Site Data & Test Report-Node B New Site

Country NIGERIA
Strategic Partner ZTE
Date of Installation 2018/03/25
Date of Integration 2018/03/25
Date of Commissioning 2018/03/25

Site Name AIRTEL


Airtel 2G Site ID LG9114
Airtel 3G Site ID LG9114
Tower company Site ID SWAP
Site Lat/Long 6.611/3.33456
GSM Band for BTS (900/1800) 1800
Type of BTS Indoor
(Indoor/Outdoor/Tower Top)

Name of Infra Provider (Tower Company) -


Anchor Operator -
Sharing Opco 1 -
Sharing Opco 2 -
Sharing Opco 3 -
Sharing Opco 4 -
Infra Shared(Tower / DG / Shelter / AC / AC Mains / DC -
Btys etc)

Trx Configuration (e.g 2/2/2 , ……) 444


MW Freq Band -
Combined /uncombined Mode (Y/N) -
TMA Installed (Y/N) -

Sites Layout Attached No


Acceptance KPI Attached Yes
Standared Node AT Documents attached No
Site Photographs for RF Attached Yes
Ping test snapshots attached No
Clutter photos attached Yes

Site Address Dangote Cement, Oba Akran Avenue, Ikeja


City LAGOS

Site Owner Details


Name -
Address -
Mobile Numbers : -
Landline Number (R) : -
Landline Number (O) : -
Signoff :

Project Manager ( Airtel ) Project Manager (SP)

Mob Number Mob Number

Sign Sign

Name Name

Date : Date :
Drive Test Data:
Planned Actual Remarks
Site ID: 49114 49114
Site Name: LG9114 LG9114
Site Configuration (2/2/2 , 4/4/4…) : 4/4/4 4/4/4
Activity (New Site / Swap) Swap Swap
BTS
BTS Type : ( Indoor
Product Type : / Outdoor / Tower Top / IBS Micro ) Indoor Indoor
Mention - Flexi / Ultra etc For NSN BS8900A BS8900A
Site Address: 2964 / RBS 2954 etc for Ericsson
Mention - RBS Dangote Cement, Oba Akran Avenue, Ikeja
Region : LAGOS
Latitude : 6.611
Longitude : 3.33456
1ST FLOOR Yes
GPRS Working ( Yes / No ) 2ND FLOOR Yes
3RD FLOOR Yes
1ST FLOOR Yes
Edge Working ( Yes / No ) 2ND FLOOR Yes
3RD FLOOR Yes
1ST FLOOR 4
No. Of Dynamic EDGE TSL allocated 2ND FLOOR 4
3RD FLOOR 4

Telecom Material Check List Attached

Telecom Material Check List verified against planned Material


(Please attach the List )

Cell Configuration
GSM900/1800 (in case dual band antenna is installed) or
GSM1800 (incase single GSM1800 antenna is installed) 1ST FLOOR 2ND FLOOR 3RD FLOOR Sector 4

BSC ID 109 109 109


LAC 183 183 183
RAC 0 0 0
CI 49114 49114 49114
BCCH 792 792 792
BSIC 36 36 36
HSN
TCH
SDCCH
FPDCH
Num. of TRX's
No. Of Dynamic EDGE TSL allocated
Erlangs Equipped
TMA N/A N/A N/A
Combined Mode / Uncombined Mode N/A N/A N/A
Call Tests
Check that all Cells are active and that call processing is enabled 1ST FLOOR 2ND FLOOR 3RD FLOOR Sector 4
on each
Call Originating - Mobile to Mobile (Y/N) Y Y Y
Call Terminating - Mobile to Mobile (Y/N) Y Y Y
SMS Y Y Y
Emergency Call N/A N/A N/A
GPRS Working (Y/N) Y Y Y
EDGE Working (Y/N) Y Y Y
Coverage Test
1ST FLOOR 2ND FLOOR 3RD FLOOR Sector 4
RX LEVEL(dBm) -50 -53 -52
C/I 35 35 35
Distance 100 100M 100M
Handover
1ST FLOOR 2ND FLOOR 3RD FLOOR Sector 4
1ST FLOOR OK OK
2ND FLOOR OK OK
3RD FLOOR OK OK
Sector 4
Antenna System Details
GSM900/1800 (in case dual band antenna is installed) or
GSM1800 (incase single GSM1800 antenna is installed) 1ST FLOOR 2ND FLOOR 3RD FLOOR Sector 4

Planned Actual Planned Actual Planned Actual Planned


Number of TRX's
GSM Antenna Type ( Part Code )
GSM Antenna Quantity
Antenna Height (AGL)
Azimuth 0 0 0 0 0 0
Electrical Downtilt
Mechanical Downtilt
TMA N/A N/A N/A N/A N/A N/A
Combined Mode / Uncombined Mode N/A N/A N/A N/A N/A N/A
TX Power (On top of BTS Cabinet)
Remarks(if any)
No. of DAS antennas in case of IBS N/A N/A N/A N/A N/A N/A
Type of DAS antenna in case of IBS N/A N/A N/A N/A N/A N/A
Time Slot Wise Call Testing Done N/A N/A N/A N/A N/A N/A
BTS Installation
BTS Installation
FLOORS ARFCN of BCCH SDCCH FPDCH TCH Erlangs / sector Remarks
1 792
2 792
3 792
Installed TRX configuration sheet (cabinet-wise)
New Erlangs equipped on the site

