Sei sulla pagina 1di 24

Common NOC Report

Transaction ID: 11-2016456882-01-3-01-00-101

Project Number: ِAD537

Plot Number: Abu Dhabi - KHALIFA CITY - SW17 - - Multiple

Generated By: Contractor/Feras Badr Iddin Abdul Samad

Generated date: 03 - 12 - 2016

Owner Name:

Permit Category: Utility and Infrastructure Lines Approvals

Permit Type: Utilities Underground Cables or Pipelines

Permit Sub type: Sewer Line

Project Stage: Construction

Construction Phase: Phase 1

Submission Date: 08 - 11 - 2016 11:51:24 AM

NOC Reply Summary


Role System Default Transaction Focal Point Reply
Distribution Coordinator
Intervention
Description

Default NOC 20 20 20
NOC Without Conditions 3
NOC With Conditions 3
Conditions to Issue NOC 3
Objection

In Progress 10 10 1

Page Number: 1 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Municipal approval replies

Issuing Entities Focal NOC Replies

Transaction
System Default
Entity Name Focal Point NOC Reply Reply Date Coordinator
Action
Action
11/16/16 2:34
PM
Abu Dhabi
ADDC Assets FP For Action
Distribution
Supervisor
Company C) Conditions to
Issue NOC
11/13/16 8:16
AM
Municipality of Abu ADM Asset For Action
Dhabi City Coordination FP
B) NOC with
Conditions
11/30/16 11:08
AM
Abu Dhabi National For Action
ADNOC HQ FP
Oil Company
B) NOC with
Conditions
11/17/16 8:46
AM
Abu Dhabi
ADSSC Sewerage For Action
Sewerage Services
AD FP
Company C) Conditions to
Issue NOC
11/17/16 2:43
PM
ADTCA Tourism
Abu Dhabi Tourism For Action
and Culture FP -
and Culture Agency
AD and WR A) NOC with No
Conditions

Department of DoT Right-of-Way For Action


Transport FP - AD
No Answer

11/22/16 10:19
AM
Emirates Integrated
Telecommunication Du Telecom FP For Action
Company - Du A) NOC with No
Conditions

Page Number: 2 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Transaction
System Default
Entity Name Focal Point NOC Reply Reply Date Coordinator
Action
Action
11/28/16 7:58
Emirates AM
Telecommunication Etisalat Telecom For Action
Corporation - FP - Abu Dhabi
Etisalat C) Conditions to
Issue NOC
11/13/16 8:10
AM
UAE Armed Forces GHQ Military
General Works and For Action
Headquarters Telecom FP A) NOC with No
Conditions
11/13/16 8:52
AM
Abu Dhabi Transco
Transmission and Infrastructure For Action
Despatch Company Services FP B) NOC with
Conditions

Environment Agency EAD FP - Wild For Consideration


- Abu Dhabi Protection Sector
No Answer

General Directorate AD Police Telecom Not for Action


of Abu Dhabi Police FP
Default NOC

General Directorate AD Police Traffic Not for Action


of Abu Dhabi Police Safety FP
Default NOC

ADAC Air
Abu Dhabi Airports Not for Action
Navigation
Company
Services FP Default NOC

Abu Dhabi
ADDC Customer Not for Action
Distribution
Services FP
Company Default NOC

Abu Dhabi
ADDC Plot-Related Not for Action
Distribution
FP - Electrical
Company Default NOC

Page Number: 3 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Transaction
System Default
Entity Name Focal Point NOC Reply Reply Date Coordinator
Action
Action

Abu Dhabi
ADDC Plot-Related Not for Action
Distribution
FP - Water
Company Default NOC

Municipality of Abu ADM Services Not for Action


Dhabi City Corridor FP
Default NOC

Municipality of Abu Not for Action


ADM Traffic FP
Dhabi City
Default NOC

Abu Dhabi Ports Not for Action


ADPC Marine FP
Company
Default NOC

Abu Dhabi Ports Not for Action


ADPC Ports FP
Company
Default NOC

Abu Dhabi Water


ADWEA Not for Action
and Electricity
Generation FP
Authority Default NOC

Emirates Nuclear Not for Action


ENEC FP
Energy Corporation
Default NOC

Etihad Rail Etihad Rail FP Not for Action

Default NOC

Emirates
Etisalat Telecom
Telecommunication Not for Action
FP - Western
Corporation -
Region Default NOC
Etisalat

