Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
RE F AMM 24-50-00-001
C I R C UI T BR E AK E R A319/320 C I R C UI T BR E AK E R A319/320
P AN E L DE SI G N AT I O N LO C P AN E L DE SI G N AT I O N LO C
AI R C O NDI T I O NI NG SYST E M 122VU AIR COND/FLOW/MIXER/FLAP V22
122VU AIR COND/FLOW/CTL & IND 2 V21
49VU AIR COND/RAM/AIR/INLET D10
49VU AIR COND/CAB/PRESS CTL 1 D09 123VU AVNCS VENT/BLOWER FAN AD10
49VU AIR COND/AVNCS VENT/CTL D06 123VU AVNCS VENT/EXTC FAN AE02
49VU AIR COND/FLOW/CTL & IND 1 D07
49VU AIR COND/AVNCS VENT CTL D05 AUT O F L I G H T
AT A P R O BLE M O R C B T O R E SE T
M SG
AUT O F L T A/T H R UP P E R E C AM M SG AF T E R
O F F M SG E NG I NE ST AR T AND BE F O R E
22 T .O . T H R U ST I S AP P L I E D (O N
T H E G R O UND).
T H I S M SG SH O UL D D E
DI SR E G AR DE D BY F L I G H T
C R E W P E R F L T M ANU AL 7-50
3-RESULTS OF POWER-UP TESTS
TESTS PASS:
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: >7 HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: >4
MIN ON BOTH FCU’S SEC.
A/C CONFIGURATION: A/C CONFIGURATION:
A/C ON GROUND A/C ON GROUND WITH ENGINES STOPPED
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: >1 HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: >4
SEC SEC.
A/C CONFIGURATION: A/C CONFIGURATION:
A/C ON GROUND A/C ON GROUND WITH ENGINES STOPPED
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: >4 HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: >4
SEC SEC.
A/C CONFIGURATION: A/C CONFIGURATION:
A/C ON GROUND WITH ENGINES STOPPED 1-A/C ON GROUND WITH ENGINES STOPPED FOR
ELECTRICAL POWER-UP TESTS,
2- PROGRESS OF POWER-UP TESTS 2-A/C ON GORUND AND HYDRAULICALLY ENERGIZED
DURATION: 120 SEC FOR YAW DAMPER POWER LOOP POWER-UP TESTS
FLIGHT DECK EFFECTS:
ECAM STATUS PAGE: AP# 1 E 2 INOP 2- PROGRESS OF POWER-UP TESTS
DURATION:1 –90 SEC
3-RESULTS OF POWER-UP TESTS 2 –5 SEC
TESTS PASS: FLIGHT DECK EFFECTS:
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED AUTO FLT RUDDER TRIM 1(2)
AUTO FLT RUD TRAV LIM 192)
TESTS FAIL: (FAULT CONFIRMED) AUTO FLT YAW DAMPER 1(2)
PROCEED TO MEL/TSM FOR FLT CTL PANEL: FAULT FLASHES ON FAC 1 PUSHBUTTON
DEFERAL/TROUBLESHOOTING
3-RESULTS OF POWER-UP TESTS
TESTS PASS:
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: >4 HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: >4
SEC. SEC.
A/C CONFIGURATION: A/C CONFIGURATION:
1-A/C ON GROUND WITH ENGINES STOPPED FOR 1-A/C ON GROUND WITH ENGINES STOPPED FOR
ELECTRICAL POWER-UP TESTS, ELECTRICAL POWER-UP TESTS,
2-A/C ON GORUND AND HYDRAULICALLY ENERGIZED 2-A/C ON GORUND AND HYDRAULICALLY ENERGIZED
FOR YAW DAMPER POWER LOOP POWER-UP TESTS FOR YAW DAMPER POWER LOOP POWER-UP TESTS
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
>200 MS. >200 MS.
