-ditto- all type of tree of girth exceeding 1800mm but not exceeding 2400mm
1-1-3 no. 1,350.00
measured 600mm from the ground level.
-ditto- all type of tree of girth exceeding 2400mm but not exceeding 3000mm
1-1-4 no. 1,600.00
ja
measured 600mm from the ground level.
ha
1-2 GRUBBING UP TREE STUMPS AND ROOTS.
sa
Supply all labour, equipment and material to GRUB UP TREE STUMP not
exceeding 600mm girth measured 600mm from the ground level. Work shall
L
'1-2-1 include grubbing up all roots, backfill, excavation with dry material and remove no. 450.00
BK
all branches, trunks, stumps, roots etc from site location to be provided by the
contractor
rD
-ditto- all type of tree of girth exceeding 600mm but not exceeding 1800mm
1-2-2 no. 800.00
e
-ditto- all type of tree of girth exceeding 1800mm but not exceeding 2400mm
te
-ditto- all type of tree of girth exceeding 2400mm but not exceeding 3000mm
aa
Supply all labour, equipment and material to cut TREE BRANCHES obstructing
k
Directional Signages, Traffic Signages, Traffic Lights and other Road Furnitures
1-3-1 no. 250.00
tu
or others as instructed by the Engineer. Works shall include removal of all cut
un
branches and debris from the site and dispose to tip provided by the Contractor.
1-5-1 Supply all labour and material to resite tree all type of tree with girth not
exceeding 1800mm measured 600mm from the ground level no. 1,000.00
1-5-2 -ditto- as item 1-5-1 but for tree with girth exceeding 1800mm but not
exceeding 3000mm measured 600mm from the ground level no. 1,200.00
SCHEDULE OF RATES NO. 2: DRAINAGE WORKS
ja
existing concrete block drain, pudu cut drain, rubble wall and brickwall in
ha
headwall, wingwall, slabs, manholes, culverts, drains, rock, etc. and
m3
sa
dispose of rubble at site to be provided by contractor or as directed by 38.50
the Engineer.
L
2-1-3 BK
-ditto- as item 2-1-2 but for concrete with steel reinforcement bars m3 49.50
Supply all plant and labour to neatly pre-cut the tarmacadamised road or
rD
2-1-4 m 5.50
exceeding 50mm thick including refill and ram. Rate shall include road
nd
2-1-5 -ditto- as item 2-1-1 but for excavation to drains, pipe culvert, manholes,
aa
sumps, kerb, etc. and for breaking through tarmacadamised road not
n
2-2 EARTHWORKS
ke
2-2-1 Excavate in all materials other than solid rock to the required lines and
k
2-2-3 Excavate in unsuitable material in existing earth drains and other water
courses, etc. below level, dispose to spoil tips off-site at a location to
be provided by the Contractor and backfill with suitable material in
compacted layers all in accordance with the Specifications or as directed
by the Engineer. m3 8.10
Extra over for item 2-2-1 to 2-2-3 inclusive for carting away surplus
2-2-4 m3 5.80
excavated earth to tips to be provided by the Contractor.
2-2-5 Extra over for item 2-2-1(a) and 2-2-3 for importing approved fill materials
from tips to be provided by the Contractor. m3 5.80
ITEM DESCRIPTION UNIT RATE
2-2-6 Excavate to drain for drain laying to depth not exceeding 1.5m in
pre-approved length to minimise inconvenience to pedestrian and
vehicular traffic, get out and remove to a tip to be provided by the
contractor away from work site, including where directed cutting site
slopes to angles as specified. On completion of drain laying return
selected spoil and ram sides of drains. Include all necessary timbering. m3 8.60
- ditto- but to depth exceeding 1.5m but not exceeding 3.0m - ditto - (Volume f
2-2-7 m3 10.40
excavation to be calculated from ground level to the actual depth)
2-2-8 -ditto-but to depth exceeding 3.0m but not exceeding 4.5m -ditto-
ja
(Volume of excavation to be calculated from ground level to the actual
ha
depth) m3 12.70
sa
HAND EXCAVATION
L
2-2-9
BK
Supply all necessary labour and tools for hand excavation, get out and
remove to a tip provided by the Contractor. On completion, return to
rD
2-2-10 Extra over for item 2-2-6 to 2-2-9 inclusive, for carting away surplus
excavated materials to tips to be provided by Contractor. m3 5.80
te
n
aa
2-2-11 Supply all necessary materials and labour and grade side slopes or
ke
drains, cuts, fill, etc. to even slopes not exceeding 1.5m high, average
depth of cut 150mm along slope. Cart away excavated material to tips to
k
2-2-12 -ditto- but exceeding 1.5m high and not exceeding 3.0m -ditto- m2 2.30
2-3 FILLING
2-4 PILING
2-4-2 -ditto- exceeding 2.5m and not exceeding 5.0m long and -ditto- m 6.00
Supply all necessary materials and labour and drive 125mm dia. 2.5m long
2-4-3 bakau piles as directed. Include for the supply of 2.5m length bakau pile and no. 18.00
for necessary cutting, pointing, handling,pitching and driving.
2-4-4 Supply Type III-A 12W x 12m length sheet piles to site (Length of pile to
be measured on actual driven length) m 180.00
ja
protect excavation faces and extract on backfilling. (Driving measured
ha
separately). m 120.00
sa
2-4-6 Supply vibro-hammer, crane and labour as necessary to pitch and drive
sheet piles to set and cut off to level as directed. m 15.00
L
2-4-7 BK
Mobilization and demobilization of piling machines with vibro-hammer and
necessary machines. no. 900.00
rD
2-5 CONCRETOR
e
nd
CONCRETE TO DRAINS
2-5-1 Provide and lay concrete (1:3:6 - 38mm aggregate) in base and
te
haunching to block drain, "Pudu Cut" drain and H.R.G.W channels all as
n
per details in Drawing No. JKAL 1260/1A, JKAL 1260/2A and JKAL
aa
all mixing and placing (casing including struts etc. and float rendering
k
2-5-4 Provide and lay concrete (1:4:8 - 38mm agg.) in rough fill or mud seal
etc. as directed. m3 210.00
2-5-5 Provide and lay concrete (1:3:6 - 38mm agg.) in foundation and
benching to manholes or as directed. m3 236.00
READY-MIX CONCRETE
2-5-8 Purchase and lay Ready-Mix Concrete Grade 15 MPa to any site as
directed by the Engineer. Include for all mixing, placing and
consolidating as required. m3 236.00
3
2-5-9 -dito- but Ready-Mix Concrete Grade 20 MPa. m 242.00
ja
2-7-1 Purchase 305 x 305mm precast concrete block drain from approved
ha
manufacturer transport to site and lay to exact line, level and gradient as
required in prepared trench (measured separately). Include for jointing in
sa
cement mortar 1:3 for cutting and waste. m 25.20
L
2-7-2 -ditto- but 381 x 381mm precast concrete block drain and -ditto- m 30.00
2-7-3
BK
-ditto- but 457 x 457mm precast concrete block drain and -ditto- m 40.80
rD
2-7-4 -ditto- but 610 x 610mm precast concrete block drain and -ditto- m 60.00
e
Include for jointing in cement mortar 1:3 and for all cutting and waste. m 13.20
n
2-8-2 -ditto- but straight 225mm dia. G.W.H.R. channel and -ditto- m 15.60
gu
2.8.3 -ditto- but straight 300mm dia. G.W.H.R. channel and -ditto- m 24.00
ke
2-8-4 -ditto- but straight 381mm dia. G.W.H.R. channel and -ditto- m 30.00
k
2-9-1 Purchase "Pudu Cut" precast block drain as per SP/0003/11.90 from
un
approved manufacturer, transport to site and lay to exact line, level and
gradient as required in prepared trench (measured separately). Include
for jointing in cement mortar 1:3 and for all cutting and waste. m 55.00
2-10 PRECAST CONCRETE "U-SHAPE" DRAIN
2-10-1 Purchase 600 x 600mm precast concrete U-shape drains with dry
weather flow channel from approved manufacturer, transport to site and
lay to exact line, level and gradient as required in prepared trench.
