China Sinogy Electric Engineering Co.,Ltd.

Company Profile

13th, April,2015
Perfect projects
for better electric power
Introduction of CSEEC

Produce and transmit cleaner energy – the mission of


CSEEC motivates us to continuously open up new
ways and forge ahead with determination, thus to
develop CSEEC into an outstanding and well-known
enterprise in the electric power engineering industry.
ABOUT US

 CSEEC is an engineering company engaged in electric power engineering design, engineering management,
project EPC, electric power investment and operation.

 It successively undertakes design and EPC of dozens of thermal power plant projects, transmission and
distribution projects, wind power electricity generation projects and PV solar projects.

 It possesses Class-A design aptitude certificate of electric power industry (thermal power), engineering
consulting certificate and external management aptitude certificate, and passes Quality, Environment and
Occupation Health Safety Management System certification.

70 wind power projects 70 thermal power projects 70 solar power projects


ABOUT US

 There is more than 560 staff, in which over 480 are engineering technicians in various disciplines,
including 11 senior engineers of professor level, 91 senior engineers, 286 engineers and 75 certified
engineers.

 Projects concerning engineering design, engineering management and EPC provided by


CSEEC are distributed in Southeast Asia, Central Africa and South America.

Engineering technicians of CSEEC account for 86% of the total number of staff

11 senior engineers of
professor level

286 engineers 91 engineers

170 others
ABOUT SINOMACH

 SINOMACH, founded in Jan. 1997, is a national key enterprise directly governed by the central
government and a World’s Top 500 enterprise.

 SINOMACH is a large state-owned enterprise group with largest industrial scale, widest coverage, most
complete business chain and strongest R&D ability in the China mechanical industry.

2013
It was reorganized
2012 in July 2013, and
The operating became one of 53
1997
278th
income rank top in State-owned key
SINOMACH China mechanical enterprises directly
was founded
industrial enterprise governed by the
for years. central government. World’s Top
500
Professional committee of

Audit and internal control


ORGANIZATION STRUCTURE

committee Audit & Legal Dept.


the BOD

Strategy and investment


Strategic Development Dept.
committee
Nomination and Bidding & Procurement Dept.
compensation committee
Capital Management Dept.
Board of supervisors

Vice-president
Operation and

Asset & Finance Dept.


management
committee

Engineering Dept.
Design Business Dept.
Board of shareholders

Board of directors

Overseas Dept. Branch 2


Chairman of the
board

CEO

Overseas Dept. Branch 1


Market Development Dept.
Operation & Planning Dept.
Safety Supervision Dept.
Technical management group

Safe production management


Project control management

Bidding management group Business Admin. Dept.


group

group
Human Resource Dept.
Secretary of the
Admin. Management Dept.
board
Securities Dept.
BUSINESS AREA

 CSEEC commits to provide perfect and professional integrated service of electric power engineering
for the customers, and takes electric power engineering planning and consultation, design, project
management and EPC as business core to fully expand domestic and overseas markets and actively
carry out energy investment.

Electric power engineering design

Electric power engineering


planning & consulting Electric equipment integration

SERVICE
SCOPE

Electric power engineering


projects management
Financing support

Electric power projects EPC


CORPERATE GOVERNANCE

 Following the corporate mission of Advanced management, Technical innovation, Credible


service, Harmonious development, CSEEC thoroughly practice the management principle of Two
management, Three first-rate, Four targets, Five control in the enterprise business operation and
engineering project, which efficiently promotes the enterprise and project’s management level.

• Quality Control
• First-rate Design • Set Platform for Employees • Progress Control
• First-rate Construction • Value for Customers • Safety Control
•Contract Management • Management • Profit for Shareholders • Cost Control
•Information Management • First-rate Technical Index • Responsible for Society •Environmental Index Control

Two Three Four Five


Management First-rate Targets Control
QUALIFICATION & CAPABILITY

 CSEEC has the capability of engineering design, consulting, project management and equipment
integration, as well as the capability to undertake large-scale thermal power projects , renewable energy power
projects and power transmission & transformation projects’ design and EPC.