A/C CONFIGURATION: A/C CONFIGURATION:
A/C ON GROUND A/C ON GROUND
AT A P R O BLE M O R C B T O R E SE T
M SG
P AX VU 2000 F 6 C ABI N C O M SYS P E S
23 E NT E R T AI NM E NT I F NO H E L P , T H E N R E SE T : AL L
W I L L NO T T U R N DE U’S
O N O R O FF VU 121 M 7 T H R O UG H M 13
AT A P R O BLE M O R C B T O R E SE T
M SG
23 P AX SE AT AUDI O VU 2000 C ABI N C O M SYS P E S
I NO P
AT A P R O BLE M O R C B T O R E SE T
M SG
SE AT VI DE O SYS R E SE T I NDI VI DU AL VI DE O
UNI T P R O BL E M S UNI T , SM AL L H O L E J U ST F W D
23 O F SC R E E N O N T H E SAM E
P AN E L I S R E SE T BUT T O N(O N-
O FF)
AT A P R O BLE M O R C B T O R E SE T
M SG
23 R M P F AUL T S T UR N AF F E C T E D R M P O F F
T H E N O N T O R E SE T
AT A P R O BLE M O R C B T O R E SE T
M SG
ACP FREQ’S WILL T R UN AF F E C T E D R M P O F F
NOT CHANGE T H E N O N T O R E SE T
23 I F NO H E L P , T H E N R E S E T :
FROM THE
STANDBY TO VU 49 B2 F M G C 1
ACTIVE WINDOWS VU 121 M 17 F M G C 2
RESET CB’S IN ACCORDANCE WITH
THE FOLLOWING PROCEDURE
AT A P R O BLE M O R C B T O R E SE T
M SG
C O M VH F CHECK:
23 E M I T T I NG F AUL T T R AN SM I T I O N K E Y O N AUDI O
P AN E L
SI DE ST I C K R ADI O SE L
H AND M I K E SE L NO T I N T R AN S
P O SI T I O N
I F NO T F O UND I N T R ANS P O S
R E SE T :
VU 49 G 9 VH F 1*
VU 121 L 4 VH F 2*
VU 121 L 5 VH F 3*
IF NO H E L P L E AVE C .B.
O P E N ( P U L L E D) * R E F F L I G H T
M ANU AL 7-58
AT A P R O BLE M O R C B T O R E SE T
M SG
23 VH F SY ST E M I NO P VU 49 G 9 VH F 1(SY S1)
VU 121 L 4 VH F 2(SY S2)
VU 121 L 5 VH F 3(SYS3)
AT A P R O BLE M O R C B T O R E SE T AT A P R O BLE M O R C B T O R E SE T
M SG M SG
ECAM MSG NO R E Q U I R E M E NT E NG I NE 1(2) E NG I NE (S) M UST BE SH UT
RELATED TO H O W E VE R , I F T I M E P E R M I T S G E NE R AT O R O N DO W N
24 24
TRIPPED GREEN R E SE T M AY BE AT T E M P T E D , L I NE ( G R E E N VU 122 T 26 G C U 1 (E N G 1)
CB’S I F UNSUC C E SF UL , DO NO T L I NE ) AND VU 122 T 27 G C U 2 (E N G 2)
M AK E A SE C O ND AT T E M P E T P AR AM E T E R S NO T RESET CB’S IN ACCORDANCE WITH
F L T M ANU AL 7-57 SH O W N THE FOLLOWING PROCEDURE
3-RESULTS OF POWER-UP TESTS 1-CONDITIONS OF POWER-UP TESTS INITIALIZATION
TESTS PASS:
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED 15MS.
