Sei sulla pagina 1di 12

ACI 318M-11 RC Beam Ledge Design

Project :- Project Designed by:M. Abu Shady


Building :- Building Checked by:-M. Abu Shady
Element:- Element Date:- 29-Apr-18
Location:- Location

Input:
h = 350 mm fy = 420 MPa
bw = 600 mm fc' = 45 MPa Normal weight concrete λ = 1
Clear cover cc = 40 mm fyt = 420 MPa
d = 298 mm Bearing Pad Details
av = 235 mm Continuous load (Weff =min(bw, 1m))
af = 281 mm W = 400 mm
L = 300 mm
Vservice = 225 KN S = 1000 mm
Vu = 329 KN c = 500 mm
Nuc = 66 KN Nuc min. = 0.2 Vu, Clause 11.8.3.4
�_𝒖 = �_𝒖 𝒂_(𝒇 ) + 𝑵_𝒖𝒄 ("h−d"95.9) = KN.m Clause 11.8.3
av/d= 0.79 < 1, Design Corbel using Clause 11.8.3, 11.8.4 as per Clause 11.8.1
� = 0.75 Clause 11.8.3.1
1- Calculation of Primary tension reinforcement Asc
1.1- Calculation of shear-friction reinforcement Avf
𝑾_(𝒆𝒇𝒇 𝒇𝒓)=𝒎𝒊𝒏. 𝒐𝒇{█(𝑏_𝑤@𝑊+4𝑎_𝑣@𝑆@2𝑐)┤
= 600 mm
= 1340 mm PCA Notes, p15-5
= 1000 mm
= 1000 mm
∴ 𝑾_(𝒆𝒇𝒇 𝒇𝒓)
= 600 mm For Continuous load Weff =min(bw, 1m)
)=𝒎𝒊𝒏. 𝒐𝒇{█(� 𝟎.𝟐𝒇_𝒄^′ 𝑾_(𝒆𝒇𝒇 𝒇𝒓) 𝒅@�(𝟑.𝟑+𝟎.𝟎𝟖𝒇_𝒄^′)𝑾_(𝒆𝒇𝒇 𝒇𝒓)KN
= 1204.9 𝒅@�Clause
𝟏𝟏𝑾_(𝒆𝒇𝒇 𝒇𝒓) 𝒅)┤
11.8.3.2.1
= 923.7 KN Clause 11.8.3.2.1
= 1472.6 KN Clause 11.8.3.2.1

∴ ��_(𝒏 𝒇𝒓𝒊𝒄𝒕𝒊𝒐𝒏 𝒎𝒂𝒙. )


= 923.7 KN > Vu, Ok, Clause 11.8.3.2.1

Friction Surface Concrete placed against hardened concrete not intentionally roughened Clause 11.6.4.3

�_𝒗𝒇=�_𝒖/(� 𝒇_𝒚𝒕 𝝁)
� = 0.6 Clause 11.6.4.3 = 1741 mm2 Clause 11.6.4.1

1.2- Calculation of Moment reinforcement Af


𝑾_(𝒆𝒇𝒇 𝒎𝒐𝒎𝒆𝒏𝒕)=𝒎𝒊𝒏. 𝒐𝒇{█(𝑏_𝑤@𝑊+5𝑎_𝑓@𝑆@2𝑐)┤
= 600 mm
= 1805 mm PCA Notes, p15-5
= 1000 mm ∴ 𝑾_(𝒆𝒇𝒇 𝒎𝒐𝒎𝒆𝒏𝒕)= 600 mm For Continuous load Weff =min(bw, 1m)
= 1000 mm
∴�_𝒇=�_𝒖/(� 𝒇_𝒚 "0.8d" )
�_𝒖 = ��_𝒏 = � �_𝒇 𝒇_𝒚 (d - 𝒂/𝟐 ) ≈ � �_𝒇 𝒇_𝒚 (0.8d) = 1279 mm2 Clause 11.8.3.3 & PCA Notes, p15-5

1.3- Calculation of Tensile force reinforcement An


�_𝒏=𝑵_𝒖𝒄/(� 𝒇_𝒚 )
= 209 mm2 Clause 11.8.3.4

1.4- Calculation of Primary tension reinforcement Asc

ACI 318M-11 RC Bracket and Corbel Design Page 1 of 12 M.A.S


ACI 318M-11 RC Beam Ledge Design
Project :- Project Designed by:M. Abu Shady
Building :- Building Checked by:-M. Abu Shady
Element:- Element Date:- 29-Apr-18
Location:- Location

�_(𝒔𝒄 )=𝒎𝒂𝒙. 𝒐𝒇{█(█(�_(𝒇 = 1488 mm2 Clause 11.8.3.5


) "+ " �_(𝒏 )@(2�_(𝒗𝒇 ))/3
"+ " �_(𝒏 ) )@0.04 (𝒇_𝒄^ = 1369 mm2 Clause 11.8.3.5
′)/𝒇_𝒚 〖 𝒃〗 _(𝒘 ) 𝒅)┤

