LEGEND

A CL B 3 1 Concrete Floor Finish


(Basketball)
16.00 19.00 0.40 mm thk. x 1220 mm x L.S. Pre
2
9.50 9.50 9.50 9.50
Painted Rib Type Roofing
0.40 mm thk. x 8 ft Pre Painted G.I.
3
0.50
End Flashing
ROOF LINE

1.00
1
6.00

2
6.00

3
32.00

33.00
6.00

1 2

SLOPE
SLOPE
4
6.00

5
6.00
ROOF LINE

6
0.50 1.00

2 FLOOR PLAN 3 ROOF PLAN


A1 scale 1:200 mts A2 scale 1:200 mts

PROPOSED COVERED COURT


PROJECT TITLE: DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

Republic of the Philippines


NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City
PHILIP LAWRENCE S ABAPO III
POLICE SENIOR INSPECTOR
MARIA DEOVINA G SEVILLANO HONORIO R AGNILA
POLICE CHIEF INSPECTOR POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
B
LOCATION: Kidalapong, Malita, Davao Occidental DEP. CHIEF, RPMU 11 ACTING CHIEF, RPMU 11 ACTING CHIEF, ID, ES CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE ACTING DIRECTOR, ENGINEERING SERVICE
LEGEND
Concrete Floor Finish
1 (Basketball)
0.40 mm thk. x 1220 mm x L.S. Pre
2 Painted Rib Type Roofing
25 mm thk. Concrete Plaster
3 Finish
0.40 mm thk. x 8 ft Pre Painted G.I.
4 End Flashing

1 2 3 4 5 6
2
1.50 6.00 6.00 6.00 6.00 6.00 1.50

1.70
4

0.40
SEE STEEL STRUT
7.60

GIRT DETAIL

5.90
1

4.90
1.80

3
FINISH FLOOR LINE

NATURAL GRADE LINE

4 TYPICAL SIDE ELEVATION


A1 scale 1:100 mts 2
CL B
CL 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.82
B B 1.15
2 0.95
19.00
16.00
1.50 8.00 1.15 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.82
0.20 SEE STEEL FACIA
0.95
1.15 DETAIL
1.04 1.04
1.04
1.04
1.04
1.04
1.04
1.04 SEE STEEL FACIA

4
1.00

1.16
1.70

0.5
0.40 mtr.
DETAIL

1.06
SEE RIDGE

1.00
PLATE DETAIL
1.10

SEE STEEL STRUT

1.06
4
1.00

1.16

0.50 1.00
GIRT DETAIL
0.5
1.00

mtr.
1.06
1.00

1.03
1.00

1.06

1.80
0.501.00
1.00

1.03

SEE BASE FINISH FLOOR LINE


PLATE DETAIL
NATURAL GRADE LINE

FRONT ELEVATION SECTION


1.80

5 FINISH FLOOR LINE


3 6
A2 scale 1:200 mts NATURAL GRADE LINE A3 scale 1:200 mts

PROPOSED COVERED COURT


PROJECT TITLE: DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

Republic of the Philippines


NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City
PHILIP LAWRENCE S ABAPO III
POLICE SENIOR INSPECTOR
MARIA DEOVINA G SEVILLANO HONORIO R AGNILA
POLICE CHIEF INSPECTOR POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
C
LOCATION: Kidalapong, Malita, Davao Occidental DEP. CHIEF, RPMU 11 ACTING CHIEF, RPMU 11 ACTING CHIEF, ID, ES CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE ACTING DIRECTOR, ENGINEERING SERVICE
LEGEND
A CL B CL 1 Concrete Floor Finish
(Basketball)
16 mm dia. Tension Bars with
2 Turn Buckle
19.00 16.00 1-1.5 mm thk. x 50mm x 150 mm
1.50 8.00 8.00 1.50 3
9.50 9.50
Cee Purlins
W 4.0 mm thk. x 75 mm x 75 mm
Angle Steel Bar Cleats (Fully Weld)
2-12 mm dia. PRB Sag Rod
4
1.00