A/C CONFIGURATION:
TESTS FAIL: (FAULT CONFIRMED) 1-A/C ON GROUND WITH ENGINES STOPPED
PROCEED TO MEL/TSM FOR
DEFERAL/TROUBLESHOOTIMG 2- PROGRESS OF POWER-UP TESTS
DURATION: 30 MS
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
200 MS 200 MS
A/C CONFIGURATION: A/C CONFIGURATION:
1-A/C ON GROUND 1-A/C ON GROUND
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: 30
5SEC MS BY C/B OR RESET PUSHBUTTON OFF THEN ON
A/C CONFIGURATION: A/C CONFIGURATION:
HYDRAULIC SYSTEM DE-PRESSURIZED HYDRAULIC SYSTEM DE-PRESSURIZED
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
TESTS FAIL: (FAULT CONFIRMED) TESTS FAIL: (FAULT CONFIRMED)
PROCEED TO MEL/TSM FOR DEFERAL/TS PROCEED TO MEL/TSM FOR DEFERAL/TS
ATA P R O BLE M O R C B T O R E SE T
M SG
27 F L I G H T C O N T R O L M UST P E R F O M E D W I N G T I P
F L AP S L O C K E D BR AK E (W T B ) R E SE T T H R O U G H
O UT M C DU P E R AM M 27-50-00 P G
209-211 (H YD M UST BE O F F )
AT A P R O BLE M O R C B T O R E SE T
M SG
FLT/CTL MSG VU 49 B6 SLT CTL & MONG SYS 1
27 WITH SLAT/FLAP VU 49 B7 FLP CTL 7 MONG SYS 1
FAULTS VU 121 R21 SLT CTL SYS 2
VU 121 Q21 FLP CTL & MONG
SYS 2
RESET C.B.’S IN ACCORDANCE WITH
THE FOLLOWING PROCEDURE
1-CONDITIONS OF POWER-UP TESTS INITIALIZATION
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-
>3SEC ENERGIZED:>200 MS
A/C CONFIGURATION:
A/C ON GROUND AND ENGINES STOPPED A/C CONFIGURATION:
A/C ON GROUND WITH ENGINES STOPPED AND NEW
2- PROGRESS OF POWER-UP TESTS DATE FROM CFDS
DURATION: 3 SEC
FLIGHT DECK EFFECTS: 2- PROGRESS OF POWER-UP TESTS
ECAM WARNING:F/CTL FCDC 1(2) FAULT DURING 3 SEC. DURATION: 2 SEC
FLIGHT DECK EFFECTS:
3-RESULTS OF POWER-UP TESTS ECAM WARMING: IF HYDRAULIC PRESSURIZED: FLT CTL
TESTS PASS: SLAT SYS 1(2) OR FLAP SYS1(2) FAULT
IF HYDRAULIC CIRCUIT NOT PRESSURIZED:NONE
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
TESTS FAIL: (FAULT CONFIRMED) 3-RESULTS OF POWER-UP TESTS
PROCEED TO MEL/TSM FOR DEFERAL/TS TESTS PASS:
ATA P R O BLE M O R C B T O R E SE T
M SG
29 P T U F AU L T S (NO T VU 121 N34 SO L VAL VE G /Y P TU
C AUS E D BY C AR G O
C AUS E D BY C AR G O
DO O R O P E R A T I O N
AF T E R E NG I NE S
S T AR TS)
ATA P R O BLE M O R C B T O R E SE T
M SG
29 P T U F AU L T S SE E NO T E S TH AT F O L L O W
R E G AR D I NG F AUL T S
F AUL T S C AUSE D BY C AR G O R E SE T WI T H E N G IN E S R UNN IN G :
DO O R O P E R AT IO N WI TH I N A)R E SE T M E SS AG E US IN G
30 SE C O NDS AF TE R SE C O ND M AS T E R /C AU T I O N P USH BU T TO N
E NG I NE S T AR T AND P T U S WI T C H E S
E C AM F AI L UR E M E SS AG E S B)SE L E C T H YD P AG E O N E C AM
