ETAP Page: 1
12.6.0H
Location: Date: 12-05-2017
Contract: SN:
Engineer: Study Case: GRD1 Filename: UNIT7

Revision: Base

Ground Grid Summary Report

Rg GPR
Touch Potential Step Potential
Ground Ground
Resistance Potential Rise Tolerable Calculated Calculated Tolerable Calculated Calculated
ohm Volts Volts Volts % Volts Volts %
8.532 17109.3 650.2 649.9 100.0 2108.7 1760.2 83.5

Total Fault Current: 2.000 kA Reflection Factor (K): -0.852

Maximum Grid Current: 2.005 kA Surface Layer Derating Factor (Cs): 0.790

Decrement Factor (Df): 1.003

Warnings:
Grid depth is greater than 2.5 m or less than 0.25 m