Fully Weld

1 F1 C1 F1 C1
TRUSS
2
5 Main Trusses (see detail)
6.00

1
3

2 F1 C1 F1 C1
TRUSS

4
6.00

3 F1 C1 F1 C1
TRUSS 5
32.00

6.00

4 F1 C1 F1 C1
TRUSS
6.00

5 F1 C1 F1 C1
TRUSS
6.00

6 TRUSS
1.00

F1 C1 F1 C1

7 FOOTING DETAIL 8 ROOF FRAMING PLAN


A1 scale 1:200 mts A2 scale 1:200 mts

PROPOSED COVERED COURT


PROJECT TITLE: DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

Republic of the Philippines


NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City
PHILIP LAWRENCE S ABAPO III
POLICE SENIOR INSPECTOR
MARIA DEOVINA G SEVILLANO HONORIO R AGNILA
POLICE CHIEF INSPECTOR POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
D
LOCATION: Kidalapong, Malita, Davao Occidental DEP. CHIEF, RPMU 11 ACTING CHIEF, RPMU 11 ACTING CHIEF, ID, ES CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE ACTING DIRECTOR, ENGINEERING SERVICE
SEE BASE PLATE
14 13 11
DETAIL LEGEND
W1 1Angle
- 5.0 mm thk. x 38 mm x 38 mm
Steel Bar (Web Member)
2 - 4.0 mm thk. x 50 mm x 50 mm
OCF Angle Steel Bar Frame ( )
12 2 - 4.0 mm thk. x 50 mm x 50 mm
14 ICF

0.30
Angle Steel Bar Frame ( )

0.10
4 - 16 mm. dia. VERTICAL BARS WITH 13 0.50 0.50 0.50 0.50 0.50 0.50 2 - 5.0 mm thk. x 38 mm x 38 mm
10 mm. dia. TIES SPACED @ 3 - 0.05.
3 - 0.10, 4 - 0.15, REST @ 0.20
TC Angle Steel Bar Frame ( )

1.80
11
0.20 12 2 - 4.0 mm thk. x 50 mm x 50 mm
1.20
10 BC Angle Steel Bar Frame ( )
Concrete Floor Finish
0.30
1

0.35 mtr.
0.30
9 (Basketball)
FINISH COURT LINE 0.40 mm thk. x 1220 mm x L.S. Pre
2 Painted Rib Type Roofing
1 - 1.5 mm thk. x 50 mm x 150 mm
4
EARTHFILL EARTHFILL
11 STEEL FACIA FRAME DETAIL Cee Purlins

1.00
0.30
1.20

16 - 16 mm. dia. BEDBARS With 4.0 mm thk. x 75 mm x 75 mm


SPACED BOTHWAYS S3 scale 1:50 mts
PLAN SECTION 15
Angle Steel Bar Cleats (fully weld)
0.30

2 - 4.0 mm thk. x 38 mm x 38 mm
16 13 CL 7 Angle Steel Bar Frame ( )
0.30 0.25
4 17

10 BASE PLATE DETAIL 8 1 - 4.0 mm thk. x 38 mm x 38 mm


0.10

Angle Steel Bar (Web Member)

0.10
PLAN SECTION S2 scale 1:20 mts
1 - 4.0 mm thk. x 25 mm x 25 mm
9 Angle Steel Bar Frame
F1-CI DETAIL
FRONT ELEVATION
TC TC 13
9 15 13 16
10 1 - 4.0 mm thk. x 25 mm x 25 mm

S1 scale 1:50 mts CL 2 16 15 Angle Steel Bar (Vertical Web Member)

BC

BC
Sp. @ 0.50 m. O.C.
19.00 12 mm thk. x 300 mm x 300 mm
11 Steel Base Plate
16.00
SIDE ELEVATION 4 - 16 mm dia. Anchor Bolt
1.50
8.00 1.15 mtr.
0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.82 PLAN 12 with Nuts and Washer

1.15
0.20 mtr. 0.95
13 RIDGE PLATE DETAIL 13 Fully Weld
1 - 4.0 mm thk. x 25 mm x 25 mm
1.04
1.04 S5 scale 1:20 mts Poured Concrete
1.04
1.04
1.04
14 For Water Proofing
tr.
1.04 m 2 20 17 10 mm thk. x 100 mm x 250 mm
1.04
mtr. 15 Metal Ridge Plate
1.04
SEE STEEL FACIA 22 mm dia. Hole with 2-20 mm dia. 60 mm
16
1.70

0.40 mtr.
DETAIL Long Machine Bolt with Nut and Washer
2 - 12 mm dia. PRB Sag Rod
SEE RIDGE 4 17 Fully Weld
PLATE DETAIL 4.0 mm thk. x 75 mm x 75 mm
18
1.10

SEE STEEL STRUT 18 Angle Steel Bat Cleats Fully Weld

r.
4 mt
1.00 mtr.

