Q. No Question Status

Q.1 A stone having mass ‘m’ tied at the end of a string of length ‘L’ is whirled in a circle in vertical plane at a
constant speed. The tension in the string will be maximum when the stone is

a.  at the bottom of the circle
b. at the top of the circle
c. half way down from the top
d. quarter way down from the top

Attempt Correct Correct Ans. a


Video Solution FAQ? Have any doubt? Solution

Q.2 Which of the following statement is CORRECT in bar chart planning?

a.  The inter dependence of the operation cannot be portrayed.
b.  The progress of work can be measured.
c. The spare time of the activities can be determined.
d. The schedule can be updated.

Attempt Incorrect Your Ans. b Correct Ans. a


Video Solution FAQ? Have any doubt? Solution

Q.3 The strength of timber is maximum in which of the following direction?

a.  Perpendicular to grains
b. Same in all directions
c.  Parallel to grains
d. 45° to grains

Attempt Incorrect Your Ans. a Correct Ans. c


Video Solution FAQ? Have any doubt? Solution

Q.4 The main function of alumina in brick earth is

a.  to impart plasticity.
b. to make the brick durable.
c. to prevent shrinkage.
d. to make the brick impermeable.

Attempt Correct Correct Ans. a


Video Solution FAQ? Have any doubt? Solution

Q.5 A project has a duration of takes 25 days along the critical path and has a standard deviation of 5 days.
The probability of completing the project within 25 days will be

a. 0%
b.  50%
c. 75%
d. 100%

Attempt Correct Correct Ans. b


Video Solution FAQ? Have any doubt? Solution

Q.6 If a spring scale indicates a tension ‘T ’ in the right hand cable of the pulley system as shown below, then
the mass of wooden block will be

[Neglect the mass of pulleys and ignore friction between the cable and pulley]

a. Zero

b. 

c.   

d. 

Attempt Correct Correct Ans. c


Video Solution FAQ? Have any doubt? Solution

Q.7 Consider the following statements regarding the curing of concrete.
I. Concrete needs more water for chemical reaction.
II. It is necessary to protect the water initially mixed in concrete from being lost during evaporation.
III. Penetration of surrounding water increases the strength of concrete.
Which of the above statement(s) is(are) CORRECT?

a.  I, II and III
b. I and III
c.  II only
d. III only
Attempt Incorrect Your Ans. a Correct Ans. c
Video Solution FAQ? Have any doubt? Solution

Q.8 The  damp  proof  course  (D.P.C.)  of  uniform  thickness  in  a  building  having  walls  of  different  widths  is
measured in

a. m4
b. m3
c.   m2
d. m

Attempt Correct Correct Ans. c


Video Solution FAQ? Have any doubt? Solution

Q.9 According  to  the  Indian  Standard  specifications,  accelerated  cured  concrete  should  be  cured  under  a
minimum relative humidity of _____%.

Not Attempt Correct Ans. 90 Video Solution FAQ? Have any doubt? Solution

Q.10 Plywood is made by bonding together the thin layers of wood in such a way that the angle between grains
of any layer to the grains of adjacent layers is _____ degree.

Attempt Incorrect Your Ans. 0 Correct Ans. 90


Video Solution FAQ? Have any doubt? Solution

Q.11 A block weighing 981 N is resting on a horizontal surface. The coefficient of friction between the block and
the horizontal surface is 0.2. A vertical cable attached to the block provides partial support as shown. A
man can pull horizontally with a force of 100 N. If the man is just able to move the block to the right then the
tension in the cable is ____________ N.

Attempt Correct Correct Ans. 481


Video Solution FAQ? Have any doubt? Solution

Q.12 The network shown below has the estimated duration (in days) for each activity as marked on the network.

The latest finish time for activity H is ____________days.
Attempt Correct Correct Ans. 15
Video Solution FAQ? Have any doubt? Solution

Q.13 For perfectly elastic bodies, the value of coefficient of restitution is __________.

Attempt Correct Correct Ans. 1


Video Solution FAQ? Have any doubt? Solution

Q.14 The  optimistic,  most  likely  and  pessimistic  time  estimates  of  an  activity  are  5,  10  and  21  days
respectively. The ratio of expected time to standard deviation is _____.

Attempt Correct Correct Ans. 4.12 (4.10 ­ 4.20)


Video Solution FAQ? Have any doubt? Solution

Q.15 A swimmer can swim 10 km in 2 hours when swimming along the flow of a river. While swimming against
the flow, she takes 5 hours for the same distance. Her speed in still water is ________ km/h.

Attempt Correct Correct Ans. 3.5 (3.4 ­ 3.6)


Video Solution FAQ? Have any doubt? Solution

Q.16 The normal duration and normal cost of an activity are 10 days and Rs 350 respectively. The cost slope is
Rs 75 per day. If the crash duration is 8 days, then the crash cost of the activity will be Rs____________.