Include for jointing and pointing in cement cement mortar (1:3) Drawing
No. SP/003/11.90 (JKAL 1260/39) refers. m 150.00
2-10-2 -ditto- 900 x 900mm precast concrete U-shape drains with DWF channel m 240.00
2-10-3 -ditto- 1200 x 600mm precast concrete U-shape drains with DWF channel m 264.00
2-10-4 -ditto- 1200 x 900mm precast concrete U-shape drains with DWF channel m 288.00
2-10-5 -ditto- 1200 x 1200mm precast concrete U-shape drains with DWF channel m 312.00
2-10-6 -ditto- 1500 x 600mm precast concrete U-shape drains with DWF channel m 348.00
2-10-7 -ditto- 1500 x 900mm precast concrete U-shape drains with DWF channel m 372.00
ITEM DESCRIPTION UNIT RATE
2-10-8 -ditto- 1500x1200 precast concrete U-shape drains with DWF channel m 379.50
2-10-9 -ditto- 1800x1200 precast concrete U-shape drains with DWF channel m 690.00
2-10-10 -ditto- 1800x1500 precast concrete U-shape drains with DWF channel m 747.50
2-10-11 -ditto- 1800x1800 precast concrete U-shape drains with DWF channel m 805.00
2-10-12 -ditto- 2100x1500 precast concrete U-shape drains with DWF channel m 1,242.00
2-10-13 -ditto- 2100x1800 precast concrete U-shape drains with DWF channel m 1,362.80
2-10-14 -ditto- 2100x2100 precast concrete U-shape drains with DWF channel m 1,449.00
2-10-15 -ditto- 2400x1800 precast concrete U-shape drains with DWF channel m 1,483.50
ja
2-10-16 -ditto- 2400x2100 precast concrete U-shape drains with DWF channel m 1,581.30
ha
2-10-17 -ditto- 2400x2400 precast concrete U-shape drains with DWF channel m 1,656.00
sa
2-10-18 -ditto- 2700x1800 precast concrete U-shape drains with DWF channel m 1,673.30
L
2-10-19 -ditto- 2700x2100 precast concrete U-shape drains with DWF channel m 1,736.50
BK
2-10-20 -ditto- 2700x2400 precast concrete U-shape drains with DWF channel m 1,776.80
rD
2-10-21 -ditto- 2700x2700 precast concrete U-shape drains with DWF channel m 1,943.50
2-10-22 -ditto- 3000x2100 precast concrete U-shape drains with DWF channel m 1,828.50
e
nd
2-10-23 -ditto- 3000x2400 precast concrete U-shape drains with DWF channel m 1,897.50
te
2-10-24 -ditto- 3000x2700 precast concrete U-shape drains with DWF channel m 2,012.50
n
2-10-25 -ditto- 3000x3000 precast concrete U-shape drains with DWF channel m 2,150.50
aa
2-10-26 -ditto- 3300x2400 precast concrete U-shape drains with DWF channel m 1,978.00
n
gu
2-10-27 -ditto- 3300x2700 precast concrete U-shape drains with DWF channel m 2,127.50
ke
2-10-28 -ditto- 3300x3000 precast concrete U-shape drains with DWF channel m 2,185.00
2-10-29 -ditto- 3650x2100 precast concrete U-shape drains with DWF channel m 2,070.00
k
tu
2-10-30 -ditto- 3650x2400 precast concrete U-shape drains with DWF channel m 2,185.00
un
2-10-31 -ditto- 3650x2700 precast concrete U-shape drains with DWF channel m 2,294.30
2-10-32 -ditto- 3650x3000 precast concrete U-shape drains with DWF channel m 2,403.50
PRECAST CONCRETE 'L' SHAPED DRAIN
2-11-2 -ditto- but 600mm dia. class "X" concrete pipes and -ditto- m 132.30
2-11-3 -ditto- but 750mm dia. class "X" concrete pipes and -ditto- m 151.80
2-11-4 -ditto- but 900mm dia. class "X" concrete pipes and -ditto- m 178.30
2-11-5 -ditto- but 1200mm dia. class "X" concrete pipes and -ditto- m 241.50
2-11-6 -ditto- but 1500mm dia. class "X" concrete pipes and -ditto- m 333.50
ja
2-11-7 -ditto- but 1800mm dia. class "X" concrete pipes and -ditto- m 448.50
ha
Purchase from approved manufacturer 450mm dia. butt-jointed spun precast
reinforced concrete pipes as specified, transport to site & lay on concrete bed
sa
2-11-8 m 110.00
all as per detail in Dwg No.SP/0003/11.90 or JKAL 1260/3A be class "Z".
(Concrete base haunch/surround to be measured 'separately.)
L
2-11-9 BK
-ditto- but 600mm dia. class "Z" concrete pipes and -ditto- m 144.90
rD
2-11-10 -ditto- but 750mm dia. class "Z" concrete pipes and -ditto- m 179.40
2-11-11 -ditto- but 900mm dia. class "Z" concrete pipes and -ditto- m 270.30
e
nd
2-11-12 -ditto- but 1200mm dia. class "Z" concrete pipes and -ditto- m 287.50
te
2-11-13 -ditto- but 1500mm dia. class "Z" concrete pipes and -ditto- m 402.50
n
2-11-14 -ditto- but 1800mm dia. class "Z" concrete pipes and -ditto- m 586.50
n aa
gu
ke
k
tu
un
ITEM DESCRIPTION UNIT RATE
ja
2-12-9 -ditto- but 1800 x 1200 mm precast concrete box culvert -ditto- m 1,092.50
ha
2-12-10 -ditto- but 1800 x 1500 mm precast concrete box culvert -ditto- m 1,207.50
sa
2-12-11 -ditto- but 1800 x 1800 mm precast concrete box culvert -ditto- m 1,265.00
L
2-12-12 -ditto- but 2100 x 1800 mm precast concrete box culvert -ditto- m 1,840.00
BK
2-12-13 -ditto- but 2100 x 2100 mm precast concrete box culvert -ditto- m 1,897.50
rD
2-12-14 -ditto- but 2400 x 1800 mm precast concrete box culvert -ditto- m 1,955.00
e
2-12-15 -ditto- but 2400 x 2100 mm precast concrete box culvert -ditto- m 2,012.50
nd
2-12-16 -ditto- but 2400 x 2400 mm precast concrete box culvert -ditto- m 2,070.00
te
2-12-17 -ditto- but 2700 x 2100 mm precast concrete box culvert -ditto- m 2,127.50
n
aa
2-12-18 -ditto- but 2700 x 2400 mm precast concrete box culvert -ditto- m 2,242.50
2-12-19 -ditto- but 2700 x 2700 mm precast concrete box culvert -ditto- m 2,300.00
n
gu
2-12-20 -ditto- but 3000 x 2100 mm precast concrete box culvert -ditto- m 2,530.00
ke
2-12-21 -ditto- but 3000 x 2400 mm precast concrete box culvert -ditto- m 2,587.50
k
2-12-22 -ditto- but 3000 x 2700 mm precast concrete box culvert -ditto- m 2,645.00
tu
2-12-23 -ditto- but 3000 x 3000 mm precast concrete box culvert -ditto- m 2,725.50
un
2-12-24 -ditto- but 3300 x 2400 mm precast concrete box culvert -ditto- m 2,817.50
2-12-25 -ditto- but 3300 x 2700 mm precast concrete box culvert -ditto- m 2,932.50
2-12-26 -ditto- but 3300 x 3000 mm precast concrete box culvert -ditto- m 2,990.00
2-12-27 -ditto- but 3650 x 2400 mm precast concrete box culvert -ditto- m 3,277.50
2-12-28 -ditto- but 3650 x 2700 mm precast concrete box culvert -ditto- m 3,392.50
2-12-29 -ditto- but 3650 x 3000 mm precast concrete box culvert -ditto- m 3,450.00
ITEM DESCRIPTION UNIT RATE
2-13-1 Provide and lay 300mm x 350mm CG12V precast concrete concrete glaze
drain from approved manufacturer. Include for jointing in 3:1 cement m 26.40
mortar and for cutting and waste.
