Sei sulla pagina 1di 9

Khorais Road Project - Riyadh

Saudi Diyar Consultants

HVAC System
CHILLERS
Project :
Date : Ambient Temp, °F:

a- General :

1- Unit No :
2- Location :
3- Serial Number :
4- Model Number :
5- Type :
6- Voltage :
7- Amperage :
EVAPORATOR
8- Inlet Temperature , ° F: Δt
9- Outlet Temperature, ° F : 0
10- Inlet Pressure, psi : Δp
11- Outlet pressure, psi : 0
Design Actual
12- Water flow, gpm :
CONDENSER
13- No. Of Condenser Fans
14- Ambient temperature db/wb, ° F : /
Design Actual
15- Airflow, cfm :
Compressors comp 1 comp 2 comp 3
16- Suction pressure
17- Condenser pressure
18- Oil pressure / temperature
19- Stages :
20- Voltage
21- Amperage :
22- KW input
23- Low pressure cutout
24- High pressure cutout

NOTES :
Name Signature

05/07/2018
General 1
19:45:28
Khorais Road Project - Riyadh
Saudi Diyar Consultants

b- Check List :

1 - SPRING ISOLATOR MOUNTINGS INSTALLATION done not done


2 - INSTALLATION OF MOTORIZED VALVE done not done
3 - GATE VALVES INSTALLATION done not done
4 - FLEXIBLE CONNECTIONS INSTALLATIONS done not done
5 - DRV INSTALLATION done not done
6 - THERMOMETER & PG INSTALLATIONS done not done
7 - LEVELING ok not ok
8 - CHW PIPES CONECTIONS done not done
9 - PIPES INSULATION AND CLADDING done not done
### - PIPES IDENTIFICATION done not done
11 - SUPPORTING SYSTEM ok not ok
### - AUTOMATIC AIR VENT INSTALLATION done not done
### - CHW DRAIN PIPE FOR EACH CHILLER done not done
### - ELECTRICAL CONNECTIONS done not done
### - CONNECTION TO BMS done not done
### - CONTROL SEQUENCE done not done
### - CHANGEOVER UNIT INSTALLATION done not done
### - GENERAL CLEANING ok not ok
### - SOUND ATTENUATOR FOR CONDENSER FANS found not found
### - PRIMARY PUMP INSTALLATION done not done
### - PG INSTALLATION AT SUCTION & DISCHARGE SIDES done not done
### - WIRES INSTALLED INSIDE LIQUID TIGHT CONDUITS done not done
### - INTERLOCKING WITH CHILLER done not done
### - FLEXIBLE CONNECTIONS INSTALLATIONS done not done
### - AIR SEPARATOR INSTALLATION WITH DRAIN done not done
### - EXPANSION TANKS INSTALLATION WITH DRAIN done not done
### - CHEMICAL DOSING SET INSTALLATION done not done
### - MAKE UP WATER PUMPS INSTALLATION & TANK done not done
### - SOFTNER FOR MAKE UP WATER INSTALLATION done not done

NOTES :

Chillers are OFF when ambient temperature is °F

Name Signature Date

05/07/2018
Checklist 2
19:45:28
Khorais Road Project - Riyadh
Saudi Diyar Consultants

c- Electrical Checklist

Chillers are connected to MCC panel No. :


Voltage :
Amperage :

1 - Control panel installation good bad


2 - Indication lamps found not found
3 - Phase failure unit protection found not found
4 - Overload protection found not found
5 - Wires are tightly connected good bad

d- Control Checklist

Chillers are connected to DDC panel No. :

1 - Flow switch connection to DDC ok not ok


2 - Temperature sensor connection to DDC ok not ok
3 - Pressure sensor connection to DDC ok not ok
4 - Automatic valve connection to DDC panel ok not ok
5 Chillers command and signal status ok not ok
6 - Selector switch connection to DDC ok not ok
7 - Outside air temperature sensor installation ok not ok
8 - Outside air humidity sensor ok not ok
9 - Sequence of operation programming ok not ok

NOTES :

Name Signature Date

05/07/2018
Electrical&Control 3
19:45:28
Khorais Road Project - Riyadh
Saudi Diyar Consultants

e- LOG SHEET :

Water Side COMPRESSOR 1 COMPRESSOR 2 COMPRESSOR 3 COMPRESSOR 4 Condenser

Fans running
Amperage

Amperage

Amperage

Amperage

Amperage

Amperage
Voltage

Discharge

Discharge

Discharge

Discharge
Temp. out
Temp. in
Time¹

Suction

Suction

Suction

Suction
Δp, psi

Stages

Stages

Stages

Stages
Δt, °F

¹ reading shall be taken every 10 minutes


Notes:

05/07/2018
Log sheet 4
19:45:28
Khorais Road Project - Riyadh
Saudi Diyar Consultants

f- Secondary Chilled Water Pumps & Make up water pumps Check List :

1 - Vibration mounting installations found not found


2 - Installation of strainer and gate valve at suction side found not found
3 Installation of check valve and gate valve at discharge side found not found
4 - Installation of DRV at discharge side found not found
CHILLED WATER PUMPS