Page Number: 4 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Transaction
System Default
Entity Name Focal Point NOC Reply Reply Date Coordinator
Action
Action

Kizad Industrial
Khalifa Industrial Not for Action
Customer Service
Zones Abu Dhabi
FP Default NOC

Monitoring and MCC Monitor and Not for Action


Control Center Control FP
Default NOC

National Central
Tabreed Cooling Not for Action
Cooling Company
FP
PJSC Default NOC

Abu Dhabi Transco Plot-


Transmission and Related Services Not for Action
Despatch Company FP Default NOC

Higher Corporation ZonesCorp


for Specialized Industrial Customer Not for Action
Economic Zones Services FP Default NOC

Attachments

Entity Name Type Sub Type Date

HILAL BIL BADI & PARTNERS


Administrative (3) - Pre- Other Undertaking or
CONTRACTING COMPANY - 08 - 11 - 2016 11:54:04
requisites Clearances Guarantee
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:01:13
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:01:29
W L L - HILALCO

Page Number: 5 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Entity Name Type Sub Type Date

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:01:40
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:02:09
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:02:18
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:02:24
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:02:32
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:02:39
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:02:47
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:02:58
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:03:08
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:03:18
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:03:26
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:03:34
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:03:42
W L L - HILALCO

Page Number: 6 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Entity Name Type Sub Type Date

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:03:49
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:03:59
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:04:12
W L L - HILALCO

HILAL BIL BADI & PARTNERS


CONTRACTING COMPANY - Administrative (1) - General Affection Plan 08 - 11 - 2016 12:04:32
W L L - HILALCO

Page Number: 7 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Transaction History

User Name Workflow Step Reply Reply Date Solution Role

Initiate request and define


Feras Badr Iddin Abdul Samad Request Submitted 08 - 11 - 2016 12:20:11 Contractor
data

Submit transaction after


Feras Badr Iddin Abdul Samad working on authorized Request Submitted 08 - 11 - 2016 12:29:21 Contractor
data

Initiating NOC
ADM TP Infrastructure
Ahmed Abu Zahra Helal Lutfi Review request and Transaction by the
13 - 11 - 2016 07:51:35 Permitting Eng -
Abu Zahra perform further analysis Permitting Body Project
Utilities - Area1
Representative

Page Number: 8 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Transaction Details
Administrative Information

Contact Person Information

First Name Middle Name Third Name


Feras Badr Iddin
Family Name
Abdul Samad

Emirate Phone Number Email


0504782333 feras.abdulsamad@hilalco.com

Organization Information

Organization Organization Name Organization Phone


CN-1036448 HILAL BIL BADI & PARTNERS -

Department

Requester Information (Project Owner)


Owner Type Email

Entity Name Phone Number

Organization Contact

Comments

Contractor Information
License Number /

Name Phone Number Email

Page Number: 9 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Attachments

Entity Name User Name Workflow Step Attachment Attachment Date

AD-All firas.as Initiate request and Administrative (1) - Emirates ID Copy 08 - 11 - 2016
define data General

AD-All firas.as Initiate request and Administrative (1) - Commercial 08 - 11 - 2016


define data General Registration Copy

AD-All firas.as Initiate request and Administrative (1) - Power of Attorney 08 - 11 - 2016
define data General

AD-All firas.as Initiate request and Administrative (1) - Letter of Award or 08 - 11 - 2016
define data General Appointment

AD-All firas.as Initiate request and Administrative (2) - Other Undertaking 08 - 11 - 2016
define data Undertakings or Guarantee

AD-All firas.as Initiate request and Administrative (3) - Valid NOC 08 - 11 - 2016
define data Pre-requisites Certificates
Clearances

AD-All firas.as Initiate request and Administrative (3) - Valid NOC 08 - 11 - 2016
define data Pre-requisites Certificates
Clearances

AD-All firas.as Initiate request and Administrative (3) - Valid NOC 08 - 11 - 2016
define data Pre-requisites Certificates
Clearances

AD-All firas.as Initiate request and Administrative (3) - Valid NOC 08 - 11 - 2016
define data Pre-requisites Certificates
Clearances