Total Erlangs equipped on the site 0

Link1 Link2 Link3 Link4


MW Antenna System
Planned Actual Planned Actual Planned Actual Planned
MW Equipment Type- Traffic Node/Minilink Traffic node
E/Flexi Metro/ Flexi Hybrid AMM 2P R5
MW Equipment Capacity Equipped-16/32/63/75
E1 22 E1
Antenna Type ( Mention Part Number )
Diameter of the MW Antenna
Space Redundancy
Frequency Band
MW Antenna Strut Rod Installed for Antenna Safety during high
Winds-Mention Nil, One or Two
Sector/ Cell GSM Feeder Type GSM Feeder Measured VSWR Cable loss Test Pass / Fail Internal intra-site call
Length (m) handover tests
GSM Cable Return loss, Cable Loss & VSWR
Measurements :
1ST FLOOR
2ND FLOOR
3RD FLOOR

Mention Yes / No
For BTS Cabinets Yes
For all Cables & Accessories Yes
Labelling done for All BSS and TX equipments For Tx Equipment Yes
Installed For GSM Antenns Yes
For MW Antennas Yes
For TMA's NA
For Fiber Equipment Yes
For Mux Eqpt NA

NMS Visibility of MW system Yes/ No

Fibre Connectivity :
Is the Site with OFC Node Connectivity ? (Yes / No ) NO
Agency from which OFC Node is provided (Mention
BTSOL/PGCIL/Railtel etc )
Type of OFC MUX (Mention STM 1/ STM 4 etc)

Description e.g (Door Open, DG Extended to


Alarms etc..) Connected ? Checked ? NOC ? Date
Alarms
Alarm 1 Yes/No Yes/No Yes/No
Alarm 2 Yes/No Yes/No Yes/No
Alarm 3 Yes/No Yes/No Yes/No
Alarm 4 Yes/No Yes/No Yes/No
Alarm 5 Yes/No Yes/No Yes/No
Alarm 6 Yes/No Yes/No Yes/No
External Alarm Verification Alarm 7 Yes/No Yes/No Yes/No
Alarm 8 Yes/No Yes/No Yes/No
Alarm 9 Yes/No Yes/No Yes/No
Alarm 10 Yes/No Yes/No Yes/No
Alarm 11 Yes/No Yes/No Yes/No
Alarm 12 Yes/No Yes/No Yes/No
Alarm 13 Yes/No Yes/No Yes/No
Alarm 14 Yes/No Yes/No Yes/No
Alarm 15 Yes/No Yes/No Yes/No
TMA Alarm

Attach Prediction Plots (Annexure 1) Yes/No Soft copy along with candidate to be given by D&P Yes
Attach Drive Test Report (Annexure 2) Yes/No To be Given within one 7 days of Site RFS Yes
Attach Walk Test Report for IBS Yes/No To be Given within one 7 days of Site RFS Yes
Coverage Certified to be in line with Prediction Yes/No To be Given within one 7 days of Site RFS Yes

Remarks

Performed By : Verified By :……………………………………

Sign : Sign :……………………………………..

Date : Date :……………………………………..

Mobile No : Mobile No :……………………………………..

NOTE:
Functionality test should be perform at the static point under good RF condition. Please ensure the following criterias accordingly:
1. Within main lobe of the respective sector that closest to the site.
2. Dominant RxLev.
3. RxLev should be greater then -85dBm.
4. RxSub should be greater than -9.
Remarks

Sector 4

Sector 4

Sector 4

Sector 4

Sector 4

Actual
Remarks

Link4
Actual
Test Pass /
Fail
Drive Test Plots comparisons will be made at -85 signal strength Level . This includes Swap Comparisons and Prediction vs. Actual Drive Test Comparison.
Annexure 2: Drive Test plot with Radius Marked for -85dBm and -93 dBm

Rx Level Idle Mode Best Server Idle Mode


(Idle mode Drive test plot and in dedicated mode)

Deviation from Planning (at -85dBm) Pass/Fail Remarks


Acutal Coverage is with between 80% and 120% of planned Coverage Yes/ No Pass
Actual Coverage is more than 120% of planned Coverage (Over shooting) Yes/ No Fail
Actual Coverage is less than 80% of planned coverage (Under shooting) Yes/ No Fail

% age samples with -85 dBm


% age samples with -93 dBm

Villages covered at -85 dBm (if applicable)

Villages covered at -93 dBm (if applicable)

Drive Test Adequacy Analysed & Certified by :


Planning Head (MC )
Name
Sign
Date
Rx Level Dedicated

Best Server Dedicated Mode


RxQual
Sector 1

Sector 2
Sector 3
Traffic CS

CSSR

TCH Drop Rate


HOSR

TCH Congestion

TBF Estab Succ. Rate


Traffic PS

SDSR (%)

SDCCH Drop Rate


Half Rate Penetration

SDCCH Congestion

TBF Drop Rate


Tower Photographs Building Photographs(If Available)

Sector 1 Photograph Sector 2 Photograph


(If Available)

Sector 3 Photograph