= 765 mm2 Clause 11.8.5 ∴�_𝑺𝒄= 1488 mm2 Use 4 T 25

ACI 318M-11 RC Bracket and Corbel Design Page 2 of 12 M.A.S


ACI 318M-11 RC Beam Ledge Design
Project :- Project Designed by:M. Abu Shady
Building :- Building Checked by:-M. Abu Shady
Element:- Element Date:- 29-Apr-18
Location:- Location

2- Calculation of Shear horizontal tie reinforcement Ah


�_� = 0.5 (�_𝑺𝒄 〖 − �〗 _𝒏 ) mm2
= 640 Clause 11.8.4

Use 2 Row T 16 Stirrups with 2 Legs OR combine with Asc as per PCA Notes, figure 15-10
Distribute Ah uniformly within (2/3)d adjacent to primary tension reinforcement "Asc", Clause 11.8.4 & Fig. R11.8.2
for small ledge height h, Asc+Ah could be added together and placed as top reinforcement as per PCA Notes, figure 15-10
3- Punching Shear check
𝒃_𝒐 = 𝒎𝒊𝒏. {█(𝑾+𝟐𝑳+𝟐𝒅_𝒇@𝑾+𝑳+𝒅_𝒇+𝒄−𝑾/𝟐)┤
=1595 mm PCA p15-6, for interior bearing load
=1298 mm PCA p15-6, for bearing load @ Ledge end
〖 ∴𝒃〗 _𝒐 =1298 mm
𝝓�_𝒏=𝝓𝟎.𝟑𝟑𝝀√( 〖𝒇 641 KN >Vu, OK
′〗 _𝒄 ) 𝒃_(𝒐 ) 𝒅_𝒇=

4- Calculation of hanger reinforcement


Hanger spacing s= 150 mm
�_(𝒗 �𝒂𝒏𝒈𝒆𝒓)=𝒎𝒂𝒙. 𝒐𝒇{█((�_𝒖 𝒔)/
(� 𝒇_𝒚𝒕 𝑺)@(�_𝒔𝒆𝒓𝒗𝒊𝒄𝒆 𝒔)/(𝟎.𝟓𝒇_𝒚𝒕 = 157 mm2
(𝑾+ 〖𝟑𝒂〗 _𝒗)))┤
= 145 mm2 ∴�_(� ������)=157 mm2 Use 2 T 12

5- Check of Concrete bearing strength Pnb


Bearing size WxL = �_𝒃= 0.65 Clause 9.3.2.4

�_1= WL = = 120000 mm2�_𝒃 𝑷_𝒏𝒃 = �_𝒃 0.85𝒇_𝒄^′ �_𝟏 =2983.5 KN > Vu ,OK, Clause 10.14.1

7- ACI detailing requirements, Clause 11.8.6

ACI 318M-11 RC Bracket and Corbel Design Page 3 of 12 M.A.S


ACI 318M-11 RC Beam Ledge Design
Project :- Project Designed by:M. Abu Shady
Building :- Building Checked by:-M. Abu Shady
Element:- Element Date:- 29-Apr-18
Location:- Location

ACI 318M-11 RC Bracket and Corbel Design Page 4 of 12 M.A.S


ACI 318M-11 RC Beam Ledge Design
Project :- Project Designed by:M. Abu Shady
Building :- Building Checked by:-M. Abu Shady
Element:- Element Date:- 29-Apr-18
Location:- Location

�_𝒔𝒄+ �_� = 2128 mm2 Use 5 T 25


for small ledge height h, Asc+Ah could be added together and placed as
top reinforcement as per PCA Notes, figure 15-10

ACI 318M-11 RC Bracket and Corbel Design Page 5 of 12 M.A.S


rev 0.01

Detailed calculation for


ous load Weff =min(bw, 1m)
A_f=(0.85𝐖_(𝐞𝐟𝐟 𝐦𝐨𝐦𝐞𝐧𝐭) df_c^′ (1−√(1 − 〖 4M 〗 _u/(ϕ1.7f_c^′ 𝐖_(𝐞𝐟𝐟 𝐦𝐨𝐦𝐞𝐧𝐭) d^2 ))))/f_y

ACI 318M-11 RC Bracket and Corbel Design Page 6 of 12 M.A.S


rev 0.01

/Weff moment

ACI 318M-11 RC Bracket and Corbel Design Page 7 of 12 M.A.S


rev 0.01

ause 10.14.1

ACI 318M-11 RC Bracket and Corbel Design Page 8 of 12 M.A.S


rev 0.01

ACI 318M-11 RC Bracket and Corbel Design Page 9 of 12 M.A.S


rev 0.01

/Weff moment

ACI 318M-11 RC Bracket and Corbel Design Page 10 of 12 M.A.S


References
1- ACI 318M-11, Clause 11.8 Provisions for brackets and corbels
2- PCA Notes on ACI 318M-11, Chapter 15, Brackets, Corbels and Beam Ledges
3- PCA Notes on ACI 318M-11, Example 15.3—Beam Ledge Design
Rev. History
Rev 0.01
Remove the protection from cell C12
Correct the equation of a_f in cell B13 to be =a_v+cc+d_Av_hanger/2

Potrebbero piacerti anche