1.16
GIRT DETAIL 2 - 10 mm dia. x 100 mm DRB
TC 19

0.5
Welded
1.00

Tekscrew

1.06
20
1.00
1.00

PURLIN CONNECTION DETAIL

1.06
1 14
S6 scale 1:10 mts
1.00

mtr.
1.00

SEE BASE
0.50

1.03
PLATE DETAIL
5.90
0.49 0.98 0.98
9
1.80

3 63
3 0.
6
0.

0.40
0. 0.
63 63 10
FINISH FLOOR LINE

NATURAL GRADE LINE 0.98 0.98 0.98

12 TRUSS DETAIL 15 STEEL STRUT GIRT DETAIL (6m SPAN)


S4 scale 1:100 mts S7 scale 1:50 mts
SEE F1-C1 DETAIL
PROPOSED COVERED COURT
PROJECT TITLE: DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

Republic of the Philippines


NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City
PHILIP LAWRENCE S ABAPO III
POLICE SENIOR INSPECTOR
MARIA DEOVINA G SEVILLANO HONORIO R AGNILA
POLICE CHIEF INSPECTOR POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E
LOCATION: Kidalapong, Malita, Davao Occidental DEP. CHIEF, RPMU 11 ACTING CHIEF, RPMU 11 ACTING CHIEF, ID, ES CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE ACTING DIRECTOR, ENGINEERING SERVICE
GENERAL NOTES
GENERAL CONSTRUCTION e. FALSEWORK

