Sr no Procedure Description
1 MOBILE Request for Heavy Equipment requirement Annexure -1
2 CRANE Operator’s Daily check list Annexure -2
3 SAFETY Equipment Handling Checklist/Permit Annexure -3
4 PREVENTIVE MAINTENANCE CHECK LIST Annexure -4
CRANE
5 Annexure -5
Annual crane check list by third party
6 Annexure -6
Checklist For Hired Crane
7 Annexure -7
Load charts of RIL Cranes
8 Annexure -8
Check list for maintenance for lifting tools for
9 Annexure -9
Guidance for use of “Site Inspection before
lift”
ANNEXURE 1
Reliance
Industries Limited
Hazira Manufacturing Division
Request for Heavy Equipment requirement
Plant: Department:
Priority: Engg in-charge:
Reliance
Industries Limited
Hazira Manufacturing Division
Date
3 Service alternator
Reliance
Industries Limited
Hazira Manufacturing Division
Operating crew:
Name of the Operator: Driving License No: Optr.'s Fitness:
Work Experience: Equipment Operated:
Name of the Operator: Driving License No: Optr.'s Fitness:
Work Experience: yrs. Equipment Operated:
Boom
Type: Telescopic / Fixed / Lattice: Telescopic
Boom Length: Basic: Full Extension: Intermediate Sections:
Jib: Type : Length:
General Condition of Boom:
Condition of Sheaves: Boom tip: Condition of Guides/Pins etc. :
Hook block: Standard / Local Safety Latch: Cap.:
Condition of Main Hoist Winch: Condition of Aux. Winch:
Brakes: Hoist: Slew: Vehicle brake: Hand brake:
Wire rope:
Main hoist Boom Suspension
LOAD TEST
Rated load ………... Kg, Boom Length ………….Ft / Mtr, Angle…..*, Radius…...Ft / Mtr, (AS PER LOAD CHART)
Actual Load (including Hook+ Lifting tackles) ……….Kg, % of Loading ………….,
Creeping Rate @ ………..mm/15 min
Signature of Hiring agency representative for carrying load test on over load:
Overload test: Tonnes Creeping Rate in mm/hr: Radius: Angle:
Weight(in SLI ) Radius(in SLI) Boom Length(in SLI) Angle(in SLI):
Limit Switch: Boom Hoist Upper Limit Lower Limit Anti two block:
Single fall Test: Load in tonnes: Boom Length in M Angle Creeping rate:
Statutory Test Requirement: TESTED BY: Dtd.:
Availability of Load Chart:
3 4 5 6 7 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38
BOOM OPERATING
LENTH RADIUS
Deg. 72 68 63 58 53 47 32
13.7 Cap. 125 100 80 68 61 55 39
Hyd. Press. 319 302 280 270 270 266 227
Deg. 80.5 78.5 76.5 74 69 66 60 54 47 39 29
22.4 Cap. 55 55 52 49 44 39 33 27.5 20 15.8 12
Hyd. Press. 165 193 210 222 224 217 226 206 187 180 177
Deg. 82.5 81 79 77 76 70 65 61 56 52 47 42 36 28 18
31.1 Cap. 35 35 33 31.5 30 25 20.5 16.5 13.4 11 8.8 7 5.4 4.1 3
Hyd. Press. 140 161 173 185 195 199 197 194 184 176 168 165 163 165 177
Deg. 85 81.5 80.5 78.5 75 70 68 65 62 58 55 51 47 43 39 36
39.8 Cap. 18 18 18 18 18 15.4 13.2 11 9.6 8.2 6.6 6 5.2 4.2 3.3 2.5 1.7
Hyd. Press. 121 122 123 125 152 164 167 168 168 168 170 166 163 162 159 159
Deg. 82 81 80 79 78 76 72 70 68 64 62 59 57 55 52 47 44 40
48.5 Cap. 14 14 13.5 12 11 9.6 8.6 7.8 7 6.6 5.7 4.8 4.1 3.5 3 2.3 1.8
Hyd. Press. 121 122 124 125 128 136 138 149 151 158 161 168 165 160 160 160 158 150