 CSEEC holds the grade A Engineering Design Qualification Certificate of National Electric Power Industry,
the Qualification Certificate of Electric Power EPC, the Work Safety License, the Qualification Certificate of
National Engineering Consulting Unit, the Qualification Certificate of Overseas Project Contracting of the
People ’ s Republic of China, the Design License of Special Equipment (Pressure Piping), the Qualification
Certificate of Electric Power Installation, Maintenance, and Commissioning, and the Qualification Certificate of
Energy Saving Assessment Grade A Unit. CSEEC has also got the Quality Management System Certification,
the Environmental Management System Certification, the Occupational Health and Safety Management
System Certification, and the Hi-tech Enterprise Certification.
AWARDS & HONORS

 CSEEC is a member of National Pipeline Fittings Standardization Technical Committee, the major
drafter who formulated the national standards GBT 28707-2012 Disc Spring Supports and Hangers and
GB/T 17116.1~3 series Pipe Supports and Hangers, etc.

 In recent years, CSEEC has obtained 70 utility model patents, and 7 invention patents, such as Large-
scale Full Gas Boiler Combustion System, Self-standing Multi-tubular Steel Stack, An Experimental System
for Simulating Corrosion of Materials of Primary Circuits of Nuclear Power Plants, An Experimental System
for Simulating Flow Accelerated Corrosion of Liquid Phases of Secondary Circuits of Nuclear Power Plants.

 Projects of design, management and EPC which undertook by CSEEC are awarded with provincial, city
and national level professional awards.

400 7 70

400 important electric power projects 7 invention patents 70 utility model patents
Engineering & Projects

With an advanced and practical engineering management mode and a


group of experts on electric power industry, CSEEC has successively
completed hundreds of power plants and transformer substations on
design, technical consultation and EPC both in domestic and overseas.
CSEEC has accumulated rich experiences on design, consultation,
construction management & operation management concerning thermal
power units, heat supply units, gas and steam combined cycle power
generator sets, biomass power generation, and transmission and
transformation projects, and forms a complete set of integrated, scientific
and practical engineering management system
ENGINEERING & PROJECTS
- PLANNING & CONSULTING

CSEEC provides customers with professional planning and consulting services in electric power engineering
and new energy sources. CSEEC has successively completed planning tasks, such as the Medium- and Long-
term Development Planning for Biomass Power Generation of Shanxi Province and the planning for power
generation of EREN ENERJI, Turkey; consulting tasks, such as the prefeasibility study report of South Tianjin
Harbor Economic Area 2×200MW Combined Cycle Power Station Project; the feasibility study report of Suzhou
Industrial Park Gas-Steam Combined Cycle Power Generation Project; the feasibility study report of Pakistan
Jerruck 3 ×150MW Coal Power Project; the feasibility study report of Guangdong Dongguan Waste to energy
Project.

Planning & Consulting


ENGINEERING & PROJECTS
- PROJECT MANAGEMENT& EPC

With the advantages in human resources and technology, by virtue of rich experiences in project management,
advanced organization processes, and the spirit of Dedication, Professionalism, and Concentration, CSEEC takes
projects EPC as the core business, and successively completed a batch of EPC projects including Baoying Biomass
Power Generation Project, Chongqing Zhongji Longqiao Thermal Power Co., Ltd. Cogeneration Project, Captive
Thermal Power Plant Extension Project of Shandong Chenming Paper Holdings Limited, Malaysia Sabah KIMANIS
100MW Combined Cycle Power Station EPC Project, etc.

Meanwhile, by making the most of its technical advantages, CSEEC implements a series of cooperative project
management, having successively realized the management of such projects as Vietnam Guangning Thermal Power
Co., Ltd. 4 × 300MW Power Generation Project, Tianjin Binhai Energy & Development Co., Ltd. Heat Source Power
Plant Project, Tianjin Airport Industrial Park Thermal Power New Project, etc.

P R O J E C T
MANAGEMENT
& E P C
ENGINEERING & PROJECTS
- PROJECT MANAGEMENT& EPC

Chongqing Zhongji Longqiao Thermal Power Co., Ltd.