AD-All firas.as Initiate request and Administrative (3) - Valid NOC 08 - 11 - 2016
define data Pre-requisites Certificates
Clearances

AD-All firas.as Initiate request and Administrative (3) - Valid NOC 08 - 11 - 2016
define data Pre-requisites Certificates
Clearances

AD-All firas.as Initiate request and Administrative (3) - Valid NOC 08 - 11 - 2016
define data Pre-requisites Certificates
Clearances

AD-All firas.as Initiate request and Administrative (3) - Valid NOC 08 - 11 - 2016
define data Pre-requisites Certificates
Clearances

AD-All firas.as Initiate request and Photographs Pre - Site 08 - 11 - 2016


define data Photographic
Record

Page Number: 10 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Entity Name User Name Workflow Step Attachment Attachment Date

AD-All firas.as Initiate request and Photographs Pre - Site 08 - 11 - 2016


define data Photographic
Record

AD-All firas.as Initiate request and Photographs Pre - Site 08 - 11 - 2016


define data Photographic
Record

AD-All firas.as Initiate request and Photographs Pre - Site 08 - 11 - 2016


define data Photographic
Record

AD-All firas.as Initiate request and Photographs Pre - Site 08 - 11 - 2016


define data Photographic
Record

AD-All firas.as Initiate request and Photographs Pre - Site 08 - 11 - 2016


define data Photographic
Record

AD-All firas.as Initiate request and Photographs Pre - Site 08 - 11 - 2016


define data Photographic
Record

AD-All firas.as Initiate request and Photographs Pre - Site 08 - 11 - 2016


define data Photographic
Record

AD-All firas.as Initiate request and Photographs Pre - Site 08 - 11 - 2016


define data Photographic
Record

AD-All firas.as Initiate request and Photographs Pre - Site 08 - 11 - 2016


define data Photographic
Record

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

Page Number: 11 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Entity Name User Name Workflow Step Attachment Attachment Date

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Affection Plan 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Project Location 08 - 11 - 2016
define data Drawings

AD-All firas.as Initiate request and Spatial Inputs / Location Plan or 08 - 11 - 2016
define data Drawings Map

Page Number: 12 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Basic Transaction Information

Transaction Nature
New Project

Permit Category Permit Type Project Stage


Utility and Infrastructure Lines Approvals Utilities Underground Cables or Pipelines Construction

Construction Phase
Permit Sub type
Sewer Line Phase 1

Expedited

Muncipality Name District Name Community Name Road Name Plot Number

ADM SW17

Project Information

Project Number Project ID


ِAD537 85677

Project Name
‫ ﻧﺎﺩﻱ ﺍﻟﻔﺮﺳﺎﻥ‬-17 ‫ ﻣﺪﻳﻨﺔ ﺧﻠﻴﻔﺔ ﺃ ﺣﻮﺽ‬- ‫ﻣﺪﻳﻨﺔ ﺃﺑﻮﻇﺒﻲ‬

Project Description

‫ﻣﺸﺮﻭﻉ ﺍﻟﻔﺮﺳﺎﻥ ﻻﻧﺸﺎﺀ ﺧﻄﻮﻁ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ ﻭﺍﻟﺮﻱ ﺩﺍﺧﻞ ﺷﺮﻳﺤﺔ ﺧﺪﻣﺎﺕ‬

Project Start Date Closure Date

01 - 10 - 2016 30 - 05 - 2017

Transaction Data

Date Owner Corresponding Number


08 - Nov - 2016

Municipal Corresponding Number

Page Number: 13 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Additional Transaction Information

Transaction Specific Information


Purpose/Activity Abnormal Load (tons) Install/Move Parking Machines/Signs
0 ● No ○ Yes
Typology (Building Usage) No. of Personal NDRC
0 ● No ○ Yes
Typology (Crane) No. of Blocks Distance (from Plot)
0 10
Typology (Land Usage) No. of Cranes Length of Network (km)
0 0
Typology (Onshore Projects) Period (days) No. of Floors
0 0
Typology (Public Realm) Event Period (days) Date Of Completion Certificate
0
Typology (Urban Road) Population (capita) Guarantee Period (months)
0 1
Typology (Utility) Surface Area (square meters) Partial Demolition
0 0
Voltage (kV) Master Plan
Developement Type
0
Land Allocation Navigation Capacity (dwt)
Allocation 0
Date of Event Noise Absorbtion Parameter
0
Diameter (meters) Include Removal of Towers
1 ● No ○ Yes
Estimated Time for Containment Install Parking Shades
48 ● No ○ Yes
Level of Backfill (meters) Install Shelters
● No ○ Yes

Page Number: 14 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Transaction comments and attachments

ADDC
ADDC Assets FP Supervisor
Kindly upload main ADDC requirements (copy attached) as ZIP Files
using WinZip, folder for Water and folder for Electricity. File name inside
each folder to be same as the requirement.