5 Chemical dosing set installation between suction and discharge found not found
6 Thermometer installation at suction and discharge sides found not found
7 - Pressure gauge installation at suction and discharge sides found not found
8 - Pressure sensors calibration done not done
8 - ChW pumps alignment ok not ok
9 Flexible connection at both suction and discharge sides found not found
### - Supporting system good bad
11 Pipe insulation and cladding good bad
### - Pipes identification found not found
### - Electrical connections good bad
### - Connection to BMS done not done
### - Sequence of operation programming done not done
### - Change over unit installation inside control panel found not found
### - VFD powered (wired to controlled equipment) ok not ok
### - VFD interlocked to control system ok not ok
### - Pressure sensor properly located and calibrated ok not ok
### - Drive location not subject to excessive temperature ok not ok
VFD

### - Drive location not subject to excessive moisture or dirt ok not ok


### - Drive size matches motor size ok not ok
### - Input of motor FLA represents 100-105% of motor FLA rating ok not ok
### - Appropriate Volts vs Hz curve is being used ok not ok
### - VFD speed at panel matches BMS readout ok not ok
### - Make up water tank installation with water supply line found not found
### - Make up water pumps installation good bad
MAKE UP WATER

### - Make up water pumps installed on anti vibration mounts ok not ok


### - Strainer and gate valve installation at suction side found not found
### - Check valve and gate valve installation at discharge side found not found
### - Pressure gauge installation at suction and discharge sides found not found
### - PRV installation with double check valve at discharge side found not found
### - Water softner installation with brine tank found not found
### Pressure vessel installation with drain connection done not done
### - Air separator installation and chilled water pipes connections done not done
### - Air separator drain connection done not done
OTHERS

### - Make up water connection done not done


### - Automatic air vent connection done not done
### - Expansion tank installation with drain connection done not done
### - Drain pipes with ball valve installation at main ChW headers done not done
### - Pump room flooring epoxy painted done not done

NOTES :
Name Signature Date

05/07/2018
Ch.WP checklist 5
19:45:28
Khorais Road Project - Riyadh
Saudi Diyar Consultants

05/07/2018
Ch.WP checklist 6
19:45:28
Khorais Road Project - Riyadh
Saudi Diyar Consultants

g- Electrical Checklist

Ch. W pumps are connected to MCC panel No. :


Voltage :
Amperage :

1 - Control panel installation good bad


2 - Indication lamps found not found
3 - Phase failure unit protection found not found
4 - Overload protection found not found
5 - Wires are tightly connected good bad
6 - Upper frequency limit set at 100% ok not ok
7 - Lower frequency limit set at 10-30% for ChW pumps
Actual =

h- Control Checklist

ChW pumps are connected to DDC panel No. :

1 - Flow switch connection to DDC ok not ok


2 - Temperature sensor connection to DDC ok not ok
3 - Pressure sensors connection to DDC ok not ok
4 - Selector switch connection to DDC ok not ok
5 ChW pumps command and signal status ok not ok
6 - Flow measurement ok not ok
7 - Sequence of operation programming ok not ok
8 - Make up water pump monitoring signal ok not ok

NOTES :

Name Signature Date

05/07/2018
Electrical Checklist 7
19:45:28
Khorais Road Project - Riyadh
Saudi Diyar Consultants

i- Primary Chilled water pumps readings :

DESIGN Pump 1 Pump 2 Pump 3 Pump 4


VOLTAGE
AMPS.
Suction, psi
Discharge, psi
Head, Ft 0 0 0 0
GPM
DRV position

FLA Rated FLA srvc Factor Max Amps


P1 0
P2 0
P3 0
P4 0

j- Make up water pumps readings :

DESIGN Pump 1 Pump 2


VOLTAGE
AMPS.
Suction, psi
Discharge, psi
Head, Ft 0 0
GPM

PRESSURE SWITCH SETTINGS


P1 (ON/OFF) ALTERNATION
P2 (ON/OFF) CHANGEOVER

FLA Rated FLA srvc Factor Max Amps


P1 0
P2 0

NOTES :

Name Signature Date

05/07/2018
Data for Primary Pumps 8
19:45:28
Khorais Road Project - Riyadh
Saudi Diyar Consultants

k- Secondary Chilled water pumps readings :

DESIGN Pump 1 Pump 2 Pump 3 Pump 4


VOLTAGE
FULL LOAD

AMPS.
Suction, psi
Discharge, psi
Head, Ft 0 0 0 0
GPM
DRV position

DESIGN Pump 1 Pump 2 Pump 3 Pump 4


MINIMUM LOAD

VOLTAGE
AMPS.
Suction, psi
Discharge, psi
Head, Ft 0 0 0 0
GPM
DRV position

Design Actual
Minimum flow required
Summer

Maximum flow required


Percentage
Minimum flow required
Winter

Maximum flow required


Percentage

FLA Rated FLA srvc Factor Max Amps


P1 0
P2 0
P3 0
P4 0

NOTES :

Name Signature Date

05/07/2018
Data for Secondary Pumps 9
19:45:28

Potrebbero piacerti anche