1×300MW+2×50MW Cogeneration Project

This project lies on the south bank of Yangtze River, western suburbs of
Fuling District, Chongqing.

This EPC project consists of a 2×450t/h circulating fluidized bed boiler unit, a
2×50MW backpressure generator unit, a 1×1100t/h circulating fluidized bed
boiler unit, and a 1×300MW extraction condensing turbine generator unit.

The project was commenced on June 1, 2012 and put into commercial
operation on December 30, 2013.

Malaysia Sabah 100MW Combined Cycle Power Station Project

This project locates in Sabah, Malaysia.

This EPC project is a gas-steam combined cycle unit which is composed


of 2 PG6581B gas turbines, 2 HRSGs, and 1 steam turbine generator,
the total capacity is 100MW.

The Project achieve the commercial operation in March 2014.

15
ENGINEERING & PROJECTS
- PROJECT MANAGEMENT& EPC

Shandong Rizhao Lanshan District Centralized Heat Supply Project

This EPC project consists of a 2×1025t/h subcritical pulverized coal fired boiler,
a 2×300MW subcritical extraction condensing generator unit, balance of plant
around the factory area, and a circulating seawater cooling system outside the
factory, etc.

It takes 13 months to complete the process from contract signing to grid-


connected power generation of the two units.

Captive Power Plant Project of Zhanjiang Chenming Pulp&Paper Co., Ltd.

This EPC project involves a 1 × 600t/h sub-high temperature and sub-high pressure
alkali recovery boiler, a 3 × 280t/h sub-high temperature and sub-high pressure
circulating fluidized bed boiler unit, a 2 × CC60-8.2/1.3/0.7 dual extraction steam
turbine generator unit, and a 1 × B60-8.2/0.7 back-pressure extraction steam turbine
generator unit.

By consuming all the bark, sawdust and sludge while producing the pulp and paper,
the project will reduce the consumption of coal and sulfur dioxide emission, and also
reuse the alkali. It can save 6500000t standard coal per year, directly save costs
about 546 million RMB.
ENGINEERING & PROJECTS
- PROJECT MANAGEMENT& EPC

Captive Power Plant Extension Project of Shandong Chenming Paper


Holdings Limited

As a cogeneration expansion project, the plant is built to supply power and


steam for projects inside the HQ of Chenming Group.

The project involves the construction of one 670t/h high temperature and high
pressure circulating fluidized bed boiler and one 155MW dual-extraction steam
turbine generator unit as well as a white mud wet-type desulfurizer.

It was commenced on January 9, 2011 and passed the 168-hour test run on
March 22, 2013.

Captive Thermal Power Plant EPC Project of Jilin Chenming


Environmental Protection Relocation & Industry Upgrading Project

This EPC project involves a 3 × 130t/h high temperature and high pressure
circulating fluidized bed boiler and a 2 × 25MW extraction condensing
generator unit.

The project was commenced on November 9, 2011 and put into production
at the end of 2013. It has been checked and accepted by Chenming Group,
and deemed as one of the best infrastructure project in their Group.
ENGINEERING & PROJECTS
- PROJECT MANAGEMENT& EPC

Fushun Mining Group Co., Ltd. Thermal Power Plant Heat Supply Transformation
Project

The project provide the heat supply capacity of 494MW, with the main construction
contents including 2 Hot water circulating fluidized bed furnace, inside the heat supply
station there are five 52,330kW absorption-type lithium bromide low temperature water
source heat pumps and five plate-type water-water heat exchangers which are arranged
in the newly-built primary heat supply station.

The project is to supply heat for 300,000 persons living in middle Fushun in winters, and
it was listed as a 2012 key livelihood project by the People’s Government of Fushun.

Rizhao Steel Holding Group Co., Ltd. Shock Load Auto-Balance System
EPC Project

This EPC Project is the second EPC project which CSEEC undertakes in Rizhao
after acquired the Lanshan District Centralized Heat Supply EPC Project.

It is located inside the factory area of Rizhao Steel Holding Group Co., Ltd.,
involving a 4×40MW heat recovery unit which is the internal power grid shock load
compensation facility and the heat recovery facility of Rizhao Steel.

