Sei sulla pagina 1di 1

Paper No.

670

to pay. Therefore, a projects of low traffic density 11. Potter, K. J. & Sanvido, V. Implementing a
and willingness to pay will have less number of Design/Build Prequalification System. Journal of
Management in Engineering 11, 30–34 (1995).
interested private parties and so prequalification
12. Palaneeswaran, E. & Kumaraswamy, M. M.
limits will be lower and vice versa. Contractor Selection for Design/Build Projects.
The inferences drawn from this study could be Journal of Construction Engineering and
further validated with larger samples of other Management 126, 331–339 (2000).
developing countries. This would help to overcome 13. Singh, D. & Tiong, R. L. K. Contractor Selection
Criteria: Investigation of Opinions of Singapore
the limitations of sample being small and help Construction Practitioners. Journal of
to increase the accuracy of the findings. Future Construction Engineering and Management 132,
research could also be undertaken by including 998–1008 (2006).
some of the ignored variables such as influence of 14. Planning Commission. Frequently Asked
unit cost of the project, per capita income of the Questions on Model RFQ Document. 2 (2009).
state, and package size (i.e. length of the project) 15. Anant, T. & Singh, R. Distribution of Highways
on the prequalification limits of the highway Public Private Partnerships in India: Key Legal
and Economic Determinants. (Stanford
projects. University, 2009).
References 16. Ministry of Finance. Online PPP Toolkit. (2010).
Available at: http://toolkit.pppinindia.com.
1. Morley, A. W. & Wainscott, D. E. W. Current
Challenges Facing PFI/PPP Procurement. in 17. Planning Commission. Guidelines for Public
XXIII International FIG Congress: Shaping the Change Private Partnership: Pre-Qualification of Bidders.
(International Federation of Surveyors, 2006). (The Secretariat for PPP & Infrastructure,
2. Kerf, M., Gray, R.D. & Taylor, R.R. Government of India, 2009).
Concessions for Infrastructure: A Guide to their 18. Planning Commission. Public Private Partnerships
Design and Award. World Bank Technical Papers No. Request for Qualification: Model RFQ Document.
399 112–114 (1998). (The Secretariat for PPP & Infrastructure,
3. Lo, W., Krizek, R. J. & Hadavi, A. Effects of Government of India, 2014).
High Prequalification Requirements. 19. Haran, M. Financial Structure of PPPs Deals
Construction Management and Economics 17, 603–612 Post-GFC: an International Perspective. Journal
(1999). of Financial Management of Property and
4. Estache, A. & Iimi, A. (Un)bundling Construction 18, 184–203 (2013).
Infrastructure Procurement: Evidence from Water
20. MORTH. Progressive Year Book. (2015).
Supply and Sewage Projects. Utilities Policy 19,
104–114 (2011). 21. Boeing Singh, L. & Kalidindi, S. N. Criteria
5. EPEC. The Guide to Guidance: How to Influencing Debt Financing of Indian PPP Road
Prepare, Procure and Deliver PPP Projects. (EPEC Projects: a Case Study. Journal of Financial
Secretariat, The European Investment Bank, 2012). Management of Property and Construction 14, 34–60
(2009).
6. Carbonara, N., Costantino, N. & Pellegrino, R.
A Transaction Costs-Based Model to Choose 22. Boeing Singh, L. & Kalidindi, S. N. Traffic
PPP Procurement Procedures. Engineering, Revenue Risk Management Through Annuity Model
Construction and Architectural Management 23, of PPP Road Projects in India. International
491–510 (2016). Journal of Project Management 24, 605–613 (2006).
7. Russell, J. S. & Skibniewski, M. J. Decision 23. KPWD. Pre-Feasibility Report on O&M of
Criteria in Contractor Prequalification. Journal of Roads on OMT Basis. (Karnataka Public Works
Management in Engineering 4, 148–164 (1988). Department, 2012).
8. Xia, B., Skitmore, M. & Zuo, J. Evaluation of 24. Puvvala, R., Ponnu, B., Arkatkar, S. &
Design-Builder Qualifications Through the Velmurugan, S. Estimating Capacity for Eight-Lane
Analysis of Requests for Qualifications. Journal of Divided Urban Expressway Under Mixed-Traffic
Management in Engineering 28, 348–351 (2012). Conditions Using Computer Simulation.
9. De Schepper, S., Haezendonck, E. & Dooms, M. International Journal of Advances in Engineering
Understanding Pre-Contractual Transaction Costs Sciences and Applied Mathematics 5, 177–194 (2013).
for Public–Private Partnership Infrastructure
25. PM News Bureau. Eastern Peripheral Expressway fully
Projects. International Journal of Project
Management 33, 932–946 (2015). Awarded. Project Monitor (2015).
10. Doloi, H. Analysis of Pre-Qualification Criteria in 26. Kumar, A. Highway Bid Norms to Get Tougher. Daily
Contractor Selection and their Impacts on Project News Analysis (2010). Available at: http://www.dnain-
Success. Construction Management and dia.com/money/report-highway-bid-norms-to-get-
Economics 27, 1245–1263 (2009). tougher-1360274.

108 Journal of the indian Roads Congress, July - September, 2017

Potrebbero piacerti anche