1. Scope
This specification describes Ball-Eye to be built in accordance with Section 2 Reference
Publications except where specific requirements of this specification shall take precedence.

2. Reference Publications
Reference is made in this specification to the following standards, the latest issues, amendments,
and supplements of which shall apply:

2.1 CSA Standards


C83-96 (R2011) – Communication and Power Line Hardware
C83.39-96 (2011) – Ball-Eye
C83.133-96(R2011) – Oval-Eye Ball
C411.1-10 – AC Suspension Insulators
G40.20-13/G40.21-13 – General Requirements for Rolled or Welded Structural Quality
steel / Structural Quality Steel
G164-M92 (R2003) – Hot-Dipped Galvanizing of Irregularly Shaped Articles

2.2 Other Standards


ASTM A143/A143M-07 – Standard Practice for Safeguarding Against Embrittlement of
Hot-Dip Galvanized Structural Steel Products and Procedure for Detecting Embrittlement
ASTM A370-12a – Standard Test Methods and Definitions for Mechanical Testing of
Steel Products

3. Requirements

3.1 General
The Ball-Eye shall be in accordance with CSA C83.39 Number 1 Hardware Type “B/J”.
An Oval-Eye Ball is also acceptable and shall be in accordance with CSA C83.133
Number 1 Hardware Type “CS-5”. The item shall be galvanized steel as per CSA G164.

THESE SASKPOWER DOCUMENTS ARE THE SOLE AND EXCLUSIVE PROPERTY OF SASKPOWER. SASKPOWER HAS PREPARED THESE DOCUMENTS FOR INTERNAL USE ONLY AND
EXTERNAL USE OF, OR RELIANCE ON, IS PROHIBITED. ANY PERSON RECEIVING THESE DOCUMENTS SHALL NOT USE, RELY UPON OR DISCLOSE THEM, IN WHOLE OR IN PART,
EXCEPT FOR THE PURPOSE OF PERFORMING SERVICES FOR SASKPOWER AND WITH THE PRIOR WRITTEN CONSENT OF SASKPOWER. RECEIPT OF THESE DOCUMENTS IN WHOLE
OR PART BY ANY PERSON SHALL NOT BE CONSTRUED TO MEAN PERMISSION TO USE THE SAME. SASKPOWER SHALL NOT BE HELD LIABLE TO/BY ANY PERSON FOR INJURY,
LOSS OR DAMAGE ARISING OUT OF THE USE OF, OR RELIANCE ON, THESE DOCUMENTS, IN WHOLE OR IN PART.
Page 2 of 3

LS-2000 May 14, 2014

3.1.1 Energy Absorption


The steel used shall meet Level 1 (energy absorption) as per clause 6.2.4.1 of
CSA C83. Level 1 material will provide a minimum energy absorption of 20
Joules at -20˚C for three standard Charpy V-notch bars tested in accordance with
CSA G40.20/G40.21. Energy absorption test samples shall be taken from the
finished product after all heat and mechanical treatments. Test results shall be
included with the certified test reports.

3.1.2 Charpy V-notch Impact Test


Charpy V-notch impact tests shall be conducted in accordance with the procedure
defined in ASTM A370. The material shall meet the requirements of Level 1 as
outlined in CSA C83.

3.1.3 Ultimate Tensile Strength


To avoid hydrogen embrittlement, the ultimate tensile strength shall not exceed
1000 MPa (145 ksi). It is preferable that the tensile test be taken to rupture in
order to determine UTS. However, it is sufficient to perform a hardness test
where the pass criterion would be HRC < 32. Rockwell hardness tests shall be
conducted in accordance with the procedure defined in ASTM A370.

3.2 Mechanical Strength


Item Code Hardware Type Yield Load, kN Ultimate Load, kN
1 32 04 (Ball-Eye) B/J 90 135 minimum
1 32 04 (Oval-Eye CS-5 102 138 minimum
Ball)

3.3 Marking
Item shall be permanently marked “B/J” for a Ball-Eye. Oval-Eye Ball shall be
permanently marked “CS-5”.

4. Packaging
The Ball-Eye shall be shipped with 50 per steel banded wooden box. The outside of each
package shall be legibly marked with:
a) purchase order number,
b) name of manufacturer and/or supplier,
c) product description,
d) quantity,
e) date of manufacture, and
f) SaskPower stock code number.

Alternate packaging requires prior approval before shipping.

THESE SASKPOWER DOCUMENTS ARE THE SOLE AND EXCLUSIVE PROPERTY OF SASKPOWER. SASKPOWER HAS PREPARED THESE DOCUMENTS FOR INTERNAL USE ONLY AND
EXTERNAL USE OF, OR RELIANCE ON, IS PROHIBITED. ANY PERSON RECEIVING THESE DOCUMENTS SHALL NOT USE, RELY UPON OR DISCLOSE THEM, IN WHOLE OR IN PART,
EXCEPT FOR THE PURPOSE OF PERFORMING SERVICES FOR SASKPOWER AND WITH THE PRIOR WRITTEN CONSENT OF SASKPOWER. RECEIPT OF THESE DOCUMENTS IN WHOLE
OR PART BY ANY PERSON SHALL NOT BE CONSTRUED TO MEAN PERMISSION TO USE THE SAME. SASKPOWER SHALL NOT BE HELD LIABLE TO/BY ANY PERSON FOR INJURY,
LOSS OR DAMAGE ARISING OUT OF THE USE OF, OR RELIANCE ON, THESE DOCUMENTS, IN WHOLE OR IN PART.
Page 3 of 3

LS-2000 May 14, 2014

5. Inspection
All shipments of Ball-Eye are subject to inspection by SaskPower when they are received.
Acceptance will be based on the requirements of this specification.

6. Rejection
Failure of a representative sample of any shipment to meet requirements of this specification
shall be the basis for rejection of the shipment. SaskPower will have the discretion to determine
the sample size to be inspected for such purposes.

7. Manufacturer Supplied Specification Drawings


Prior to shipment of all materials, detailed Specifications Drawings showing dimensions,
mechanical strength and all other specified requirements shall be submitted to SaskPower for
approval.

THESE SASKPOWER DOCUMENTS ARE THE SOLE AND EXCLUSIVE PROPERTY OF SASKPOWER. SASKPOWER HAS PREPARED THESE DOCUMENTS FOR INTERNAL USE ONLY AND
EXTERNAL USE OF, OR RELIANCE ON, IS PROHIBITED. ANY PERSON RECEIVING THESE DOCUMENTS SHALL NOT USE, RELY UPON OR DISCLOSE THEM, IN WHOLE OR IN PART,
EXCEPT FOR THE PURPOSE OF PERFORMING SERVICES FOR SASKPOWER AND WITH THE PRIOR WRITTEN CONSENT OF SASKPOWER. RECEIPT OF THESE DOCUMENTS IN WHOLE
OR PART BY ANY PERSON SHALL NOT BE CONSTRUED TO MEAN PERMISSION TO USE THE SAME. SASKPOWER SHALL NOT BE HELD LIABLE TO/BY ANY PERSON FOR INJURY,
LOSS OR DAMAGE ARISING OUT OF THE USE OF, OR RELIANCE ON, THESE DOCUMENTS, IN WHOLE OR IN PART.

Potrebbero piacerti anche