The project was put into operation at the end of September 2013.
ENGINEERING & PROJECTS
- PROJECT MANAGEMENT& EPC

Liaoning Fushun Thermal Power Plant "Developing Large Units and


Controlling Small Ones“ EPC Project

The project involves a 2×1025t/h circulating fluidized bed boiler unit and a
2×300MW extraction condensing generator unit.

This project is the second project that CSEEC undertakes in Fushun. It


employs the domestic biggest blending combustion oil shale circulating
fluidized bed boiler. Two sets of the engineering will conduct grid-connected
generation in June 2015 and Sep. 2015 as scheduled.

Tianjin Binhai Energy & Development Co., Ltd. No. 4 Heat


Source Power Plant Project

The phase I of this project includes a 3×116MW circulating fluidized


bed hot-water boiler unit. The project adopts the streamline self-
standing multi-tubular steel stack of the domestically initiative
combined desulfurizing absorption tower, which is energy-saving
and space-saving. The combined stack apparatus has been granted
with the utility model patent.

This project was awarded the “ 2009 Tianjin Construction


Engineering- Structure Haihe Cup ” and the “ 1st Prize of 2011
Shanghai Excellent Engineering Exploration & Design Project”.
ENGINEERING & PROJECTS
- PROJECT MANAGEMENT& EPC

Vietnam Guangning Thermal Power Co., Ltd. 4 × 300MW Power


Plant Project

This project is built under the joint investment of EVN, VINACOAL,


and VINACONEX.

Vietnam Guangning Thermal Power Co., Ltd. built a 4× 300MW coal-


fired heat supply unit in 2 phases: the phase I project includes the new
construction of a 2×300MW coal-fired heat supply unit and the phase
II project involves a 2×300MW coal-fired unit.

Henan Jinkai Investment Holding Group 1M-ton Liquid Fertilizer


and 600,000-ton Compound Fertilizer Supporting 2×480t/h Coal-
Fired Boiler Construction and Steam Supply Project

This project is located in Kaifeng, Henan, involving a 2 × 480t/h high


temperature and high pressure circulating fluidized bed boiler unit
and its supporting flue gas denitration facilities and desulfurization
facilities.

The two units are expected to put into commercial operation on July
1, 2015 and September 1, 2015.
ENGINEERING & PROJECTS
- PROJECT MANAGEMENT& EPC

Baoying Biomass Power Generation Project

This project is undertaken by CSEEC as an EPC project. The project has


been in stable operation since put into production. The daily single-machine
biomass consumption approximates 500 tons and the annual biomass
consumption is about 150,000 tons.

After the biomass technology transformation was implemented, the project


annually utilizes 200,000-300,000 tons of straw-type farmland waste, saving
100,000-150,000 tons of raw coal, efficiently reduced the emission of sulfur
dioxide and carbon dioxide, and brought about obvious environmental
benefits.

100MWp photovoltaic power generation project in Jinchuan


District of Jinchang Disheng

This project was built with combination of 250Wp and 300Wp


high power modules, and a 110kV switch yard, and is connected
to the local grid with one 110kV line.

The project was completed within only 86 days. It’s high standard
construction quality was ensured with rapid work progress, this
obtaining the high appraisal from the owner, as another example
of “CSEEC speed”.
ENGINEERING & PROJECTS
- PROJECT MANAGEMENT& EPC

The EPC project for phase I of Turpan 20MWp photovoltaic power


plant of Datang

This project is located at about 15km to the northeast of Turpan, Xinjiang. It


is invested and constructed by Datang Xinjiang Clean Energy Co., Ltd., with
our Company as the EPC contractor, who is in charge of the project
management, equipment procurement, engineering design and connection
to grid for the project.

The project was built with 250Wp high power cell assemblies, with output
voltage level of 35kV. The project was completed in four months, and it was
connected to the grid for power generation on Dec. 20, 2013.

Fuling 220kV Qingxi Power Transmission And Transformation


Project in Chongqing

This project consists of “one substation and two lines”: the 220kV Qingxi
Substation, the 220kV Longqiao – Qingxi double-circuit power
transmission line and the 220kV Qingxi – Dalang Aluminum (Pingyuan)
single-circuit power transmission line.