N O T E : T H I S P R O C E DU R E C )SE L E C T Y H YD E L E C P M P O N
W I L L NO T R E SE T R E AL P T U D)SE L E C T Y H YD E L E C P M P O F F
F A I L U R E S O R H I DE R E A L E ) WAI T A M IN IM UN O F 30 SE C
F AUL T S I N TH E P TU SYS T E M F )C YC L E P TU S WI T C H F R O M O N TO
O F F TO O N
G )SE L E C T#1 E N G I NE G R E E N H YD
PM P OFF
H )SE L E C T#1 E N G I NE G R E E N H YD
PM P ON
I ) S E L E C T # 2 E N G I N E Y H YD P M P O F F
P TU SH O UL D O P E R AT E G R E E N TO
YE L L O W
J )SE L E C T#2 E N G IN E Y E L L O W H YD
PM P ON
K )E C AM SH O UL D BE NO R M AL
AT A P R O BLE M O R C B T O R E SE T AT A P R O BLE M O R C B T O R E SE T
M SG M SG
ANTI ICE L ( R ) IF THE WARNING OCCURS ON W I ND SH I E L D VU 122 X13 1(LEFT SIDE)
30 WINDSHIELD THE GROUND WITH OAT 30 H E AT F AU L T S VU 122 X14 WINDOW L HEAT
GREATER THAN 40 DEG C AND VU 122 W13 WHC 2 (RIGHT SIDE)
AC PACKS OFF, 5 MIN AFTER VU 122 W14 WINDOWS R HEAT
BOTH PACKS ARE SELECTED RESET C.B.’S IN ACCORDANCE WITH
ON, RESET CB’S THE FOLLOWING PROCEDURE
VU 121 X13 WHC 1 (LEFT SIDE)
VU 122 W13 WHC 2 (RIGHT SIDE)
RESET C.B.’S IN ACCORDANCE WITH
THE FOLLOWING PROCEDURE
1-CONDITIONS OF POWER-UP TESTS INITIALIZATION 1-CONDITIONS OF POWER-UP TESTS INITIALIZATION
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
5SEC 5SEC
A/C CONFIGURATION: A/C CONFIGURATION:
A/C ON GROUND A/C ON GROUND
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
TESTS FAIL: (FAULT CONFIRMED) TESTS FAIL: (FAULT CONFIRMED)
PROCEED TO MEL/TSM FOR DEFERAL/TS PROCEED TO MEL/TSM FOR DEFERAL/TS
AT A P R O BLE M O R C B T O R E SE T AT A P R O BLE M O R C B T O R E SE T
M SG M SG
FWD (AFT) DRAIN VU 2000 D1 FWD DRAIN MASTER ANT I I C E M SG S VU 49 D3 ANT ICE PROBES PHC 1
30 MASTER ECAM VU 2001 D5 AFT DRAIN MASTER 30 VU 122 Y12 ANTI ICE PROBES
MSG PHC2
VU 122 Y16 ANTI ICE PROBES
PHC 3
RESET C.B.’S IN ACCORDANCE WITH
THE FOLLOWING PROCEDURE
3-RESULTS OF POWER-UP TESTS 1-CONDITIONS OF POWER-UP TESTS INITIALIZATION
TESTS PASS:
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED 1SEC
TESTS FAIL: (FAULT CONFIRMED) A/C CONFIGURATION:
PROCEED TO MEL/TSM FOR DEFERAL/TS A/C ON GROUND
ATA P R O BLE M O R C B T O R E SE T
M SG
30 ANT I I C E P R O BE VU 122 Y14 P I T O T 2
M SG S SY ST E M #2 VU 122 Y11 ST AT I C 2
VU 122 Y13 AO A 2
VU 122 Y15 T AT 2
I F NO H E L P , T H E N R E SE T :
VU 121 N9 ADI R U 2 26 VAC & AO A
VU 121 N7 ADI R U 2 115 VAC
VU121 N5 ADI R U 2 28 VDC
VU 121 N11 ADI R U 2 P W R SH E D
ATA P R O BLE M O R C B T O R E SE T
M SG
30 ANT I I C E P R O BE VU 122 Z 16 P I T O T 3
M SG S SY ST E M #3 VU 122 Z 14 ST AT I C 3
VU 122 Z 15 AO A 3