1. IN THE INTERPRETATION OF THESE DRAWINGS INDICATED DIMENSIONS SHALL GOVERN ALL DIMENSIONS, CONSTRUCTION SPECIFICATION: 1995 DPWH STANDARD SPECIFICATION FOR PUBLIC WORKS ALL FALSEWORKS SHALL BE DESIGNED BY THE CONTRACTOR SUBJECT TO THE APPROVAL
DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. STRUCTURES (VOL. II AND VOL. III) BY THE ENGINEER. THE FALSEWORK SHALL BE REMOVED ONLY AS DIRECTED BY THE ENGINEER.
2. UNLESS OTHERWISE SPECIFIED ON PLANS, ALL DIMENSIONS ARE IN METERS.
1. SETTING OUT f. FORMWORKS
DESIGN CRITERIA
THE SETTING OUT AND THE ELEVATIONS OF THE DIFFERENT COMPONENTS OF THE STRUCTURE FORMWORKS SHALL BE CONSTRUCTED SUCH THAT IT WILL NOT YIELD UNDER THE LOAD AND
1. DESIGN SPECIFICATION SHALL BE APPROVED BY THE ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION WORK. SHALL BE AS TO AVOID THE FORMATION OF FINE.
ALL DESIGN SHALL CONFORM TO NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NSCP) FOR ALL
BUILDINGS, TOWERS AND OTHER VERTICAL STRUCTURES, 4TH EDITION 1992, WHICH INCLUDES SEISMIC 2. REINFORCED CONCRETE 3. STRUCTURAL STEEL
DESIGN.
2. LOADINGS a. CONCRETE MIX AND PLACING a. IN ACTUAL FABRICATION OF STEEL TRUSSES, MEMBERS MEETING AT A POINT SHALL HAVE THEIR
GRAVITY AXIS INTERSECT AS NEARLY AS PRACTICABLE AT A COMMON POINT.
a. LIVE LOAD b. DEAD LOAD c. WIND LOAD 1. DESIGN OF CONCRETE MIX SHALL MEET THE DESIGN CONCRETE STRENGTH GIVEN
UNDER ITEM 1 OF MATERIALS b. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACINGS AND SHORING, AND
1 ROOF = 0.96 kPa 1 CONCRETE = 24.0 kNm3 P = Ce Cq Qs 1 2. CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE WITH THE MAKE ACTUAL MEASUREMENTS IN THE FIELD PRIOR TO FABRICATIONINSTALLATION
2 FLOOR = 4.80 kPa 2 STEEL = 76.93 kNm3 where: SPECIFICATIONS. OF ALL TRUSSES.
3 TOILET = 2.40 kPa 3 CHB = 2.73 kNm3 P = ACTUAL WIND PRESSURE 3. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL PLACING SEQUENCES
4 STAIRS = 4.80 kPa 4 STEEL DECK = 0.08 kNm3 Ce = GUST FACTOR COEFF. = 0.67 FOR ALL CONCRETING WORK. c. THE CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS FOR ALL STRUCTURAL
5 CEILING = 0.38 kPA Cq = PRESSURE COEFF. = 0.30 INWARD STEEL WORKS. THESE SHOP DRAWINGS SHALL BE APPROVED BY THE CHIEF, RPMU 11, BEFORE
6 TILES = 0.96 kPA 0.70 OUTWARD b. BAR BENDING, SPLICING AND PLACING ANY FABRICATION COMMENCES.
d. SEISMIC LOAD
V=ZIC(W) 1. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL OF SHOP DRAWINGS 4. PRE CAST PRE-STRESSED MEMBERS (COLUMNS, BEAMS AND SLABS)
Rw INDICATING THE BENDING, CUTTING, SPLICING AND INSTALLATION OF ALL REINFORCEMENT
BARS. a. THE CONTRACTOR SHALL SUBMIT DESIGN COMPUTATIONS AND SHOP DRAWINGS FOR ALL
where: 2. BARS SHALL BE BENT COLD, BARS PARTIALLY EMBEDDED IN CONCRETE SHALL NOT BE FIELD PRE CASTPRE-STRESSED MEMBERS. DULY SIGNED AND SEALED BY A STRUCTURAL ENGINEER
V = TOTAL BASE SHEAR C = NUMERICAL COEFF. DETERMINATION BENT UNLESS PERMITTED BY THE ENGINEER. BEFORE ANY FABRICATION, ERECTION AND INSTALLATION COMMENCES. THESE SHOP
Z = SEISMIC ZONE FACTOR = 0.40 C=1.25 S 2.75 3. BAR SPLICING NOT INDICATED ON DRAWINGS SHALL BE SUBJECT TO THE APPROVAL OF DRAWINGS SHALL BE APPROVED BY THE CHIEF, RPMU 11.
THE ENGINEER.
I = IMPORTANCE FACTOR = 1.25 T^23
4. WELDED SPLICES, IF APPROVED BY THE ENGINEER SHALL DEVELOP IN TENSION AT LEAST 125
Rw = NUMERICAL COEFF. = 8.5 S = SITE COEFF. = 1.0
OF THE SPECIFIED YIELD STRENGTH OF BARS.
W = TOTAL DEAD WEIGHT OF BLDG T = FUNDAMENTAL PERIOD OF VIBRATION
5. NOT MORE THAN 50 OF THE BARS AT ANY ONE SECTION SHALL BE SPLICED.
6. UNLESS OTHERWISE SHOWN ON DRAWINGS, THE CLEAR DISTANCE BETWEEN PARALLEL BARS
MATERIALS
IN A LAYER SHALL NOT BE LESS THAN 1.5 TIMES THE NOMINAL DIAMETER OF THE BAR NOR LESS
1. CONCRETE
THAN 1.5 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE. THE CLEAR DISTANCE BETWEEN
UNLESS INDICATED OTHERWISE ON PLANS, THE CONCRETE CLASS AND STRENGTH SHALL BE AS FOLLOWS:
LAYERS SHALL NOT BE LESS THAN 25mm NOR ONE BAR DIAMETER. THE BAR IN THE UPPER
LAYER SHALL BE PLACED DIRECTLY ABOVE THOSE IN THE BOTTOM LAYER.
26-DAY CYLINDER 7. CRANKED SPLICES
STRENGTH
STRUCTURAL MEMBER CLASS LAP
MPs PSI

FOOTINGS AND TIE BEAMS A 20.70 3000


MIN =
SLABS ON FILL AND PARTITIONS 17.26 2500 SLOPE 1:6 MAX
MAX =
PRE CAST PRE-STRESSED COLUMNS
BEAMS AND SLABS 34.47 5000
8. HOOKS AND BENDS
DIMENSIONS OF 90 deg AND 180 deg HOOKS
2. REINFORCING STEEL
d d
(a.) REINFORCING STEEL SHALL CONFORM TO AASHTO M31 (ASTMA615), GRADE 40, DEFORMED WITH
D
MINIMUM YIELD STRENGTH, fy=276 MPa (40,000 PSI) FOR BARS 16 MM dia. OR SMALLER AND GRADE 60 WITH
D
MINIMUM YIELD STRENGTH, fy=414 MPs (60,000 PSI) FOR LARGER THAN 16 mm dia. 12d
4d OR

90 deg HOOK 180 deg HOOK 63mm MIN

(b). REINFORCING STEEL SHALL BE FREE OF MILL SCALES, OIL OR ANY SUBSTANCES WHICH WILL WEAKEN THE
BOND WITH CONCRETE.