ja
2-13-7 -ditto- but 150mm x 125mm CG V6U -ditto-. m 194.40
ha
2-13-8 -ditto- but 600mm x 600mm CG UH -ditto-. m 226.80
sa
2-13-9 -ditto- but 900mm x 900mm CG UH -ditto-. m 291.60
L
2-13A CUT OFF DRAIN
2-13A-1
BK
Supply and lay 1000mm x 330mm Cut Off Drain Monolithic Polymer
rD
Concrete Channel drain from approved manufacturer,.transport to site and
lay to exact line, level and gradient as required in prepared trench
e
parts, complete with large, high capicity inlet slot (65mm x 47mm) to
te
2-13A-2 -ditto- but 1000mm x 530mm Cut Off Drain Monolithic Polymer Concrete
gu
Provide and lay 300mm nominal diameter precast concrete cut off drain from
approved manufacturer,. transport to site and lay to exact line, level and
k
2-13A-3 m 1,200.00
contains 3 high capacity inlet slot (30mm x 520mm), able to withstand traffic
un
ja
ha
- do - but for precast concrete over slabs 1067x305x127mm thick,
2-14-7 no. 29.90
reinforced with 3 Nos. 12 mm dia. bars and 6 nos. 6mm dia.
sa
- do - but for position precast concrete over slabs 1067x305x127mm thick,
2-14-8 no. 34.50
reinforced with 3 Nos. 16 mm dia. bars and 6 nos. 6mm dia.
L
2-14-9
BK
- do - but for precast concrete over revement slabs 610x762x50mm thick,
no. 38.00
reinforced with 2 layers of BRC A10 wire mesh reinforcement or equivalent.
rD
site in the Wilayah Persekutuan Kuala Lumpur precast concrete over slabs
nd
6mm dia. distribution bars all as per detail JKPB DBKL drawing.
n
-ditto- but slabs 610x610x100 mm. thick reinforced with 6 Nos. 10mm dia.
2-14-11 no. 28.80
aa
-ditto- but slabs 711x610x100 mm. thick reinforced with 6 Nos. 10mm dia.
2-14-12 no. 31.10
gu
-ditto- but slabs 838x610x100 mm. thick reinforced with 6 Nos. 16mm dia.
tu
2-14-14
bars and 6 Nos. 6mm dia. distribution bars no. 38.00
un
-ditto- but slabs 915x305x100 mm. thick reinforced with 3 Nos. 12mm dia.
2-14-15 no. 23.00
bars and 6 Nos. 6mm dia. distribution bars
-ditto- but slabs 1067x305x127 mm. thick reinforced with 3 Nos. 12mm dia.
2-14-16 no. 25.30
bars and 6 Nos. 6mm dia. distribution bars
-ditto- but slabs 1067x305x127 mm. thick reinforced with 3 Nos. 16mm dia.
2-14-17 no. 28.80
bars and 6 Nos. 6mm dia. distribution bars
Provide all necessary tools, machineries and labour to carefully take out
2-14-18 existing slab and after remedies works (measured separate) and relay to no. 50.00
position as directed by the Engineer or SO.
-ditto- but revement slabs 610x762x50mm. thick reinforced with 2 layers of
2-14-18 no. 32.20
BRC A10 wire mesh reinforcement or equivalent
PRECAST CONCRETE SLAB FOR MANHOLES
2-14-19 Provide and lay in position precast concrete cover slabs 1443x305x100
thick reinforced with 3 Nos. 12 mm dia. bars and 8 Nos. of 6 mm dia.
distribution bars all as per details in Drg. No.SP/0003/11.90 JKA
1260/3A. no. 59.80
ITEM DESCRIPTION UNIT RATE
ja
RENDERING
ha
Rendering to concrete or brick surfaces with portland cement mortar 20mm
sa
2-15-4 mixture 1:3 finished with steel float and include for any necessary screed
backing and preparatory work. m2 15.00
L
2
2-15-5 -ditto- but using high alumina cement. BK m 18.00
2-16
rD
RUBBLE WALL AND RUBBLE PITCHING
2-16-1 Supply all necessary materials and labour and construct mass limestone
e
jointing and flush pointing faces with cement mortar 1:3. 161.00
n
2-16-2 Supply all necessary materials and labour and construct rubble pitching
aa
average face size blocks should be not less than 225mm by 150mm.
gu
Include for jointing and filling interstices with 1:3:6-19mm concrete. m2 40.30
ke
2-16-3 Supply and build into limestone rubble wall or pitching 75mm dia.
earthenware pipes 300mm long to form weep holes. no. 3.50
k
tu
2-16-4 Supply and build into limestone rubble wall or pitching 75mm dia.
un
2-16-5 Supply and lay 75mm to 125mm crushed stone as packing behind
retaining walls to form weep holes. Include for packing interstices with
1:3:6-19mm concrete and jointing and flush pointing faces with cement
mortar 1:3 m3 46.00
2-16-6 -ditto- but 150mm to 225mm crushed stone and -ditto- m3 63.30
ITEM DESCRIPTION UNIT RATE
ja
Wrot timber formwork and shuttering to concrete columns, piers, retaining wall
ha
2-18-2 abutments etc. exceeding 1.5m high. but not exceeding 3.0m. Include for all fixing, m2 45.00
supply of timber and fastenings, cutting and waste and for removal on completion.
sa
Wrot timber formwork and shuttering to concrete columns, piers, retaining wall
L
2-18-3 abutments etc. exceeding 3.0m high. but not exceeding 4.5m. Include for all fixing, m2 48.00
BK
supply of timber and fastenings, cutting and waste and for removal on completion.
rD
2-18-4 All as per item 2-18-1 but sides of beams edges of slab. m2 40.00
All as per item 2-18-1 but to soffit of suspended floors, slabs in manholes and
m2
e
2-18-5 40.00
beams. Include for necessary centering.
nd
REINFORCEMENT
n
Supply and fix in position mild steel bars of diameter 6-16mm. Include for cutting,
2-19-1 kg. 3.80
aa
bending and waste and for tying up bars, and keeping them rigidly in position.
n
Supply and fix in position mild steel bars of diameter exceeding 16 mm. Include for
gu
2-19-2 cutting, bending and waste and for tying up bars, and keeping them rigidly in kg. 3.80
position.
ke
Supply and fix in position HIGH YIELD steel bars of diameter 6-16mm. Include for
2-19-3 cutting, bending and waste and for tying up bars, and keeping them rigidly in kg. 3.80
k
position.
tu
Supply and fix in position HIGH YIELD steel bars of diameter exceeding 16 mm.
un
2-19-4 Include for cutting, bending and waste and for tying up bars, and keeping them kg. 3.80
rigidly in position.
Supply and lay BRC fabric No. A8 or equivalent, include for fixing, bending if
2-19-5 necessary and for overlapping sheets 300mm along cross wires at joints and all m2 13.20
cutting and waste.
2-19-6 -ditto- but B.R.C. FABRIC A9. m2 14.40
2-19-7 -ditto- but B.R.C. FABRIC A10. m2 16.80
2
2-19-8 -ditto- but B.R.C. FABRIC B10. m 21.60
STEEL GRATING
Supply and fix in position steel grating 610mmx457mm including frame to required
2-19-9 no. 132.00
level and position and all as per detail in the drawing.