The lines of this project have a total length of about 22.0km, crossing the
power and communication lines 118 times, and the Yangtze River twice. It
overcomes barriers of complicated landform and geological conditions,
difficulties in land expropriation and project coordination before completion.
ENGINEERING & PROJECTS
- ENGINEERING DESIGN

CSEEC has completed the work related to design and technical consulting for scores of power plants and
substations, including the design of a batch of heat supply and power generation projects, and plenty of
biomass power generation projects. CSEEC has accumulated rich experience in design of various power
plants at home and aboard and has raised the working capability of the designing team.

ENGINEERING DESIGN
ENGINEERING & PROJECTS
- ENGINEERING DESIGN

Inner Mongolia Sulige Gas-Fired Power Plant

This project is the first eco-friendly thermal power plant in Inner Mongolia, located in
Uxin Banner, Erdos, and it’s one of the key projects of Inner Mongolia Power (Group)
Co., Ltd.

The main equipments include two 126MW gas turbines, two dual pressure HRSGs,
and two 60MW dual pressure steam turbine generators. The gas turbines adopt the
full-indoor arrangement form. The HRSGs adopt the bounding fully-enclosed
structure, so that they can adapt to the sandy environment and cold weather in winter
of the local area and the boiler heat losses can be reduced. The PG9171E gas
turbine is the first home-made E-class gas turbine at home, which is introduced and
produced by Nanjing Automobile and operates successfully in inland cold and desert
areas for the first time.
Venezuela's New Center Power Plant Project

The New Center Power Plant is located in CARABOBO, Venezuela, 220km


away from Capital of Venezuela. The project has a 4 × 192.625MW (ISO
operation condition, Siemens SGT6-5000F) gas turbine unit. The turbines
perform single cycle operation and set up outdoors. The turbines take diesel
and natural gas as fuel, the former being the main fuel and the latter standby
fuel.

The project is built with the joint investment of State Grid Corporation of
Venezuela and PDVSA and was put into commercial operation in late 2012.
ENGINEERING & PROJECTS
- ENGINEERING DESIGN

Datang Lubei Power Generation Co., Ltd. Phase I (2×330MW) Project

This projrctis established with the joint investment of China Datang Corporation
and Shandong Lubei Enterprise Group General Company. Its phase I project
involves a 2×330MW thermal power generating unit with heat supply and was
put into production in late 2009.

It is a 300MW level cogeneration project, with the single-machine steam


extraction capacity up to 400t/h. The steam extracted is provided to Shandong
Lubei Enterprise Group General Company. The project is encouraged by
national energy policies.

Guodian Liaocheng Power Plant Phase II (2×600MW) Project

As one of the national key construction projects under the “ 10th five-
year plan ” , this project is established with the investment of China
Guodian Corporation and includes a 2×600MW supercritical generator
unit. The overall design is undertaken by Shandong Electric Power
Engineering Consulting Institute Corp. Ltd. and the design of the boiler
by CSEEC. The project was put into production in late 2009.
ENGINEERING & PROJECTS
- ENGINEERING DESIGN
Ningbo Steel Co., Ltd. Thermal Power Plant 2 × 135MW Full Gas
Complementary Energy Power Plant Project

The main equipment of the project contains two 440t/h full gas-fired super-
high pressure reheat boilers and two 135MW steam turbine generator units.
The project takes Ningbo Steel ’ s low heating value blast furnace gas
(3,100kJ/m3) as main fuel, capable of annually recycling 4.9 billion cubic
meters of blast furnace gas which is equivalent to 620,000 tons of standard
coal. The project realizes gradient utilization and recycle of energy sources
inside Ningbo Steel Co., Ltd.

This project is a key project of Zhejiang Province. The plant was completed
and put into production in July 2011.

Suzhou Industrial Park 2×180MW Gas-Fired Thermal Power Project

This project is an eco-friendly thermal power plant. Located in the south of


Suzhou Industrial Park, the plant is equipped with two “ one-drag-one ”
PG9171E gas-steam combined cycle thermal power units.