3. STRUCTURAL STEEL BOLTS AND WELDS


PIN DIAMETER: D=6d FOR dia. 10 THRU dia. 25
D=8d FOR dia. 28, dia. 32 and dia. 36

MATERIAL SPECIFICATION c. CONCRETE COVER TO REINFORCEMENT

TRUSSES, PURLINS, PLATES, BRACINGS, ASTM A-36 MINIMUM CONCRETE COVER TO REINFORCEMENT SHALL BE 75 mm UNLESS SHOWN OTHERWISE
ETC fy=248 MPa ON DRAWINGS
ASTM A-307
BOLTS fy=69 MPa; fst=96.60 MPa
E = 60xx ELECTRODES
d. CONSTRUCTION JOINT
WELDS fV = 94 MPa
1. THE POSITION AND FORM OF ANY CONSTRUCTION JOINTS SHALL BE AS SHOWN ON
DRAWINGS OR AS AGREED WITH THE ENGINEER
2. THE INTERFACE BETWEEN THE FIRST AND SECOND POUR OF CONCRETE SHALL BE WITH
AN AMPLITUDE OF 6mm MINIMUM.

PROPOSED COVERED COURT


PROJECT TITLE: DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

Republic of the Philippines


NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City
PHILIP LAWRENCE S ABAPO III
POLICE SENIOR INSPECTOR
MARIA DEOVINA G SEVILLANO HONORIO R AGNILA
POLICE CHIEF INSPECTOR POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
F
LOCATION: Kidalapong, Malita, Davao Occidental DEP. CHIEF, RPMU 11 ACTING CHIEF, RPMU 11 ACTING CHIEF, ID, ES CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE ACTING DIRECTOR, ENGINEERING SERVICE
CKT. 1

CKT. 2

CKT. 3

CKT. 4

CKT. 5

16 ELECTRICAL PLAN
E 1 scale 1:100 mts

PROPOSED COVERED COURT


PROJECT TITLE: DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

Republic of the Philippines


NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City
PHILIP LAWRENCE S ABAPO III
POLICE SENIOR INSPECTOR
MARIA DEOVINA G SEVILLANO HONORIO R AGNILA
POLICE CHIEF INSPECTOR POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
G
LOCATION: Kidalapong, Malita, Davao Occidental DEP. CHIEF, RPMU 11 ACTING CHIEF, RPMU 11 ACTING CHIEF, ID, ES CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE ACTING DIRECTOR, ENGINEERING SERVICE
PNL- 1 S C H E D U L E O F L O A D S
NUMBER OF
CKT. NO LOAD DESCRIPTION SWITCHES VOLTS VOLT-AMP AMPERE CIRCUIT BREAKER SIZE OF WIRE & CONDUITS
CONVENIENCE LIGHTING S1 S2 S3 S3w
1 LED FLOOD LIGHT 4 2 230 V 200 0.86 15 A, 2P 3.5MM2 THHN WIRE15MM DIA PVC PIPE
2 LED FLOOD LIGHT 4 2 1440 6.26 20 A, 2P 3.5MM2 THHN WIRE15MM DIA PVC PIPE
3 CONVENIENCE OUTLET 4 1824 7.93 30 A, 2P 3.5MM2 THHN WIRE15MM DIA PVC PIPE
4 METAL HALIDE LAMP 3 3 1824 7.93 30 A, 2P 3.5MM2 THHN WIRE15MM DIA PVC PIPE
5 LED FLOOD LIGHT 4 2 1824 7.93 30 A, 2P 3.5MM2 THHN WIRE15MM DIA PVC PIPE