2-19-10 -ditto- but for 610mm x 610mm steel grating. no. 177.60
2-19-11 -ditto- but for 711mm x 610mm steel grating . no. 207.60
2-19-12 -ditto- but for 838mm x 610mm steel grating . no. 240.00
2-19-13 -ditto- but for 915mm x 610mm steel grating. no. 288.00
ITEM DESCRIPTION UNIT RATE
ja
Supply and fix in position Hot dip Galvanized Iron Grating 610mm x 457mm (using 75mm
2.19.26 x 75mm x 6mm Angle Frame) including frame to required level and position and all as no. 300.00
ha
per detail in the drawing)
sa
2-19-27 -ditto- but for Grating size 610mm x 610mm no. 396.00
2-19-28 -ditto- but for Grating size 711mm x 610mm no. 480.20
L
2-19-29 -ditto- but for Grating size 838mm x 610mm BK no. 552.00
Supply and fix in position Hot dip Galvanized Iron Grating 610mm x 457mm (using 30mm
rD
2.19.30 x 30mm x 5mm Angle Frame and hinge to hook Steel Grating) including frame to no. 132.00
required level & position & all as per detail in the drawing)
e
nd
2.19.31 -ditto- but for Grating size 610mm x 610mm no. 174.00
2.19.32 -ditto- but for Grating size 711mm x 610mm no. 198.00
te
2.19.33 -ditto- but for Grating size 838mm x 610mm no. 222.00
n
Supply manhole step-irons of High Yield steel into walls of manholes and sumps as
aa
Supply and install 600mm x 395mm PC Reinforced concrete drain cover slab with
2-19-35 DBKL's Logo, Grade 35 compressed slab 50mm thick to required level and position and no. 158.40
ke
all as per detail in the drawing No. JKA/SP/001/2008, 002/2008 & 003/2008
k
2-19-36 -ditto- but supplied to DBKL's store 600mm x 395mm Precast Concrete in set no. 120.00
tu
Supply and install, galvanised mild steel base frame overall size 610mmx405mmx 5mm
un
thick with angle plate 50x50x5mm thick as per detail in the Drawing no. 144.00
2-19-37 No:JKA/SP/001/2008,002/2008 & 003/2008
Supply and install 750mm x 300mm PC Reinforced concrete gully trap, compressed slab
2-19-38 125mm thick to required level and position and all as per detail in the drawing No.: no. 182.40
JKAWS/SP/005/2008
Supply and install, galvanised mild steel base frame overall size 770mmx340mmx 5mm
2-19-39 thick with angle plate 75x50x5mm thick as per detail in the Drawing No: no. 196.00
JKAWS/SP/004/2008
Supply and lay in position precast concrete 1500mm x 1500mm x 200mm thick,
reinforced with 6 x T12 on top section and 6 x T12 at bottom 200mm centre to centre
2-19-40 no 2500.00
section distribution bars all as per details in Drg. No. JKAWPB 003/2015. Structure is
capable to withstand traffic load up to 50 kN/m 2.
Supply and lay in position precast concrete 1500mm x 1500mm x 250mm thick,
reinforced with 6 x T12 on top section and 6 x T12 at bottom 200mm centre to centre
2-19-41 no 2650.00
section distribution bars all as per details in Drg. No. JKAWPB 003/2015. Structure is
capable to withstand traffic load up to 50 kN/m 2.
Supply and lay in position precast concrete 1500mm x 1800mm x 250mm thick,
reinforced with 6 x T12 on top section and 6 x T12 at bottom 200mm centre to centre
2-19-42 no 2800.00
section distribution bars all as per details in Drg. No. JKAWPB 003/2015. Structure is
capable to withstand traffic load up to 50 kN/m 2.
ITEM DESCRIPTION UNIT RATE
2-21 TURFING
2-21-2 Provide and lay turves of carpet grass (Axonopus Cowpressus) to side
slopes of drain or otherwise as required and include for pegging in
'Close-Turfing' and maintenance and tending until turves thrive. Individual
turves should not be smaller than 225mm by 150mm. The Contractor
shall inform the Engineer of his source of supply of all turves used on the
works. m2 6.50
2-21-3 -ditto- but in 'Close- Turfing' to carriageway sidetables and -ditto- Pegging
is not required. m2 6.00
ja
ha
2-21-4 -ditto- but in 'Spot-Turfing' where specified and 610mm centre to centre.
m2
sa
Pegging is not required. 4.50
L
2-22 SUBSOIL DRAINAGE
BK
rD
2-22-1 Supply and lay fully filtered, prefabricated subsoil drainage system
(according to manufacturer's instruction) equivalent to STRIPDRAIN (by
e
Include for wrapping round and bonding with STRIPDRAIN (by NYLEX).
Ends of STRIPDRAIN to be taped using PVC duct tape. m2 5.00
ke
k
2-22-5 Supply and lay subsoil drainage termination using 100 mm dia. PVC
tu
pipe. Include for cutting slot at the PVC pipes to fit subsoil drainage m 35.00
un
system.
2-22-6 Supply and lay 100 mm dia. class B G.I. pipe. Include for
connection to 100 mm dia. PVC pipe. m 40.00
2-22-7 Supply and lay 100mm Diameter PVC perforated subsoil drainage
covered with geo-textile membrance including excavation, sub-base,
backfill and compaction, bends and joints. m 50.00
2-22-9 Supply and lay 100mm Diameter PVC perforated subsoil drainage
covered with geo-textile membrance including excavation, sub-base,
backfill and compaction, bends and joints. m 50.00
2-23-2 -ditto- but for 750mm dia. and -ditto-. no. 1,760.00
2-23-3 -ditto- but for 900mm dia. and -ditto-. no. 2,200.00
2-23-4 -ditto- but for 1050mm dia. and -ditto-. no. 2,530.00
2-23-5 -ditto- but for 1200mm dia. and -ditto-. no. 2,860.00
2-23-6 -ditto- but for 1350mm dia. and -ditto-. no. 3,190.00
ja
2-23-7 -ditto- but for 1500mm dia. and -ditto-. no. 3,520.00
ha
2-23-8 -ditto- but for 1800mm dia. and -ditto-. MS 3,960.00
sa
2-23-9 -ditto- but for box culvert of area not exceeding 5m2 and -ditto-. MS 1,430.00
L
-ditto- but for box culvert of area not exceeding 5m2 but not exceeding
2-23-10 BK m2 1,375.00
'10m2 and -ditto-.
2-23-11 -ditto- but for box culvert of area not exceeding 10m2 and -ditto-. m2 1,320.00
rD
Manufacture, fabricare and fix flapping aluminium flap gate to pipe culvert
e
2-23-14 'of 600mm dia. with hinge on the concrete structure. Include for all no. 1,848.00
nd
2-23-22 -ditto- but for box culvert of area not exceeding 5m2 and -ditto-. no. 2,002.00
-ditto- but for box culvert of area not exceeding 5m2 but not exceeding
2-23-23 no. 1,925.00
'10m2 and -ditto-.
2-23-24 -ditto- but for box culvert of area exceeding 10m2 and -ditto-. no. 1,848.00
SCHEDULE OF RATES NO. 3: KERBING WORKS
Excavate trench to kerb and foundation not exceeding 450mm and 300mm
depth in pre-approved length and minimize inconvenience to pedestrian &
3-1-2 m 8.00
vehicular traffic and remove immediately excavated material to tips
provided by the contractor
3-1-3 --ditto- but exceeding 300mm deep and not exceeding 600mm -ditto- m 10.50
EXCAVATION TO KERB OUTLET
Excavate trench for 225 mm diameter pipe outlet from kerb 450mm wide
3-2-3 and not exceeding 1.5m deep and remove surplus material from site or as m 9.00
ja
directed by the Engineer or his representatives.
ha
3-3 CONCRETOR
sa
Provide and lay concrete (1:3:6-20mm) in 375x100 mm thick foundation
and 175x100 triangle haunching to kerb and channel block for kerb type
L
3-3-1 m 9.00
"I/II" and include for all mixing and placing. Kerb type "I" and "II" as shown
in Drg. No. 1260/5A.
BK
rD
-ditto- but 300x100 mm thick foundation and 175x100mm triangle
3-3-2 m 10.00
haunching to kerb for kerb type "I/II" only -ditto-.
e
nd
3-3-3 m 11.00
type MI and include all mixing and placing. Kerb Type MI as shown in Drg.