The main equipment of the project includes two 126MW gas turbine, two
dual pressure waste heat boiler, two dual pressure of 60MW steam turbine
generator; Gas turbine which setup outdoor waste heat boiler adopting
semi-closed structure. PG9171E gas turbine is brought in and
manufactured by Nac Group, it is now localization of E gas turbine
equipment in China.
ENGINEERING & PROJECTS
- ENGINEERING DESIGN

Huaneng Jilin Tongyu Wind Power Concession Project

The project is one of the 2004 national concession projects, with the gross
installed capacity of 200MW. The project is divided into south and north
areas, setting up 133 FL77/1500kW wind power generator sets. The
project’s construction drawings and the project debugging were completed in
a tightened period with good benefits.

It was rated by China Electric Power Construction Association as the


“Projects Putting into Production upon Reaching the Standard in 2008” and
won the “2009 Annual Quality China Electric Power Engineering Award”.

Hebei Danjinghe Wind Farm Project

The Project is located in Zhang Bei Bashang grassland, the wind


power quality is quite good, 54 set of stand-alone capacity of 750kw
wind turbine unit, 100 set of 800kw wind power generation units and
53 set of 1500kw wind turbine units were installed, and with one
supporting 220kv substation.

It is the first mega-kilowatt class wind power base projects in China.


Project commence in 2006, completed and connected to the grid by
the end of 2010, it has become the symbol project on the river dike.
ENGINEERING & PROJECTS
- ENGINEERING DESIGN

Huadian Power International Corporation Limited Tongliao


Beiqinghe Wind Power Concession Project

The total construction scale of the project is 300MW. A total of 200 wind
power generators each of which has the capacity of 1500kW were
installed, and a 220kV step-up substation was built. The project is set up
to undertake the design and consulting work of the whole process, having
been put into operation.

In 2009, the consulting work of the project won the “ Award for China
National Excellent Engineering Consulting Achievements” held by China
Electric Power Planning & Engineering Association.

Lianyungang Joncon Group Combined Wind Farm Project

This project is an intertidal zone wind power project, and one of the
10000MW class wind power bases along the coast of Jiangsu planned
by the government. The design total installed capacity is 100MW, 50
wind turbine generator sets of 2000kW will be installed, and one 110kV
step-up substation will also be built.

In the construction drawing design for this project, rational wind turbine
foundations, roads and platforms were properly designed according to
the features of coastal intertidal zone wind farm, providing a broad
platform for the “three-step” strategy to develop wind power on land, in
intertidal zones and off-shore in Jiangsu.
ENGINEERING & PROJECTS
- ENGINEERING DESIGN

Phase I of wind and photovoltaic complementary power generation


project of CPI in Xuanhua of Hebei

This project is located in Xuanhua County, Zhangjiakou City of Hebei


Province, with total planned capacity of 300MW (including 200MW as
wind power and 100MWp as photovoltaic power).

The phase I project was started in 2013, and was scheduled to be


connected to the grid for power generation at the end of 2014, including
49.5MW as wind power and 20MWp as solar power.

Car Park BIPV Project in Dubai (The biggest profile BIPV


project in the world)

This project is located at Dubai Racecourse in UAE, with total


installed capacity of 8.1MWp.

The whole project is in a shape of an eagle with both wings


unfolding. The length of the wings is 1335m and from the head to
tail is 387m, a grandeur architectural form. CSEEC undertook the
design of the project, which is the biggest profile BIPV project in the
world.
ENGINEERING & PROJECTS
- ENGINEERING DESIGN

The energy station project in Huadian Industrial Park

This project located in Fengtai District of Beijing. It ’ s a distributed


energy co-gen project for cooling, heating and power supply with
natural gas as fuel. It is the largest capacity already completed in
China of building based distributed project.

CSEEC started the preliminary design for this project in Mar. 2012,
and completed the preliminary design and construction drawing
design in one year, gaining precious time for the construction of the
project. This project has already been built as a major
demonstration project in building green Beijing.