I F NO H E L P , T H E N R E SE T :
VU 121 N8 ADI R U 3 26 VAC & AO A
VU 121 N6 ADI R U 3 115 VAC
VU 121 N4 ADI R U 3 28 VDC
VU 49 F 9 ADI R U 3 ST W G SP L Y
VU 121 N10 ADI R U 3 ST W G SP L Y
3-RESULTS OF POWER-UP TESTS
TESTS PASS:
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
TESTS FAIL: (FAULT CONFIRMED)
PROCEED TO MEL/TSM FOR DEFERAL/TS
AT A P R O BLE M O R C B T O R E SE T AT A P R O BLE M O R C B T O R E SE T
M SG M SG
DMC FAULT MSG VU 49 E11 EIS DMC 1 SPLY (SYS1 UNAB L E T O VU 49 E4 EIS PFD CAPT SWTG
31 EIS DMC 1,2 OR 3 VU 121 Q8 EIS DMC 2 SPLY(SYS) 31 SWI T C H D U VU 49 E2 EIS ND CAPT SWTG
VU 121 Q9 EIS DMC 3 SPLY (SYS3) VU 121 R5 EIS PFD F/O SWTG
VU 49 E10 EIS DMC 3 STBY SPLY VU 121 R6 EIS ND F/O SWTG
(SYS3) VU 49 E6 EIS ECAM DU UPPER
RESET C.B.’S IN ACCORDANCE WITH SWTG
THE FOLLOWING PROCEDURE VU 49 E6 EIS ECAM DU UPPER
SWTG
VU 121 R10 ECAM DU LOWER
SWTG
RESET C.B.’S IN ACCORDANCE WITH
THE FOLLOWING PROCEDURE
1-CONDITIONS OF POWER-UP TESTS INITIALIZATION 3-RESULTS OF POWER-UP TESTS
TESTS PASS:
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
>1SEC ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
A/C CONFIGURATION: TESTS FAIL: (FAULT CONFIRMED)
A/C ON GROUND PROCEED TO MEL/TSM FOR DEFERAL/TS
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
>1SEC 15 SEC
A/C CONFIGURATION:
A/C ON GROUND A/C CONFIGURATION:
A/C ON GROUND AND IR 1(2)(3) ROTARY BUTTON
2- PROGRESS OF POWER-UP TESTS (LOCATED ON THE ADIRS PANEL) SWITCHED TO OFF FOR
DURATION: 40 SEC 15 SEC, THEN TO NAV.
FLIGHT DECK EFFECTS:
ECAM WARNING: NONE 2- PROGRESS OF POWER-UP TESTS
NOTE: A DIAGONAL IS DISPLAYED ON THE THREE DURATION: 5 SEC
ASSOCIATED DISPLAY UNITS FLIGHT DECK EFFECTS:
ADIRS PANEL: “ON BAT” LEGEND ILLUMINATED FOR 5
3-RESULTS OF POWER-UP TESTS SEC, 2 SEC AFTER POWER-UP TEST INITIALIZATION.
TESTS PASS:
AIDS PROMPT RETURNS 3-RESULTS OF POWER-UP TESTS
TESTS PASS:
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
TESTS FAIL: (FAULT CONFIRMED) ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
PROCEED TO MEL/TSM FOR DEFERAL/TS TESTS FAIL: (FAULT CONFIRMED)
PROCEED TO MEL/TSM FOR DEFERAL/TS
AT A P R O BLE M O R C B T O R E SE T AT A P R O BLE M O R C B T O R E SE T
M SG M SG
ECAM PAGE(S) VU 49 F1 FWS FWC 1 SPLY SD AC 1 O R 2 VU 49 F2 SDAC 1 26VAC SYNC AC
31 LOCKED (I.E. VU121 Q7 EIS FWC 2 SPLY & QAR 31 F AU L T S ESS BUS
DOORS-WHEELS RESET C.B.’S IN ACCORDANCE WITH VU 49 F4 SDAC 1 SPLY
ETC.) THE FOLLOWING PROCEDURE VU121 Q3 SDAC1 26VAC SYNC AC
VU121 Q4 SDAC1 26VAC SYNC AC
VU 121 P4 SDAC 1 28 VAC
VU 49 F5 SDAC1&2 28VAC ESS
BUS
VU121 Q2 SDAC2 26VAC SYNC AC
VU121 Q5 SDAC2 26VAC SYNC AC