No. JKAL 1260/30.
n
aa
haunching and 75x75mm triangle haunching for kerb type MI only -ditto-
gu
and 150x100 mm triangle haunching and channel blocks for kerb type MII
3-3-5 m 9.00
and include all mixing and placing. Kerb Type MII as shown in Drg. No.
k
JKAL 1260/55
tu
3-3-6 m 8.00
haunching and 75x75mm triangle haunching to kerb Type MII only -ditto-.
Provide and lay concrete (1:3:6 - 19mm agg.) for increasing thickness of
3-3-7 m3 236.00
foundation of kerb or as directed including any formwork.
CONCRETE IN OUTLET KERB
Provide and lay concrete 1:3:6 in base/surround to pipe culvert as directed.
3-3-8 m3 236.00
Include for all mixing and placing as required.
Provide and lay concrete 1:11/2:3 19mm in inlet structure to "outlet kerbs"
3-3-9 m3 250.00
as shown in the Drg. No. JKAL 1260/30.
3-4 PRECAST CONCRETE KERBS AND CHANNEL BLOCKS
Provide and lay straight precast concrete (1:3:6) kerbs type MI of size
610x300x150 mm as in Drg. NO. JKAL 1260/30 refers. Transport to site
3-4-1 m 25.00
and lay to line, level and gradient on prepared concrete bed. Include for
bedding and jointing of kerb in cement mortar (1:2).
-ditto- but precast concrete (1:3:6) outlet kerbs with circular opening type
3-4-2 MI of size 610x300x150 mm as in Drg. NO. JKAL 1260/30 refers and -ditto- m 24.00
.
ITEM DESCRIPTION UNIT RATE
Provide and lay straight precast concrete GRADE 50 with 4 horizontal (2 Top &
2 Bottom) T8 and 3 link R8 Kerb type MI of size 610x300x150 mm as in Drg.
3-4-3 NO. JKAL 1260/30 refers. Transport to site and lay to line, level and gradient on m 265.00
prepared concrete bed. Include for bedding and jointing of kerb in cement
mortar (1:2).
- do - but for outlet kerbs with circular opening type MI of size 610x300x150 mm
3-4-4 m 250.00
as in Drg. NO. JKAL 1260/30 refers and -ditto-
Provide and lay straight precast concrete (1:3:6) kerbs type M11 of size
610x225x150 mm as in Drg. NO. JKAL 1260/30 refers. Transport to site and lay
3-4-4 m 22.00
to line, level and gradient on prepared concrete bed. Include for bedding and
jointing of kerb in cement mortar (1:2).
-ditto- but precast concrete outlet kerbs with circular opening type M11 of size
3-4-4 m 20.00
610x225x150 mm as in Drg. NO. JKAL 1260/30 refers and -ditto-.
ja
Provide and lay straight precast concrete GRADE 50 with 4 horizontal (2 Top &
ha
2 Bottom) T8 and 3 link R8 kerbs type M11 of size 610x225x150 mm as in Drg.
sa
3-4-4 NO. JKAL 1260/30 refers. Transport to site and lay to line, level and gradient on m 250.00
prepared concrete bed. Include for bedding and jointing of kerb in cement
L
mortar (1:2).
BK
-ditto- but precast concrete GRADE 50 with (2 Top & 2 Bottom) T8 and 3 link
rD
3-4-4 R8 reinforcement outlet kerbs with circular opening type M11 of size m 225.00
610x225x150 mm as in Drg. NO. JKAL 1260/30 refers and -ditto-.
e
nd
EXTRUDED KERB
Supply and lay Semi Mountable Extruded Kerb size 300mm X 250mm (Type
te
capabilities.
n
3-4-6 m 75.00
(Type SM1) - do -
ke
3-4-7 - do - but for Barrier Extruded Kerb size 300mm X 250mm (Type B) - do - m 68.00
k
3-4-8 - do - but for Barrier Extruded Kerb size 300mm X 550mm (Type B1) - do - m 75.00
tu
un
3-4-12 - do - but for Extruded Kerb size 325mm X 625mm (Type l) - do - m 79.00
3-4-13 - do - but for Extruded Kerb size 275mm X 250mm (Type ll) - do - m 68.00
3-4-14 - do - but for Verge/Footway Kerb size 150mm X 600mm (Type lll) - do - m 68.00
3-4-15 - do - but for Extruded Kerb size 275mm X 625mm (Type lV) - do - m 68.00
Provide and lay channel blocks (P.C.) precast concrete (1:3:6) size
3-4-18 600x150x75 mm straight over prepared concrete bed and to line, level and m 7.00
gradient and include for bedding and jointing in cement mortar (1:2).
Provide and lay channel blocks (P.C.) precast concrete GRADE 50 with (2
Top & 2 Bottom) T8 and 3 link R8 size 600x150x75 mm straight over
3-4-19 m 16.00
prepared concrete bed and to line, level and gradient and include for
bedding and jointing in cement mortar (1:2).
Supply and lay GRANITE / NATURAL STONE Type Ml Size 610x300x150
mm as per JKPB Drawing to be transport to site and lay to line, level and
3-4-20 m 825.00
gardient on prepared concrete bed. Rate shall include concrete bedding
and jointing with approved cement mortar.
Supply and lay GRANITE / NATURAL STONE kerb Type Mll Size
610x225x150 mm as per JKPB Drawing to be transport to site and lay to
3-4-21 m 730.00
line, level and gardient on prepared concrete bed. Rate shall include
ja
concrete bedding and jointing with approved cement mortar.
ha
Supply and lay GRANITE / NATURAL STONE channel block size
sa
600x150x75 mm straight over prepared concrete bed and to line, level and m 165.00
gradient and include for bedding and jointing in cement mortar (1:2).
L
3-5 PIPE OUTLET FROM KERB. BK
rD
3-5-1 Purchase from approved manufacturer 225 mm dia. butt jointed spun
concrete pipes transport to site and lay on prepared concrete bed. Pipes
e
3-6 BRICKWORK.
n
3-6-1 Supply approved wire cut bricks and build 225mm thick brickwork wall to
aa
sumps. Include for laying and jointing cement mortar (1:3) and for
n
rendering all exposed faces with cement mortar 12 mm thick (1:3). m2 72.00
gu
to site and lay on prepared concrete bed, Including all cutting and waste.
tu
3-7-2 -ditto- for Elbow pipe (225mm diameter)and -ditto-. no. 33.80
ITEM DESCRIPTION UNIT RATE
4.1 PENAMPALAN
Tampalan ’Pothole’
Penandaan
Sempadan kawasan yang hendak ditampal dikenal pasti hendaklah di tanda
dan biasanya garisan berbentuk segiempat adalah yang paling sesuai. Semua
bahagian yang rosak hendaklah berada di dalam sempadan garisan
Pemotongan
Kawasan yang telah ditanda hendaklah dipotong dengan kemas 50mm tebal
dan bahagian yang rosak dikeluarkan dengan menggunakan peralatan yang
sesuai
Pembersihan
Permukaan kawasan yang hendak ditampal hendaklah dibersihkan, dan
dipastikan agar sentiasa kering. Penggunaan vakum udara adalah dicadangkan
bagi tujuan ini
Penyemburan Bituminous Emulsion ’Tack Coat’
Lapisan tack coat hendaklah disembur dengan seragam ke atas permukaan
ja
kawasan untuk menggalakkan lekatan antara lapisan lama dan baru.
ha
Penampalan Dan Pemadatan
sa
Campuran premix dimasuk ke dalam kawasan tampalan menggunakan
penyodok secara manual. Pemadatan perlu di bahagian tengah kawasan
L
tampalan dan diikuti dengan bahagian pinggir.
Pembersihan
BK
rD
Pembersihan kawasan kerja untuk memastikan kerja tampalan yang
dilaksanakan lebih komprehensif.
e
4-1-3 Merata ”Pavement Crack Sealant CS 53” atau seumpamanya yang 300.00
tu
dibenarkan beserta pasir halus yang kering, bersih dan ditapis sahaja
un
Extra over for item 4-2-1 and 4-2-2 for carting away surplus excavated material to
4-2-5 m3 5.20
tips, exceeding 4.5 Km radius, to be provided by the contractor.