Thailand Krabi Palm Shell Power Plant

Thailand Krabi 1 × 12MW Palm Shell Power Plant is a biomass


power station supporting the Palm Shell Refinery. Taking palm
shells as fuel, the plant is equipped with a 1 × 12MW condensing
steam turbine and a 1×65t/h palm shell fired boiler.

CSEEC completed the design of construction drawings of the


project in October 2004. The project was completed and put into
operation in October 2005, and all its design indicators reached
the design requirements. It has become to a demonstration of
biomass power generation project in the local area.
ENGINEERING & PROJECTS
- ENGINEERING DESIGN

Suzhou 220kV Wuzhong (Guogang) Substation Phase I Project

This project was designed by CSEEC in December 2008.

The project includes three 240MVA natural oil circulating air cooling three-phase
self-couple excitation-free power transformers for the long-term planning and 2
transformers of the same sort for the current planning; 8 circuits of 220KV power
distribution equipment’s outgoing lines for the long-term planning and 8 circuits of
the same sort for current planning; 14 circuits of 110KV power distribution
equipment’s outgoing lines for the long-term planning and 8 circuits of the same
sort for current planning (GIS equipment is adopted); and 10 circuits of 35KV
power distribution equipment ’ s outgoing lines for the long-term planning and 6
circuits of the same sort for current planning.

Suzhou 220kV Wanping Transformer Substation Phase I Project

This project was built with the investment of State Grid and the
construction drawings were completed by CSEEC in December 2009.

The project involves: new construction of two 240MVA excitation-free


power transformers; adoption of GIS equipment for the 220KV and
110KV power distribution units; 8 circuits of 220KV power distribution
equipment’s outgoing lines for the long-term planning and 8 circuits of the
same sort for current planning; 14 circuits of 110KV power distribution
equipment’s outgoing lines for the long-term planning and 8 circuits of the
same sort for current planning (GIS equipment is adopted); and 12
circuits of 35KV power distribution equipment ’ s outgoing lines for the
long-term planning and 6 circuits of the same sort for current planning.
Cooperation

Cooperation is the key to leap-frog development of


CSEEC. CSEEC has established steady strategic
partnerships with large-scale groups such as East
China Electric Power Design Institute, Dongfang
Electric Corporation, Zhejiang Thermal Power
Company, and China National Electric Engineering
Co., Ltd.,etc, and has become an important partner
of its customers in both national and international
projects.
COOPERATION

CSEEC pursues the parallel development of global and domestic projects as the corporate strategy, and explores
international electric power markets via employing diversified cooperation modes. Currently, large-scale thermal
power plants, biomass power plants, and new energy power plants under CSEEC’s provision of engineering design,
engineering consulting, and EPC services are distributed over Southeast Asia, Middle East, Africa, and South
America.

CSEEC ’ s international cooperation projects have been conducted in Malaysia, Vietnam, Indonesia, Jordan,
Venezuela, Pakistan, Cuba, Turkey, Burma, Cambodia, Poland, South Africa, Botswana, Uganda, Kenya,
Zimbabwe, Angola, etc.
CORPERATE SOCIAL RESPONSIBILITY
CSEEC endeavors to create a harmonious atmosphere in the enterprise to
pursue for excellent quality with an active attitude, and develop the team
culture and foster the spirit of cooperation; it attaches great importance to the
long-term development and continual growth of the enterprise, and unifies
these goals in great harmony; CSEEC helps its employees to realize their
individual value and social value in their career development with detailed
employee career development program and by providing a stage for their
growth.
CSEEC is also endeavoring to become a modern enterprise with high sense
of social responsibility. We push forward the sustainable development of our
enterprise and the society through continual technological innovation,
management innovation and concept innovation, and do our best to make
active contributions in environmental protection, return to community, aids in
education and medical service and humanism.
CSR

2014 work report and


Chongyang Festival tea party
award ceremony

Training for medium and senior


Business etiquette training
management personnel
CSR

CSEEC hope school


Volunteer blood donation
completion ceremony

CSEEC Cup basketball Drawing Contest


league matches of staff’s children
Perfect projects
for better electric power