ADM
ADM Asset Coordination FP
This NOC certificate issued depending on GIS layers and ADM Makani
program, and any (irrigation & storm water) line/s belong to ADM assets
crossing / interfering with the applicant project/ road diversion/NDRC
(Non disruptive road crossing) /cables routes such as ( F.O.C /
Electrical cables ) /utility route services /utilities house
connection/overhead lines structure/public realm maintenance
works/soil investigation ?trial pits/development project(utility and
infrastructure network)/falcon eye project by HDD /internal road projects,
etc. The owner or contractor shall take the whole responsibility to
relocate/ protect / damage/s repairing to the affected ADM assets under
his own cost, and this process should be review and approved by ADM
assets permit team at ADM HQ 4th floor C zone.
‫ﺗﻢ ﺍﺻﺪﺍﺭ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﻭﻓﻘﺎ ﻟﻠﻤﻌﻠﻮﻣﺎﺕ ﺍﻟﻤﺘﻮﻓﺮﺓ ﻣﻦ ﺧﺪﻣﺔ ﺍﻟﻤﻌﻠﻮﻣﺎﺕ ﺍﻟﻤﻜﺎﻧﻴﺔ ﻭﺍﻟﺒﻴﺎﻧﻴﺔ ﻭﻋﻠﻴﻪ ﻓﻲ ﺣﺎﻟﺔ‬
‫ ﻣﻘﺎﻭﻝ ﺍﻟﻤﻮﻗﻊ ( ﻭﺟﻮﺩ ﺧﻂ ﺃﻭ ﺧﻄﻮﻁ ﺧﺪﻣﺎﺕ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺗﺎﺑﻌﺔ‬/ ‫ﺍﻛﺘﺸﺎﻑ ﻣﻘﺪﻡ ﺍﻟﻄﻠﺐ ) ﻣﺎﻟﻚ ﺍﻟﻘﺴﻴﻤﺔ‬
‫ ﺧﻂ ﺻﺮﻑ ﻣﻴﺎﻩ ﺍﻻﻣﻄﺎﺭ ( ﻓﺴﻮﻑ ﻳﺘﺤﻤﻞ )ﻣﺎﻟﻚ ﺍﻟﻘﺴﻴﻤﺔ ﺍﻭ‬/ ‫ﻷﺻﻮﻝ ﺑﻠﺪﻳﺔ ﻣﺪﻳﻨﺔ ﺃﺑﻮﻇﺒﻲ )ﺧﻂ ﺭﻱ‬
‫ ﺃﻭ ﺇﺻﻼﺡ ﺍﻟﺨﻂ ﺃﻭ ﺍﻟﺨﻄﻮﻁ ﻋﻠﻰ ﺍﻥ ﺗﺘﻢ ﻫﺬﻩ‬/‫ ﺗﺤﻮﻳﻞ‬/‫ﻣﻘﺎﻭﻝ ﺍﻟﻤﻮﻗﻊ ( ﺟﻤﻴﻊ ﻧﻔﻘﺎﺕ ﺃﻋﻤﺎﻝ ﺣﻤﺎﻳﺔ‬
‫ﺍﻻﺟﺮﺍﺀﺍﺕ ﺗﺤﺖ ﺃﺷﺮﺍﻑ ﺍﺩﺍﺭﺓ ﺗﺼﺎﺭﻳﺢ ﺍﺻﻮﻝ ﺍﻟﺒﻨﻴﺔ ﺍﻟﺘﺤﺘﻴﺔ ﺑﺒﻠﺪﻳﺔ ﺃﺑﻮﻇﺒﻲ ﺍﻟﻄﺎﺑﻖ ﺍﻟﺮﺍﺑﻊ ﺍﻟﻤﻨﻄﻘﺔ ﺳﻲ‬
The validity of this NOC approval is for six (6) month starting the date of
this approval
‫( ﺃﺷﻬﺮ ﻣﻦ ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭﻫﺎ‬6) ‫ﻫﺬﻩ ﺍﻟﻤﻮﺍﻓﻘﺔ ﺳﺎﺭﻳﺔ ﻟﻤﺪﺓ‬