Supply crusher run stone from an approved quarry and spread over formation, fill
ja
interstices with a proportion of smaller gauge stones packed to a consolidated
4-2-6 m2 20.30
ha
thickness or not less than 225mm and roll in two layers each of 112.5mm with a
roller of not less than 8 tonne weight true to line, camber and level.
sa
-ditto- but to a consolidated thickness of not less than 300mm and roll in three
4-2-7 m2 27.00
layers each of 100mm and -ditto-.
L
4-2-8
BK
-ditto- but to a consolidated thickness or not less than 375mm and roll in four layers
m2 33.80
each of 95mm and -ditto-.
rD
-ditto- but to a consolidated thickness or not less than 450mm and roll in four layers
4-2-9 m2 40.50
each of 112.5mm and -ditto-.
e
nd
Supply cationic bitumen emulsion (RS-1K) and spread at an approximate rate of 0.4
4-2-10 m2 2.00
- 0.5 litres/m2 over consolidated road base.
te
consolidated thickness of not less than 50 mm with a roller of not less than 10 tonne
weight or an approved vibratory roller as directed by Enginneer.
n
gu
4-3-1 Cut existing road surface to a depth not less that 50mm with a mechanical cutter m 7.00
tu
un
Excavate to break up existing road pavement including the crusher run base to a
4-3-2 m2 10.00
depth not exceeding 325mm. and dispose to sites to be provided by the Contractor.
-ditto- as Item 4-3-2 above but to a depth exceeding 325mm, and not exceeding
4-3-3 m2 12.50
400mm, and -ditto-
-ditto- at Item 4-3-2 above but to a depth exceeding 400mm, and not exceeding
4-3-4 m2 15.00
475mm and -ditto-
Extra over Item 4-3-2, 4-3-3 and 4-3-4 above for excavation through soft patches of
4-3-5 m3 18.00
existing sub-grade and dispose to sites to be provided by the contractor.
Extra over Item 4-3-2, 4-3-3 and 4-3-4 above for excavation through existing sub-
4-3-6 grade to depth not exceeding 1 00mm, and dispose to sites to be provided by the m2 3.00
Contractor.
Supply and spread sand or other approved sub-base materials over existing sub-
4-3-7 grade or to replace excavated sub-grade materials as per Item 4-3-6 above and m2 9.00
compact to a consolidated thickness of not less than 100mm
ITEM DESCRIPTION UNIT RATE
4-3-8 Supply sand or other approved sub-base materials, fill and compact to
levels as directed m3 45.00
4-3-9 Supply crushed aggregates from an approved quarry, spread and
compact over formation in two equal layers to a consolidated thickness
of not less than 225mm true to line, level and camber. m2 20.00
4-3-10 -ditto- as Item 4-3-9 above but spread and roll in three equal layers to a
consolidated thickness of not less than 300mm. m2 24.00
4-3-11 -ditto- as Item 4-2-9 above but spread and compact in three equal layers
to a consolidated thickness of not less than 375mm m2 28.00
4-3-12 Supply cationic bitumen emulsion (RS-1K) and spread at an
approximate rate of 0.4 - 0.5 litres/m2 over consolidated road base. m2 2.00
4-3-13 Purchase approved premixed asphaltic concrete, transport to site, lay
ja
and compact to a consolidated thickness of not less than 80mm as a
ha
binder course (mix ACB). m2 37.00
sa
4-3-14 Purchase approved premixed asphaltic concrete, transport to site, lay
and roll to a consolidated thickness of not less than 50mm as a wearing
L
course (mix ACW1 or ACW2). m2 24.00
4-4 Regulation Works
BK
rD
undulations. m2 2.00
te
4-4-3 -ditto- as per item 4-4-2 but for carrying out works in sidelanes/backlanes
having reserves of not more than 6.10 metres M. Ton 230.00
n
gu
(Note: Works under Item 4.4 may or may not be required 'depending
on the conditions of the roads to be overlaid 'or as instructed by the
ke
Engineer)
4-5
k
Overlay
tu
approximate rate of 0.4 - 0,5 litres/m2 over existing road surface. m2 2.00
4-5-2 Purchase approved premixed asphaltic concrete, transpot to site lay and
roll to a consolidated thickness of not less than 40mm as a wearing
course (mix ACW1 or ACW2). m2 26.00
4-5-3 -ditto- as per item 4-5-2 but for carrying out works in sidelanes/
backlanes having reserves of not more than 6 metres, ntrances of
houses/premises and road humps to line, level and profile as
directed by the Engineer. m2 26.00
ITEM DESCRIPTION UNIT RATE
ja
Supply cationic bitumen emulsion (RS-2K) as specified and spread at an
ha
4-7-1 approximate rate of 0.4 to 0.5 litres/m2 over the milled and cleaned surfaces or m2 2.50
existing pavement surfaces.
sa
Purchase approved stone mastic asphalt (with premium grade bitumen) as
L
4-7-2 specified transport to site, lay and roll to a consolidated thickness of not less m2 70.00
than 50mm. BK
rD
4-8-1 Mill 50mm in single pass over existing pavement, clean and dispose
waste to DBKL store as directed by the Engineer m2 8.00
te
n
approximate rate of 0.4 to 0.5 litres/m2 over the milled and cleaned
n
4-8-4 Supply, mix (using an approved continuous flow mixer), pump and
spread approved mortar (coloured) over the open graded asphaltic
concrete (50mm thick) as specified. The finished surface to be broomed
just before initial set. (NB: Colour to be either RED, GREEN, YELLOW,
BLUE or RED. m2 185.00
4-8-5 All as per item 4-8-4 above but approved mortar to be ORIGINAL
(ie GREY) in colour. m2 175.00
ITEM DESCRIPTION UNIT RATE
4--9-1 Supply all labour, materials, tool, barricades road signsandsand raise or
lower Jabatan Bekalan Air (JBA) chambers Type 'B' to the finished road
level inclucling hacking existing brick and/or concrete foundation to frame
and giving protection for new works to set, all in accordance to drawing
No. JKA/SP/MH - Syit 2. no. 500.00
4-9-2 -ditto- but SYABAS chambers Type 'E' and -ditto- no. 500.00
ja
ha
4-9-3 -ditto- but SYABAS chambers Type 'E' extra large and -ditto- no. 600.00
sa
4-10 Jabatan Pembetung & Perparitan (JP&P) / IWK Manholes
L
BK
4-10-1 All as per item 4-9-1 above but to raise or lower Jabatan Pernbetungan &
Perparitan / IWK heavy-duty cast iron manhole cover and frame all in
rD
4-10-1 All as per item 4-9-1 above but to raise or lower TM Type 3E manhole
n
aa
cover and frame of dimension 2' x 2' all in accordance to drawing No.
