ASPEN VISION DEVELOPMENT SDN BHD Doc. Ref.

: AVD/PD/RW
Rev. No. : 0
FORM
ISO Issue Date : 15TH SEPT 2017
ROAD WORKS INSPECTION CHECKLIST Page : 1 of 1

Project :

Project Ref. : Location : :

Contractor : Drawing Ref. : :

Block/Unit No. : Date & Time :

No. Items to be checked Acceptability Remarks


YES NO
1 Completion of all underground services
2 Setting out by license surveyor
3 Survey drawing done by licence surveyor
5 Subgrade / Sub Base / Road Base
Material, laying thickness, even & compacted
4 Prime Coat
Material, laying thickness, even & compacted
5 Binder Course
a) Material, design mix, trial mix, laying thickness, even
& compacted
6 Tack Coat
Material & evenly sprayed
7 Wearing Course
a) Material, design mix, trial mix, laying thickness, even
& compacted

STATUS : YES - Acceptable NO – Unacceptable


Non-Conformance : Correction :

Re-inspection : Remarks :

Checked By : [Consultant’s Rep.] Verified By : [Client’s Rep.]

Signature : ………………………. Signature : ……………………….

Name : Name :

Date : Date :