msTe017 ‘Subcontracting In SAP & Accounting Entries
43th February 2014 Subcontracting In SAP & Accounting Entries
Subcontracting is a very common Scenario in today's manufacturing industry.
Many business involve in manufacturing get many components and material produced by sub-contractors in
order to produce and deliver fine finish goods on time as ordered by customers. (There are many threads and
sources that help you to learn theoretical aspects on subcontracting in real world and SAP. Therefore refer
them for theoretical understanding).
In this blog I'm just illustrating you the subcontracting process and few subcontracting Examples with its
posting entries under different scenarios and general configuration. (In this blog | do not discuss about
subcontracting with chargeable components).
Let’s start from Subcontracting Process
Process of Subcontracting hitps:/)www.blogger.com/null]
Create Info Record - MEt1 - An Info Record must have been created for the material reference to
subcontracting
Create Purchase Order ~ ME21N - With Item category ‘L’.
Good issuance to subcontractor i.e. Transfer Posting - MB1B - Transfer the components from your storage
location to the subcontractor using the movement type - 541 (at this point no accounting entry will be
posted. only the stock transfer will take place from current storage location to subcontracting vender)
Goods Receipt - MIGO - receive the end product (and components) to Stock, movement types ~ 101 for main
material(end Product) and 543 for components
Subsequent Settlement if any- MBoq ~ Subsequent adjustment of components other than the entries in
GR(above 4)
Invoice verification - MIRO - Similar to normal invoice verification
If you are intending to implement subcontracting process comprehensively in your organization make sure
you have maintained all master data requirements related to subcontracting. For example, Procurement
Type (External Procurement/Both), Special Procurement key (30) in addition to the Info records, BOM
explosion field should blank etc. Other data are similar to the rest of the SFG/FG materials according to the
nature of your subcontracting requirement and valuation levels.
Note: Even without the aforesaid parameters you can execute the subcontracting transactions but as
mentioned it is not comprehensive and not correct as per standard process which will cause errors for
examples in standard costing run and therefore the standard price of such material will be incorrect.
Let's take some simple example so that it will be easy for you to understand.
E.g.: 1 Material XYZ is sent to sub-contracting vender Tea-times (2500) by High-times (1000 -CC) for further
processing.
Note: Cost of Sub-contracting end product (SFG/FG) will consist of its component Cost which is sent for
subcontracting and Sub contractors Price (external service cost).
According to the above problem below are the component of sub-contracting product
ie. FABot - (SFG sent to subcontractor)
Sub- contracting Cost (External Service Cost)
To produce 10 PAA of XYZ Material below quantity of component (Items) required
FABot-10Kg,
Subcontracting cost $10(s1 per PAA)
Standard Cost
The standard cost itemization can be shown as below.
Item Cat Resource Cost Element Total Value
mM 1000 FABo1 900720 7.81
L 2500 4000150215 1000 900700 10.00
17.81
hpiisubcontractingsap.blogspot.my/2014/02Isubcontractng-n-sap htm utmsTe017
‘Subcontracting In SAP & Accounting Entries
Scenario 01 - Posting Schema for Standard Price Control Without Price Differences
Goods issue -no entries posted
Goods received - At good received below entries will be posted(refer E.g. 01)
GLAIC AIC DESCRIPTION CRIDR AC COST CURR. MAT = COST
_ _ TYPE CENTER
‘e2t720 | RMCon.Against Sub-Contracting Dr P&L 7.81 USD FABox _t0001000
501000 | Raw Material Stock Ale GBS FABor
921630 | Inventory Change Sub Contracting CR PRL 7.81 USD XYZ _—_—_t0001000
501030 DR BS a7. USD XYZ
900700 | External Service Alc DR P&L 10.00 - USD XYZ_—_—t0001000
6oot00 | GRIIR Clearing alc CRBS 0.00 USD XYZ
‘Scenario 02 - Posting Schema for Standard Price Control With Price Differences (Price change in Invoice)
Company receives an invoice with value §15, i.e. at each PAA $1.5
Accounts postings are similar till GR as in scenario 1. Only in Invoice verification the price difference would
arise.
GLAIC AICDESCRIFTION CRIDR ACTYPE COST CURR. MAT —_COSTCENTER
“920301 | Price Diff Aje De P&L 500 USD XYZ 10009000
600100 | GRIER Sup Serv. Dr BS 10.00 USD XYZ
7500 | Tea-Times Cr Vender/BS 15.00) USD
Scenario 03 - Posting Schema for Standard Price Control With Price Differences (Price Change at PO)
Below will be the Posting entries.
Goods Receipt -
GLA AIC DESCRIPTION
21720 | RMCon. Against SubCont.
501000 | Raw Material Stock Alc
g20301 | Price Diff Ale
921630 | Inventory Change Sub Cont
501030 | Semi-finished stock afc
1900700 | External Service Alc
600100 | GRIR Clearing alc
INVOICE VERIFICATION - MIRO
600100 | GRIR Sup Serv
%500_ | Tea Times
Subcontracting Configuration —
CRIDR
De
or
oe
R
DR
DR
a
oR
AICTYPE AMOUNTS CURR.
Pa
Bs
PAL
PaL
8s
PaL
Bs
Bs
VenderiBS
hpiisubcontractingsap.blogspot.my/2014/02Isubcontractng-n-sap htm
7.81 USD
781 usp
5.00 uso
22.81 usp
7.81 usp
45,00 usp
15.00 Usp
15.00 uso
15.00 usp
MAT COST
CENTER
FABo1 10001000
FABot
XYZ 10003000
XYZ tooc1000
XYZ
XYZ 10001000
XYZ
xyz
216msTe017 ‘Subcontracting In SAP & Accounting Entries
In terms of configuration there are few.
1. Out of this automatic account determination in OBYC is important. It is mentioned below.
External Service cost (Sub-Contracting Cost) - Transaction FRL - Sub contracting Service Cost (P&L) alc
should be maintained with reference to the valuation class.
Sub-contracting inventory Change a/c determination - Transaction BSV - Change in stock account
* Consumption for subcontracting - Transaction - GBB with General Modification VBO with relevant
valuation classes and GL a/c
And apart from that the other genera configuration mention below
+ GR/IR Clearing account Determination — Transaction WRX - GRIR Clearing a/c
+ Stock A/c determination - Transaction BSX (Inventory posting) with Stock GL accounts
2. Automatic a/c assignment has to be done as well for the P&L accounts such as External Cost, Inventory
change a/c and consumption a/c. It is common that one Cost center is assigned for these P&L a/c so end of
the day the cost center will always show a ZERO balance.
3. In CO separate cost component with origin group can be created for subcontracting in OKTZ. So that the
sub-contracting cost can be separately shown within cost component reports.
4. Inline with Cost component you can assign a separate Value field in COPA for subcontracting. So all report
will be in same line.
| hope the above information provided will guide you and help you in understanding sub contracting and its
posting.
If find special and important areas related to subcontracting I'll be sharing with you.
Posted 13th February 2014 by Azhar Mashroon
Labels: Subcontracting in SAP & Account Postings,
(2) Add a comment
hpiisubcontractingsap.blogspot.my/2014/02Isubcontractng-n-sap htm 38msTe017 ‘Subcontracting In SAP & Accounting Entries
Enter your comment:
Comments: Select profile... 7
Preview
hpiisubcontractingsap.blogspot.my/2014/02Isubcontractng-n-sap htm
\
48