JKA/SP/MH - Syit 3 and -ditto- no. 800.00
n
gu
4-11-2 -ditto - but TM Type '7E' manhole cover and frame of dimension 3' x 2' no. 900.00
ke
-ditto-
k
tu
un
ITEM DESCRIPTION UNIT RATE
Supply all labour, materials and equipment to apply white or yellow HOT
THERMOPLASTIC markings (minimum 3mm thickness) as Edge lines,
Center lines, Give-way lines, Yellows Bars, Yellow Boxes or any
4-12-1 Continuous line on road pavements as directed by the Engineer using m2 25.00
theCenter lines, Give-way lines, Yellows Bars, Yellow Boxes or any
SCREED METHOD all as per Specification. Rate shall include the cleaning
of road surface by water jetting and preliminary setting-out
-ditto- as per Item 4-12-1 above but as Arrows, Alphabets or any special
4-12-2 m2 35.00
symbols as directed by the Engineer.
ja
lines, Center lines, Give-way lines, Yellows Bars, Yellow Boxes or any
Continuous line on road pavements as directed by the Engineer using
ha
4-12-3 m2 120.00
theCenter lines, Give-way lines, Yellows Bars, Yellow Boxes or any
sa
SCREED METHOD all as per Specification K1 in the document. Rate shall
include the cleaning of road surface by water jetting and preliminary setting-
L
out
BK
-ditto- as per Item 4-12-3 above but as PREFORMED TAPE to design and
4-12-4 m2 200.00
rD
lay Arrows, Alphabets or any special symbols as directed by the Engineer.
e
shall include the cleaning of road surface by water jetting and preliminary
n
setting-out
aa
Supply all labour and tools to trim, and clear edges of carriageways prior
ke
to the above mentioned works of all grass, vegetations silt and others as
instructed by the Engineer. Rate to include for carting away to dumps to
k
1.50
un
SCHEDULE OF RATES NO. 5: FOOTPATH WORKS
Supply all plant and labour and excavate to formation level to a depth not
exceeding 150mm in pre-approved lengths to minimise inconvenience to
5-1-1 pedestrian and vehicular traffic and remove immediately all excavated materials m2 2.20
away from site as directed. Roll to formation with a roller of not less than 2
tonne weight or compact with a powered wacker to consolidate sub-grade.
Extra excavation to item 5-1-1 for breaking through premix footpath not
5-1-2 m2 2.80
exceeding 100mm thick.
Supply quarry dust from an approved quarry, spread and roll whole with a roller
5-1-3 of not less than 2 tonne or an approved vibratory roller to a consolidated m3 20.00
thickness of not less than 100mm.
Supply cationic bitumen emulsion (RS-1K) and spread at an approximate rate of
5-1-4 m2 2.00
0.4 - 0.5 litres/m2 over consolidated road base.
ja
5-1-5 m2 10.00
consolidated thickness of not less than 25 mm with a roller of not less than 2
ha
tonne weight or an approved vibratory roller as directed by Enginneer.
sa
INTERLOCKING CONCRETE PAVING,CLAY PAVER GRANITE TILED &
5-2
L
MISCELLANEOUS FOOTPATH
BK
Supply all plant and labour and excavate to formatiom level to depth not
exceeding 100mm and cart all excavated materials away from site as directed.
5-2-1 m2 2.00
rD
Roll formation with a roller of not less than 2tonne weight to consolidate the sub-
grade.
e
5-2-2 -ditto- but exceeding 100mm and not exceeding 200mm and -ditto-. m2 3.50
nd
5-2-3 Supply crusher run stone from an approved quarry and spread over
te
packed to a consolidated thickness or not less than 100mm and roll with
aa
a roller of not less than 2 tonne weight true to line, camber and level. m2 9.00
n
5-2-4 Supply approved sand, transport to site spread, roll and consolidate to
gu
thickness lees than 30mm with a roller of not less than 2 tonne weight. m2 4.00
ke
5-2-5 Provide and lay 1:2:4 20mm aggregate concrete in edge restrain. Include
for all mixing, placing vibrating and consolidating as required. Include
k
m3
tu
5-2-6 Supply and lay approved interlocking paving units to approved colour(s)
and pattern(s) of 60mm thick (35 Mpa) from approved manufacturer having
twin-wide spacer locking system, anti-fungal characteristics, and green
label certifaction, ISO 14001:2004 certification for the paving unit,
transport to site and lay to exact line, level and gradient as required on
prepared sand bedding as described. m2 65.00
5-2-7 -ditto- but for 60mm heavy duty interlocking paving units (45 Mpa) and -ditto-. m2 75.00
5-2-8 -ditto- but for 80mm heavy duty interlocking paving units (45 Mpa) and -ditto-. m2 85.00
5-2-10 -ditto- but for 80mm heavy duty permeable interlocking paving units -ditto- m2 80.00
ITEM DESCRIPTION UNIT RATE
ja
and consolidate with an 8 ton roller or powered wacker true to line,
ha
camber and level to a consolidated thickness of not less than 100mm.
sa
Supply approved sand, spread over crusher-run stone foundation, roll and
consolidate to thickness not less than 30mm with roller not less than 2
L
tonne weight or powered wacker. Lay the existing interlocking paving
BK
units back to exact line, level and gradient as required on the prepared
sand bedding as described. m2 24.00
e rD
5-2-15 Provide labour and materials, carefully take out existing interlocking
nd
Engineer. m2 12.00
n
CLAY PAVER
aa
Supply and lay approved 50mm CLAY PAVER to approved colour(s) and
n
2
5-2-18 -ditto- but 70mm CLAY PAVER and -ditto-- m 70.00
tu
Provide and lay 50mm thick 1:2:4 20mm aggregate concrete as base for
laying COMPRESSED DECORATIVE CONCRETE TILES inclusive of steel
5-2-19 m2 50.00
reinforcement type BRC fabric No. A10 concrete base to include expansion
joint of epoxy type at every 10 meter intervals.
Supply and lay approved COMPRESSED DECORATIVE CONCRETE
TILES 400mm X 400mm dimensions with exposed chippings or short
blasted texture to approved colour, pattern and surface texture of 50mm
5-2-20 m2 120.00
thickness from approved manufacturer, trasport to site and lay to prepared
concrete base as described and 100mm crusher run surface measured
separetely.
5-2-22 Supply and lay 5mm x 100mm premolded expansion joint filler m 8.00
5-2-23 Supply and lay 5mm x 15mm joint sealer m 12.00
2
5-2-24 Supply and lay 15mm thick levelling screed m 10.00
Supply and lay Unglazed Homogenous Granite Tile 95mm x 95mm x 11mm
5-2-25 over newly laid concrete bedding using 6mm Latex Portland Bonding Cement m2 95.00
Mortar and Portland Cement as grout joint.
5-2-26 - do - 95mm x 95mm x 15mm ditto m2 130.00
2
5-2-27 '- do - for Unglazed Homogenous Granite Tile size 87mm x 97mm x 15mm m 120.00
Supply and lay Granolitic Finish Over newly laid concrete bedding using
5-2-28 m2 48.00
LOCAL Chipping
Supply and lay Non-Slip Heavy Duty Homogenous Extruded Split Tile size
5-2-29 145mm x 145mm x 15mm over newly laid concrete bedding using Latex m2 135.00
ja
Partland Bonding Cement Mortar and Portland Cement as grout joint.
ha
Supply and lay Unglazed Split Quarry Tiles (size 204mm x 204mm x 25mm)
sa
over newly laid concrete bedding with cement screed using Latex Portland
5-2-30 Bonding Cement Mortar and Portland Cement as grout joint all in accordance m2 80.00
to the manufacturer's specification. The colour and pattern of the tiles shall be
L
as approved by the Engineer. BK
Supply and lay Decorative Coloured Pigmented Concrete Slab Finish size
rD
400mm x 400mm x 40mm over newly laid concrete bedding cement screed
5-2-31 using Latex Portland Bonding Cement Mortar and Portland Cement as grout m2 125.00
e
Supply and lay Shot-Blasted Exposed Chipping Concrete Slab Finish size
400mm x 400mm x 40mm over newly laid concrete bedding cement screed
n
5-2-32 using Latex Portland Bonding Cement Mortar and Portland Cement as grout m2 135.00
aa
Supply and lay rumble (Cobble) Compressed Concrete Paving Slab Multiple
ke
dimension finish size with 40mm thick from approved manufacturer having anti-
fungal characteristic and green label certification, and ISO 14001:2004
certification, over newly laid concrete bedding cement screed using Latex m2 135.00
k
tu
Portland Bonding Cement Mortar and Portland Cement as grout joint all in
accordance to the approved manufacturer's specification. The colour, pattern,
un
5-3-3 Supply and installed Recycle Rubber Bollard type C no. 460.00
5-3-4 Supply and installed Recycle Rubber Bollard type D no. 440.00
5-3-5 Supply and installed Recycle Rubber Bollard type E no. 465.00
5-4-1 12mm thick 1:3 cement and rendering to floor, steps, apron, drain etc m2 9.60
ja
5-4-2 19mm thick -ditto- m2 11.40
ha
m2
sa
5-4-3 25mm thick -ditto- 13.20
L
5-4-4 37mm thick -ditto- m2 18.00
BK
5-4-5 12mm thick granolithic finish rendering to floor, steps, apron, kerb etc. m2 72.00
e rD
m2
aa
5-5
gu
5-5-1 Supply and lay 20mm thick to line and level as spcification and drawing
on reinforced concrete with stensil decorative pattern m2 50.00
k
tu
un
Scope Of Work
To supply labour, materials and all necessary equipment to complete
a good sub-grade to receive the insitu paving system, all done in
accordance to consultant specification :-
5-6-1 To supply and lay 50mm thick Grade 25 ready-mixed concrete c/w
one layer of BRC A4/46/A7 wire reinforcement over existing complete
sub-grade. m2 19.00
ja
5-6-2 -ditto 75mm thick -ditto- m2 24.00
ha
m2
sa
5-6-3 -ditto 100mm thick -ditto- 29.00
L
5-6-4 -ditto 150mm thick -ditto- m2 39.00
BK
5-7
rD
Surface Work Only
e
0.13kg/m2 and emboss to require pattern and sealing with one coat of
ke
6-1 FENCING
Carefully take out existing chain link fencing not exceeding 2.0m high and re-
6-1-1 erect in new position. Include for necessary exacavation, concrete foundation m 6.00
to posts and fixing of fence, size of hole for post to be 300x300x450mm.