VU 121 Q6 SDAC 2 SPLY
VU 121 P3 SDAC 2 28 VAC
RESET C.B.’S IN ACCORDANCE WITH
THE FOLLOWING PROCEDURE
1-CONDITIONS OF POWER-UP TESTS INITIALIZATION 1-CONDITIONS OF POWER-UP TESTS INITIALIZATION
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
>1SEC 1 SEC
A/C CONFIGURATION:
A/C ON GROUND A/C CONFIGURATION:
A/C ON GROUND
2- PROGRESS OF POWER-UP TESTS
DURATION: 50 SEC 2- PROGRESS OF POWER-UP TESTS
FLIGHT DECK EFFECTS: DURATION: 5 SEC
ECAM WARNING: “EIS 1(2) FWS FAULT” FLIGHT DECK EFFECTS:
ECAM WARNING: “EIS 1(2) SDAC FAULT”
3-RESULTS OF POWER-UP TESTS
TESTS PASS: 3-RESULTS OF POWER-UP TESTS
AIDS PROMPT RETURNS TESTS PASS:
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
TESTS FAIL: (FAULT CONFIRMED) TESTS FAIL: (FAULT CONFIRMED)
PROCEED TO MEL/TSM FOR DEFERAL/TS PROCEED TO MEL/TSM FOR DEFERAL/TS
AT A P R O BLE M O R C B T O R E SE T AT A P R O BLE M O R C B T O R E SE T
M SG M SG
LGCIU FAULTS VU 49 C9 L/G LGCIU SYS1 32 L G C I U F AUL T S VU121 Q35 HYD LGCIU SYS 2
SYSTEM #1 VU 121 Q34 HYD LGCIU SYS 1 SYST E M #2 RESET C.B.’S IN ACCORDANCE WITH
32 THE FOLLOWING PROCEDURE
SPLY
RESET C.B.’S IN ACCORDANCE WITH
THE FOLLOWING PROCEDURE
1-CONDITIONS OF POWER-UP TESTS INITIALIZATION 1-CONDITIONS OF POWER-UP TESTS INITIALIZATION
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
1 SEC 1 SEC
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
TESTS FAIL: (FAULT CONFIRMED) TESTS FAIL: (FAULT CONFIRMED)
PROCEED TO MEL/TSM FOR DEFERAL/TS PROCEED TO MEL/TSM FOR DEFERAL/TS
ATA P R O BLE M O R C B T O R E SE T
M SG
32 BSC U F AUL T S I F A/C NO T M O VI N G T UR N NO SE
W H E E L ST E E R I N G AND ANT I -
SK D O F F T H E N O N, I F NO H E L P ,
SE E BSC U SY ST E M F AU L T S 1& 2
O N F O L L O W I N G P AG E S.
3-RESULTS OF POWER-UP TESTS
TESTS PASS:
ATA P R O BLE M O R C B T O R E SE T
M SG
32 BSC U F AUL T S VU 121 M 33 BSC U SYS1 SP L Y
SYST E M #1 VU 121 M 34 BSC U SYS1 C T L
RESET C.B.’S IN ACCORDANCE WITH
THE FOLLOWING PROCEDURE
1-CONDITIONS OF POWER-UP TESTS INITIALIZATION
A/C CONFIGURATION:
A/C ON GROUND
ATA P R O BLE M O R C B T O R E SE T
M SG
33 AP U AR E A L I G H T S VU 2001 F 6 AP U SVC L I G H T
I NO P
ATA P R O BLE M O R C B T O R E SE T
M SG
33 C ABI N L I G H T S R E SE T #2 C I DS T H R O U G H M C DU
W I L L NO T T UR N I F NO H E L P , T H E N R E SE T :
ON VU 121 M 8 T H R U M 13 DE U
ATA P R O BLE M O R C B T O R E SE T
M SG
33 C ABI N L I G H T S
C H E C K I F C O R R E C T L AM P
R E M AI NS O N
I NST AL L E D I F C H E C K C I D S
BR I G H T W H E N
T H R O UG H T H E P T P F O R F AI L E D
SE L E C T E D O F F O R
DE U AND R E SE T DE U I F
DI M P O SSI BL E .
