 24.6 73.8 ~ 93.1 24.0 ~ 32.5 93.1 ~ 122.9
CONDITIONS:
Low : Cleaning a surface of a hauling road, ground around large shovels and hoppers (collecting fallen
stones).
Medium : Stock pilling. Dozing of crushing rock.
High : Reclamation. Dozing after digging. Pusher using scraper.

(6) Motor graders


Range Low Medium High
Amount U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr U.S. Gal/hr ltr./hr
Machine
GD825A-2 4.0 ~ 6.5 15.3 ~ 24.5 6.5 ~ 8.9 24.5 ~ 33.7 8.9 ~ 11.3 33.7 ~ 42.9
CONDITIONS:
Low : Traveling. Finishing. Grading of light materials.
Medium : Light duty road maintenance. Scarifing.
High : Ripping. Heavy duty road maintenance.

16-17