Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
RAILWAY
1. Railway Rolling Stock - Answer (click here)
2. Railway Station Planning - Answer (click here)
3. The Evolution of Steam Motive Power - Answer (click here)
4. The Advent and Development of Electric Traction - Answer (click here)
5. Diesel Traction - Answer (click here)
6. Evolution of Wheel Layout - Answer (click here)
7. Changes in Locomotive Maintenance Practices - Answer (click here)
8. Railway Sleeper Functions - Answer (click here)
9. Train Performance Issues on Metros and Light Rail - Answer (click here)
10. Freight Rolling Stock - Answer (click here)
11. Specialised Engineering Rolling Stock - Answer (click here)
12. Materials for Track Ballast - Answer (click here)
13. Prestressed Concrete Sleepers (Monobloc) - Answer (click here)
14. Rail Fastenings, Baseplates and Pads - Answer (click here)
15. Rails - Answer (click here)
16. Rail Wear - Answer (click here)
17. Desirability of Removing Rail Joints - Answer (click here)
18. The Introduction of Track Welding - Answer (click here)
19. Shop Welding to Produce Long Rails - Answer (click here)
20. Site Welding to Produce CWR - Answer (click here)
AIRPORT PLANNING
1. Airport Planning: Introduction - Answer (click here)
2. The Airport System Plan - Answer (click here)
3. Airport Site Selection - Answer (click here)
4. The Airport Master Plan - Answer (click here)
5. The Airport Project Plan - Answer (click here)
6. Airport Planning: Land Use Planning - Answer (click here)
7. Airport Planning: Environmental Impact Assessment - Answer (click here)
8. Airport Planning: Economic and Financial Feasibility - Answer (click here)
9. Airport Classification - Answer (click here)
10. Utility Airports and Transport Airports - Answer (click here)
11. Airport Planning: Runways - Answer (click here)
12. Airport Planning: Runways - The Wind Rose - Answer (click here)
13. Estimating Runway Length - Answer (click here)
14. Runway System Geometric Specifications - Answer (click here)
15. Parallel Runway System Spacing - Answer (click here)
16. Airport Planning: Sight Distance and Longitudinal Profile - Answer (click
here)
17. Airport Planning: Transverse Gradient - Answer (click here)
18. Taxiways and Taxilanes - Answer (click here)
19. Exit Taxiway Geometry and Location of Exit Taxiways - Answer (click
here)
AIRPORT DESIGN
1. Airport: The Requirements for Visual Aids - Answer (click here)
2. The Airport Beacon - Answer (click here)
3. The Aircraft Landing Operation - Answer (click here)
4. Airport: Visual Approach Slope Indicator - Answer (click here)
5. Airport: Runway Lighting - Answer (click here)
6. Airport: Taxiway Lighting - Answer (click here)
7. Runway and Taxiway Marking - Answer (click here)
HARBOUR ENGINEERING
1. harbors: Loading and Unloading Facilities - Answer (click here)
2. harbors: Tank Vessels - Answer (click here)
3. harbors: Loading and Unloading Operations - Answer (click here)
4. Harbors: Loading Factors - Answer (click here)
5. Harbors: Preliminary Procedures before a ship is loaded or unloaded -
Answer (click here)
6. Harbors: Preparing Waterfront Operations Log Sheet - Answer (click here)
7. Harbors: Fire And Safety Precautions - Answer (click here)
8. Harbors: Spills - Answer (click here)
9. Safe Handling of Jet Fuel and Kerosene - Answer (click here)
10. Harbors: Loading Procedures - Answer (click here)
11. Harbors: Unloading Procedures - Answer (click here)