ADNOC HQ
ADNOC HQ FP
Contractor shall comply with all conditions mentioned in attached
Takreer's letter

ADSSC
ADSSC Sewerage AD FP
INCOMPLETE DOCUMENTS.
Please Submit:-
- Clear proposed Dwg (PDF & CAD) match with Approved route
Approval from ADM & Identify your proposed work only, nature of your
work in your dwg and the location.(show the coordinates OR sector &
plot in the proposed DWG and contractor details)

Du
Du Telecom FP

Page Number: 15 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Currently, E.I.T.C./du has No existing infrastructure within your proposed
project area of works. We request you to submit separate NOC for
fencing.
E.I.T.C./du has No Objection to the above proposed development.

Etisalat
Etisalat Telecom FP - Abu Dhabi
Please be advised that we have Objection to your proposed work.
Please submit trial pit for site verification and submit method statement,
protection details, crossing details, undertaking letter, depth details and
excavation details of your proposed works for review & approvals.

Please submit request letter hard & soft copy long with detailed design
drawing with co-ordinates points, scope of works to submit the
documents in salaam street Etisalat, any query please contact us
026162747, 026162746, 026162200.

TRANSCO
Transco Infrastructure Services FP
Kindly be informed that there are no Transmission water or power in your
proposed work area. Before commencing any work on site, you are
requested to coordinate with our consultants, M/s. Tebodin, Tel: 02-
4066000, Abu Dhabi. M/s. Lahmeyer International, Tel: 02-6794615, Abu
Dhabi. M/s. Mott Macdonalds, Tel: 02-4457470, Abu Dhabi. M/s.
Parsons Brinckerhoff Limited, Tel: 02-6529222, Abu Dhabi. M/s. Energo
Consult L.L.C, Tel: 02-6763554, Abu Dhabi. for details of Transmission
lines being constructed/will be constructed under their supervision.

ADTCA
ADTCA Tourism and Culture FP - AD and WR
TCA Abu Dhabi has no objection to this particular project.

List of Attachments Requirements


Entity Name User Name Workflow Step Attachement Attachement File Name

ADDC melnaggar Review request - Technical Inputs Other Technical ADDC - Main

ADNOC HQ aaljefri Review request - Technical Inputs Other Technical 8062-Takreer.pdf

Etisalat punithan.d Review request - SPAICAL GIS AL FORSAN

Etisalat punithan.d Review request - SPAICAL GIS AL FORSAN

Etisalat punithan.d Review request - SPAICAL GIS AL FORSAN

Etisalat punithan.d Review request - SPAICAL GIS AL FORSAN

Etisalat punithan.d Review request - Technical Inputs Proforma Excavation_Form_

Etisalat punithan.d Review request - Technical Inputs Proforma Crossing Details.

Etisalat punithan.d Review request - Technical Inputs Proforma Sample drawing

Etisalat punithan.d Review request - Technical Inputs Proforma Duct concrete

Page Number: 16 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Amendments Comments and Attachments

AD-All
Contractor
8062639844 ‫ﺣﺴﺎﺏ ﺍﻟﺸﺮﻛﺔ ﻓﻲ ﺷﺮﻛﺔ ﺍﺑﻮﻇﺒﻲ ﻟﻠﺘﻮﺯﻳﻊ‬

Attachment Attachment Type Uploaded By Upload Step

Letter of Award or Appointment Submit authorized


- (1) Feras Badr Iddin
transaction

Letter of Award or Appointment Submit authorized


- (1) Feras Badr Iddin
transaction

Letter of Award or Appointment Submit authorized


- (1) Feras Badr Iddin
transaction

Letter of Award or Appointment Submit authorized


- (1) Feras Badr Iddin
transaction

Undertaking for Damage Repair Submit authorized


- (2) Feras Badr Iddin
transaction

Page Number: 17 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Map

Page Number: 18 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Design Attributes
Design Version Map Feature
1 polygon

