Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
4. All excavation shall be carried out to the profile and levels shown
Steepest stable slope in the drawing. by proven methods. All loose material shall be
500 scaled out/removed. Before lowering the excavation in the shaft,
3300 surface slopes shall be adequately made stable by shotcrete
Bore Hole
75mm thick shotcrete /chainlink fabric and rock bolts as per site requirement in
500
consultation with the Geologist.
Flow
ISMB-150x80 @ 500 c/c be made along the periphery of the shaft at the surface as well as
within the shaft..
3.30m dia Head Race Tunnel
6. All weak discontinuties shall be removed at least thrice the the
4 thickness and filled back by concrete. the rock mass shall be
2097.927
2 Minimum 5.0 m
consolidated grouted up to a minimum depth of 5.00 m or as
25mm dia rock anchors, 3.0m long
directed by the Geologist. Grouting pressure may range from
@ 1.50m c/c (staggered) CL of Surge Shaft
Railing
1500 150mm thick M:15 concrete
Drain 300x300
500 1500
7. The holes for contact grouting shall be 30 degree apart
Reach
EL. 2085.00
circumferentially at a vertically spacing of 3.0 m staggered to
7000
Drain 300x300 previous ring of holes. Grouting pressure shall be about 2.0
Portal
500
500
8. Before laying the structural concrete surface shall be properly
25mm dia rock anchors, 3.0m long cleaned and made level.
@ 1.50m c/c (staggered)
Max. water level 2083.50
9. The grade of concrete shall be M:30 grade unless otherwise
specified having 28 days characterstic compressive strength not
less than 30 MPa.
10. Maximum size of aggregate shall be 20mm and all aggregate shall
conform to IS:383.
2 2
00
11. All concrete works shall conform to Latest Ed. of IS:456. While
5
R3 placing concrete at low ambient temperature, guidelines and
specifications contained in IS: 7861 (part-II) shall be followed.
Varies
12. Ordinary portland cement Grade - 43 shall conform to IS : 8112.
Varies from 500 to 750 E-50244.436
N-50640.284 13. Water to be used for mixing shall be free from deleterious
25mm dia resin grouted rock anchors,
3.0m long in sound rock @ 1.50m c/c (staggered) substances.
7000
FBL. 2057.495 14. Concrete shall be properly compacted and fully vibrated around
25mm dia resin grouted rock anchors, 3.0m reinforcement and into the corners of formwork, segregation
long in sound rock @ 1.50m c/c (staggered)
shall be avoided.
direction shall be decided by Geologist for
Varies effective performance.
15. Cold joints shall be avoided in subsequent layers of concrete.
Before placing subsequent layers of concrete, the surface of
# 16 @ 100 c/c # 16 @ 100 c/c
previous poured layer shall be adequately made rough when the
Y concrete is green after attaing its set time and properly treated. It
# 16 @ 100 c/c # 16 @ 100 c/c
shall be ensured that the two layers behaves as monolithic.
X
M:30
M:30
17. Non staining steel shall be used for form work. Forms shall be
3.30m dia Head Race Tunnel properly cleaned and oiled before concreting.
500 3 18. The structure shall be tied to rock by 25 dia anchors 3000 long in
MDDL. 2064.125 750 sound rock and 1200 in concrete, the spacing shall be 1500 c/c
EL. 2063.925 staggered.
1732
# 12 @ 100 c/c
19. Lift of concrete shall be restricted to 1.20m.
3.40m dia Penstock Tunnel
3300
Flow
7000
2860
6400
3400
5-rows of 32mm dia resin grouted rock anchors, # 16 @ 100 c/c EL. 2059.195 C/L of Penstock
2085
500
1 SURGE SHAFT