NO T E : AL L L I G H T S
C O NT R O L L E D BY T H E F AI L E D
DE U W I L L R E M I AN O N BR I G H T
3-RESULTS OF POWER-UP TESTS
TESTS PASS:
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
1 SEC 1 SEC
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
TESTS FAIL: (FAULT CONFIRMED) TESTS FAIL: (FAULT CONFIRMED)
PROCEED TO MEL/TSM FOR DEFERAL/TS PROCEED TO MEL/TSM FOR DEFERAL/TS
AT A P R O BLE M O R C B T O R E SE T AT A P R O BLE M O R C B T O R E SE T
M SG M SG
VU 121 P6 EIS GPWS 28VDC W I ND SH E AR DE T ON THE GROUND MSG MAY
VU 121 P7 EIS GPWS 115VAC F AU L T OCCUR SPURIOUSLY, RESET
THIS PROBLEM MAY BE BY ILS FACS. REF FLT MANUAL 7-139
FREQ’S THAT ARE CLOSE AND ATTEMPT PUSHBUTTON
INTERFERING WITH THE GPWS SWITCHES RESET FIRST, IF NO
34 G P W S F AUL T S SYSTEM 34 HELP, THEN RESET
HAVE FLT CREW TAXI FWD 2-4 VU 49 B3 FAC 1 26VAC
FEET THIS WILL CAUSE THE VU 49 B4 FAC 1 28VDC
GPWS RECHECK ITSELF AND VU 121 M18 FAC 2 26VAC
MOST CASES CLEAR ALL VU 121 M19 FAC 2 28VDC
FAULTS RESET C.B.’S IN ACCORDANCE WITH
RESET C.B.’S IN ACCORDANCE WITH THE FOLLOWING PROCEDURE
THE FOLLOWING PROCEDURE
1-CONDITIONS OF POWER-UP TESTS INITIALIZATION 1-CONDITIONS OF POWER-UP TESTS INITIALIZATION
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
1 SEC >4 SEC
ATA P R O BLE M O R C B T O R E SE T
M SG
36 AI R R (L ) W I N G R E SE T AF F E C T E D BL E E D
BL E E D L E AK (O R P USH BUT T O N SW I T C H O N T O
AP U BL E E D L E AK ) O F F T O O N T O C L E AR M SG .
M SG AF T E R R E F . F L T M ANU AL BUL L E T I N
E L E C T R I C AL 95-01
T R AN SI E NT S
AR E A L I G H T S
I NO P
3-RESULTS OF POWER-UP TESTS
TESTS PASS:
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
1 SEC 1 SEC
ATA P R O BLE M O R C B T O R E SE T
M SG
38 T O I L E T W I L L N O T VU 2001 B1 VAC T O I L E T SY S L AV
F L USH VU 2001 B3 VAC T O I L E T SY S L AV
VU 2001 B4 VAC T O I L E T SY S L AV
ATA P R O BLE M O R C B T O R E SE T
M SG
38 G AL L E Y W AT E R
R E M O VE AF T G AL L E Y R I G H T
SYS NO I SE
C O F F E E M AK E R AND P L AC E
F I NG E R T I P O VE R DR AI N T U BE ,
T H I S W I L L R E SE AT T H E C H E C K
VAL VE
3-RESULTS OF POWER-UP TESTS
TESTS PASS:
HOW LONG THE COMPUTER MUST BE DE-ENERGIZED: HOW LONG THE COMPUTER MUST BE DE-ENERGIZED:
15 MS 1 SEC
ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED ABOVE MENTIONED FAULT MSG NO LONGER DISPLYED
TESTS FAIL: (FAULT CONFIRMED) TESTS FAIL: (FAULT CONFIRMED)
PROCEED TO MEL/TSM FOR DEFERAL/TS
PROCEED TO MEL/TSM FOR
DEFERAL/TROUBLESHOOTING
A320-232
F AUL T VE R I F I C AT I O N G UI DE
T H I S DO C UM E NT I S F O R T R AI NI NG P UR P O SE S
O NLY AND W I L L NO T BE R E VI SE D AL W AYS
R E F E R T O UA M ANUAL S F O R C UR R E NT
AP P R O VE D P R O C E DUR E S