Location
Long, Lat DEM Elevation Sharing Duct
24.40218388 , 54.55209541 False

Grid Depth (Maximum) Height (Maximum)


40R BN5100,40R BN5200,40R

Region
Ground Level Length (Meter)

Buffer (Meters)
10 Width (Maximum)

Shape Area
66898.9

Design Change Reason



Comments from Issuing Entities


Changes in permitting requirements

NOC Certificates

Individual NOC ID: 16458100060001


Solution Role ADDC Assets FP Supervisor

Entity Name ADDC


NOC Reply C) Conditions to Issue NOC

Valid 1 Weeks Starting from:16 - 11 - 2016 02:11:00 till 22 - 11 - 2016 02:11:00

Conditions
Other Conditions

RFI Case - Design should be completed as


per information/attachment(s) provided

Further NOC must be obtained from VIP


entities (see comments / attachments)

Page Number: 19 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Individual NOC ID: 16458100070001
Solution Role ADM Asset Coordination FP

Entity Name ADM


NOC Reply B) NOC with Conditions

Valid 6 Months Starting from:13 - 11 - 2016 08:11:30 till 12 - 05 - 2017 08:05:30

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 16458100100001


Solution Role ADNOC HQ FP

Entity Name ADNOC HQ


NOC Reply B) NOC with Conditions

Valid 6 Months Starting from:30 - 11 - 2016 11:11:51 till 30 - 05 - 2017 11:05:51

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 20 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Individual NOC ID: 16458100140002
Solution Role ADSSC Sewerage AD FP

Entity Name ADSSC


NOC Reply C) Conditions to Issue NOC

Valid 1 Months Starting from:17 - 11 - 2016 08:11:48 till 16 - 12 - 2016 08:12:48

Conditions
Other Conditions

Other financial or legal conditions as


specified in the comments or attachments

Individual NOC ID: 16458100340001


Solution Role ADTCA Tourism and Culture FP - AD and WR

Entity Name ADTCA


NOC Reply A) NOC with No Conditions

Valid 1 Years Starting from:17 - 11 - 2016 02:11:08 till 16 - 11 - 2017 02:11:08

Conditions
Not Relevant Project
Other notes that may enhance the business
rules as specified in the comments /
attachments

Page Number: 21 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Individual NOC ID: 16458100190001
Solution Role DoT Right-of-Way FP - AD

Entity Name DoT


NOC Reply

Individual NOC ID: 16458100200001


Solution Role Du Telecom FP

Entity Name Du
NOC Reply A) NOC with No Conditions

Valid 6 Months Starting from:22 - 11 - 2016 10:11:31 till 21 - 05 - 2017 10:05:31

Conditions
Not Relevant Project

The project area is completely outside the


entity jurisdiction area

Other notes that may enhance the business


rules as specified in the comments /
attachments

Page Number: 22 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Individual NOC ID: 1653812464146
Solution Role Etisalat Telecom FP - Abu Dhabi

Entity Name Etisalat


NOC Reply C) Conditions to Issue NOC

Valid 4 Weeks Starting from:28 - 11 - 2016 07:11:17 till 25 - 12 - 2016 07:12:17

Conditions
Other Conditions

Other financial or legal conditions as


specified in the comments or attachments

Individual NOC ID: 16458100260001


Solution Role GHQ Military Works and Telecom FP

Entity Name GHQ


NOC Reply A) NOC with No Conditions

Valid 6 Months Starting from:13 - 11 - 2016 08:11:07 till 12 - 05 - 2017 08:05:07

Conditions
Not Relevant Project

The project area is completely outside the


entity jurisdiction area

Page Number: 23 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016


Individual NOC ID: 16458100280002
Solution Role Transco Infrastructure Services FP

Entity Name TRANSCO


NOC Reply B) NOC with Conditions

Valid 6 Months Starting from:13 - 11 - 2016 08:11:23 till 12 - 05 - 2017 08:05:23

Conditions
Implementation Conditions

Contractor should apply general safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 16458100210001


Solution Role EAD FP - Wild Protection Sector

Entity Name EAD


NOC Reply

Page Number: 24 / 24 Transaction 11-2016456882-01-3-01-00 Report generated On:03-12-2016

Potrebbero piacerti anche