TOTAL 21 2 230 V 8480 36.85


It = 1640(.80)+6840230=35.44 Amp USE : 60 MAIN CB,2P, 60 HERTZ, 240 V IN 6 BRANCHES PANELBOARD, BOLT- ON TYPE
2- 8 MM2 THHN COPPER WIRE + 1- 5.5 MM2 THHNTHW WIRE ( G ) IN 25 MM DIA RSC PIPE
GENERAL NOTES & SPECIFICATION
SERVICE ENTRANCE
3-WIRE, SINGLE PHASE 1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN
STRICT CONFORMITY WITH THE LATEST APPROVED EDITION

M 2- 8.0 MM2 THHNTHWN CU. WIRE &


1- 5.5 MM2 THHNTHWN CU. WIRE (GROUNDING)
OF THE PHILIPPINE ELECTRICAL CODE (PEC), THE
REQUIREMENTS OF THE MANILA ELECTRIC COMPANY, THE
IN 25 MM DIA. RSC PIPE RULES AND REGULATION OF ALL LOCAL AND NATIONAL
AUTHORITIES CONCERNED IN THE ENFORCEMENT OF
ELECTRICAL LAWS.
60 A MAIN C.B. 2. THE SUPPLY TO THE BUILDING SHALL BE SINGLE PHASE
3-WIRE, 240VOLTS AND 60HZ.
LIGHTING 1 15 A 30A 2 METAL HALIDE LAMP 3. NATURE OF WORKS FOR SERVICE ENTRANCE AND MAIN
30 A 30 A 4 METAL HALIDE LAMP
METAL HALIDE LAMP 3 FEEDER LINE SHALL BE DONE IN RIGID STEEL CONDUIT (RSC),
30 A 30A
METAL HALIDE LAMP 5 6 HIGH BAY FITTING METAL HALIDE AND FOR POWER AND LIGHTING LAYOUT SHALL BE DONE IN
POLYVINYL CHLORIDE (PVC) SCHED. 40 WITH PROPER BOXES
SUPPORTS AND FITTINGS.
4. ALL MATERIALS AND EQUIPMENT TO BE USED SHALL BE
NEW AND OF THE APPROVED TYPE BY THE PHIL. STANDARD
SINGLE-LINE RISER DIAGRAM AGENCY FOR EVERY INTENDED LOCATION AND PURPOSES.

5. SMALLEST SIZE OF WIRE AND CONDUIT DIAMETER TO BE


LEGEND: USED UNLESS SPECIFIED IN THE PLAN SHALL SHALL BE
3.5MMSQ. (NO. 12 AWG) AND 15 MMØ (1/2"Ø) ELECTRICAL
STANDARD SIZE RESPECTIVELY.

HIGH BAY FITTINGS METAL HALIDE 6. WIRES AND CABLES TO BE USED SHALL BE PURE COPPER
M CEPALCO METER WITH 600VOLTS HEAT RESISTANT THERMOPLASTIC WITH NYLON
TYPE "THHN"" THW " OR APPROVED EQUAL.
METAL HALIDE
LPPP CIRCUIT HOMERUN, IND. CKT. NO. 7. ALL WORKS HEREIN SHALL BE DONE IN WORKMAN-LIKE-MANNER
1
AND SHALL BE UNDER THE DIRECT SUPERVISION FROM A DULY
DUPLEX CONV. OUTLET LICENSED, REGISTERED ANDOR PROFESSIONAL ELECTRICAL ENGR.
LIGHTINGPOWER PANEL BOARD
8. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
LIGHT SWITCHES - 1.40M ON CENTER TO FIN. GRD. FLR. LN.
LED LAMP 9W DUPLEX CONV. OUTLET - 0.30M.O.C. TO FIN. GRD. FLR. LN.
PANEL BOARD - 1.50M.O.C. TO FIN. GRD. FLR. LN.

PROPOSED COVERED COURT


PROJECT TITLE: DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

Republic of the Philippines


NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City
PHILIP LAWRENCE S ABAPO III
POLICE SENIOR INSPECTOR
MARIA DEOVINA G SEVILLANO HONORIO R AGNILA
POLICE CHIEF INSPECTOR POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
H
LOCATION: Kidalapong, Malita, Davao Occidental DEP. CHIEF, RPMU 11 ACTING CHIEF, RPMU 11 ACTING CHIEF, ID, ES CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE ACTING DIRECTOR, ENGINEERING SERVICE