Sei sulla pagina 1di 2

Name:- Avdhesh Kumar

Employee Code:- EEPL/1057


Department:- Design and engineering - Electrical

Sr. No. Project Name Work profile

1 Preparation of Control room building layout

Preparation of cable tray layout for control room


2 building
Preparation of cable tray layout from control room to
3 MPPGCL existing ER

4 Calculation of power cable sizing

5 calculation for control cable sizing

6 floating of Indent for cable tray

7 Revision and submission of master SLD

Revision and resubmission of Lighting Layout for


8 secondary crusher house
9 Revision of cable tray layout for EB-1

Co ordination with consultant Desien regarding approval


10 of drawings.
RRVUNL, Kota
Co ordination with vendors regarding submission of
11 revised drawing to submit to client as well as to
consulatant.

12 revision in load list as per new data provided by vendors.

Single linbe diagram is also changed due to change in


13 load list.
14 Revsion of waggon tippler drawing.
15 Preparation of power cable sizing
16 Preparation and calculation for control cable sizing

17 Floating of Indent offer for power cable to vendors


18 Floating of Indent offer for control cable to vendors
Floating of control panel cum PLC panel for paddle
19 feedre to different vendors

preparation of Single line diagram for control panel used


20 for paddle feeder
SCCL
Preparation of cable sizing and cable schedule for paddle
21 feeder
SCCL

Floating of Indent query for TEFC Dual speer squirel cage


22 motor to different vendors

Floating of indent for different type of sensors and limit


23 switches to different vendors.

24 Co ordination and follow up with vendors for offer price


25 Co ordination with team for project related querries
Preparation of I/o list and PLC configuration used for
26 paddle feeder.

Date:
Signature

Potrebbero piacerti anche