Attempt Correct Correct Ans. 500


Video Solution FAQ? Have any doubt? Solution

Q.17 Low percentage of C3 S and high percentage of C2 S in cement will result in

I. Rapid hardening
II. More ultimate strength with less heat generation
III. Better resistance to chemical attack
Which of the above statement(s) is(are) CORRECT?

a. Only I
b. Only II
c. I and III
d.  II and III

Attempt Correct Correct Ans. d


Video Solution FAQ? Have any doubt? Solution

Q.18 The following diagram shows the duration of various activities (in days) for the CPM network analysis:
The critical path will be

a. 1 – 2 – 3 – 5 – 6
b.  1 – 2 – 3 – 4 – 5 – 6
c. 1 – 2 – 4 – 5 – 6
d. 1 – 2 – 4 – 3 – 5 – 6

Attempt Correct Correct Ans. b


Video Solution FAQ? Have any doubt? Solution

Q.19 A beam ABCDEF,  7  m  long  is  subjected  to  vertical  forces  and  a  moment  as  shown  in  the  figure  given
below. The magnitude of simplest resultant (in N) of all these forces and its distance (in m) from end A will
be

a. 150 and 4.2
b.  100 and 4.2
c. 150 and 2.8
d.  100 and 2.8

Attempt Incorrect Your Ans. d Correct Ans. b


Video Solution FAQ? Have any doubt? Solution

Q.20 Match List­I with List­II and select the correct answer using the codes given below the lists:

a. a
b. b
c. c
d.  d

Attempt Correct Correct Ans. d


Video Solution FAQ? Have any doubt? Solution

Q.21 Which of the following pairs in respect of ordinary portland cement are correctly matched?
I. Initial setting time               ... 30 minutes
II. Final setting time               ... 10 hours
III. Normal consistency         ... 10%
Select the correct answer using the codes given below:

a. I, II and III
b. I and III
c.  I and II
d. II and III

Attempt Correct Correct Ans. c


Video Solution FAQ? Have any doubt? Solution

Q.22 Two blocks A and B of masses 20 kg and 10 kg are on a rough horizontal floor. A force ‘P  ’  pushes  the

masses at an acceleration of 4 m/s2 . What is the magnitude of force ‘P ’ (in N) and the reaction between the
blocks (in N)?
[Take coefficient of kinetic friction between block A and floor equal to 0.15 and that between the block B
and floor as 0.25]

a. 124.91 and 64.52
b. 124.91 and 73.58
c.  173.96 and 64.52
d. 173.96 and 73.58

Attempt Correct Correct Ans. c


Video Solution FAQ? Have any doubt? Solution

Q.23 Match List­I (Term) with List­II (Description) and select the correct answer using the codes given below the
lists:

a. a
b. b
c. c
d.  d

Attempt Correct Correct Ans. d


Video Solution FAQ? Have any doubt? Solution

Q.24 Consider the following statements regarding ‘AON’ diagram
I.  Each activity is represented by a circle.
II.  The successor of the activity is connected by a directed arrow.
III.  The number of the activity and the amount of time required for its completion are inserted in the job
node.
IV.    An  AON  graph  contains  a  node  for  the  start  and  a  node  for  the  finish  of  the  project.  Of  these
statements:

a. I, II and III are correct
b. II, III and IV are correct
c.  I, II, III and IV are correct
d. I, III and IV are correct

Attempt Correct Correct Ans. c


Video Solution FAQ? Have any doubt? Solution

Q.25 A bob of pendulum forms an arc of a circle of radius 1.5 m. If the tension in the cord is 2.6 times the weight
of the bob at position of pendulum is shown below in the figure then the velocity of the bob in this position is
_____ m/s.

Attempt Incorrect Your Ans. 4.61 Correct Ans. 5.05 (4.9 ­ 5.2)


Video Solution FAQ? Have any doubt? Solution

Q.26 PERT  calculations  yield  a  project  length  of  75  weeks  with  a  variance  of  9  weeks.  Probability  factor
corresponding  to  95%  probability  is  1.65.  The  number  of  weeks  required  to  complete  the  project  with  a
probability of 95% is _____

Attempt Correct Correct Ans. 79.95 (79.75 ­ 80.15)


Video Solution FAQ? Have any doubt? Solution

Q.27 Modular bricks are of nominal size 20 × 10 × 10 cm and 25% of the volume is lost in mortar between joints.
The number of modular bricks required per cubic meter of brickwork are ________. [Round off to nearest
integer]

Attempt Incorrect Your Ans. 375 Correct Ans. 463 (461 ­ 465)


Video Solution FAQ? Have any doubt? Solution

Q.28
A beam AB, 2 m long, uniform in cross­section is held in equilibrium by the application of a force ‘P ’ as
shown below. If the self weight of beam AB is 100 kN then the magnitude of force ‘P ’ is _____ kN.

Attempt Correct Correct Ans. 70.71 (70 ­ 71.5)


Video Solution FAQ? Have any doubt? Solution

Q.29 A  bar  chart  of  four  activities  indicating  their  scheduled  start  and  finish  time  in  days  and  the  resource
requirement per day are shown below. The ratio of maximum to the minimum resource needed on any of
the day will be _____.

Attempt Correct Correct Ans. 3.67 (3.6 ­ 3.7)


Video Solution FAQ? Have any doubt? Solution

Q.30 The cross­section of a strip footing is shown below :

The quantity of earth work in excavation per meter is ________ × 10–3  m3 .

Attempt Correct Correct Ans. 393.75 (392 ­ 395)


Video Solution FAQ? Have any doubt? Solution

Q.31 A triangle ABC with sides AB = 9 cm, BC = 7 cm, CA = 6 cm is shown in figure. The position of its centroid
on x­axis (i.e. distance from y­axis) is _____ cm.
Attempt Correct Correct Ans. 4.26 (4.2 ­ 4.4)
Video Solution FAQ? Have any doubt? Solution

Q.32 A network of seven activities is shown in the diagram given below. The respective activity durations (in
weeks) are shown beside the arrows. The sum of the total float in AB, the total float in CE and free float in
EF is _________ weeks.

Attempt Correct Correct Ans. 7


Video Solution FAQ? Have any doubt? Solution

Q.33 A mass of 35 kg is suspended from a weightless bar AB which is supported by a cable CB and a pin at A
as shown in figure. The resultant pin reaction at A on the bar AB is ____________N.

Attempt Incorrect Your Ans. 1020.8 Correct Ans. 755.51 (755 ­ 757)