-ditto- but chain link fencing exceeding 2.0m and not exceeding 4.0m high
m 8.00
6-1-2 and -ditto-.
Supply and erect chain-link fencing not exceeding 2.0m high. Include for
6-1-3 necessary excavation, concrete foundation and steel post as shown in the m 75.00
Drg. No.JKAL1260/15.
6-1-4 -ditto- but not exceeding 1.0m height and -ditto-. m 50.00
ja
Take out and remove existing chain-link fencing and transport to Dewan
ha
6-1-5 Bandaraya Store, Jalan Cheras. Include for necessary excavation to remove m 4.00
all concrete foundation and other fixed i.e post etc.
sa
-ditto- but existing barbed wire fence and transport to Dewan Bandaraya
6-1-6 m 2.50
L
Store, Jalan Cheras or other location as directed by Engineer
BK
Carefully take out existing barbed wire fence not exceeding 2.0m high and re-
rD
6-1-7 erect in new position. Include for necessary exacavation, concrete foundation m 4.00
to posts.
e
nd
6-2-1 ( Enamel paint ) as follows in accordance with clause 5.1.3, Section B of the
n
Specification.
aa
Supply all labour and plant and excavate to and dismantle existing damage
k
6-2-2 provided by contractor or as directed by the Engineer. Include for any cutting m 19.00
un
and breaking up all concrete footing. Rate shall include filling up hole with
cement or approved earth and make good the surface.
Supply all material and labours, fabricate and erect on site straight and
curved pedestrian guardrails all as shown in Drg. No. JKAL 1260/13B.
6-2-3 m 175.00
Include for excavation, concrete footing, welding and painting in accordance
with item 6-2-1.
6-2-4 Supply all material and labours and fabricate and erect on site
straight and curved pedestrian guardrails all as shown in Drg. No. JKAL
1079A. Include for excavation, concrete footing, welding and painting in
accordance with item 6-2-1 m 135.00
Supply all material and labours and fabricate and erect on site pedestrian
6-2-5 guardrails all as shown in Drg. No. JKAL 1234/1. Include for excavation, m 210.00
concrete footing, welding and painting in accordance with item 6-2-1
ITEM DESCRIPTION UNIT RATE
Supply all material and labours and fabricate and erect on site pedestrian
NKEA Greater KL's guardrails all as shown in Drg. for type 1, 6, 7, 10 and 12.
6-2-6 m 250.00
Include for excavation, concrete footing, welding and painting in accordance
with item 6-2-1
Supply all material and labours and fabricate and erect on site pedestrian
6-2-7 guardrails all as shown in Drg. No. JKAL 1260/44. Include for excavation, m 205.00
concrete footing, welding and painting in accordance with item 6-2-1.
6-2-8 -ditto- but all as shown in Drg. No. JKAL 1260/47 and -ditto-. m 170.00
6-2-9 -ditto- but all as shown in Drg. No. JKAL 1260/48 and -ditto-. m 155.00
-ditto- but railing all as shown in Drg. No. JKAL 1260/45 (excluding post).
6-2-10 m 185.00
Include for cutting and welding.
6-2-11 -ditto- but only the post all as shown in Drg. No. JKAL 1260/45 and - do -. No. 85.00
-ditto- but parapet railing all as shown in Drg. No. JKAL 1260/46/1 (excluding
6-2-12 m 145.00
the post ) and - do -.
6-2-13 -ditto- but only the post all as shown in Drg. No. JKAL 1260/46/1 & - do - No. 150.00
ja
-ditto- but parapet railing all as shown in Drg. No. JKAL 1260/46/2 (excluding
ha
6-2-14 m 150.00
the post ) and -ditto-.
sa
6-2-15 -ditto- but only the post all as shown in Drg. No. JKAL 1260/46/2 and -ditto-. No. 118.00
L
6-2-16 -ditto- but all as shown in Drg. No. JKAL 1260/49 (excluding post ) & - do - m 165.00
6-2-17
BK
-ditto- but only the post all as shown in Drg. No. JKAL 1260/49 and -ditto-. No. 95.00
rD
6-2-18 -ditto- but all as shown in Drg. No. JKAL 1260/50 (excluding post) & - do - m 182.00
e
6-2-19 -ditto- but only the post all as shown in Drg. No. JKAL 1260/50 and -ditto-. No. 130.00
nd
6-2-20 -ditto- but railing all as shown in Drg. No. JKAL 1260/53 (excluding post) & - do - m 205.00
te
6-2-21 -ditto- but only the post all as shown in Drg. No. JKAL 1260/53 and -ditto-. No. 200.00
n
aa
6-2-22 -ditto- but railing all as shown in Drg. No. JKAL 1260/54 ( excluding post) - do - m 270.00
n
6-2-23 -ditto- but only the post all as shown in Drg. No. JKAL 1260/54 and -ditto-. No. 195.00
gu
-ditto- but railing all as shown in Drg. No. JKAL/SP/020/8-93 syit 1 & syit 2
6-2-24 m 850.00
(excluding the post ) and -ditto-.
ke
-ditto- but only the post all as shown in Drg. No. JKAL/SP/020/8-93 syit 1 & syit
6-2-25 No. 1,050.00
k
-ditto- but G.I. pipe post, complete with bracket and erect on site all as shown
un
6-2-26 m 240.00
in Drg. No. JKAL 1260/56. Include for cutting and welding.
6-2-27 -ditto- but G.I. pipe post, complete with bracket and erect on site all as
shown in Drg. No. JKAL 1260/56. Include for breaking up concrete parapet,
concrete ( 1: 2: 4 mix ), formwork and rendering the surfaces with
Shanghai Plaster to match the existing surfaces. No. 105.00
6-2-28 Supply all materials and labour, fabricate and erect on site straight and
curved pedestrian guardrails all as shown in Drg. No. JKAL 1260/64 type P.
Include for excavation, concrete footing, welding and painting in
accordance with Clause 5.1.3 of the Specification. m 195.00
6-2-29 -ditto- but all as shown in Drg. No. JKAL 1260/64 type R and -ditto-. m 200.00
6-2-30 -ditto- but all as shown in Drg. No. JKAL 1260/64 type S and -ditto-. m 212.00
ITEM DESCRIPTION UNIT RATE
6-2-32 -ditto- but all as shown in Drg. No. JKAL 1260/64A/1 type T and -ditto-. m 210.00
6-2-33 -ditto- but all as shown in Drg. No. JKAL 1260/64A/1 type U and -ditto-. m 232.00
6-2-34 -ditto- but all as shown in Drg. No. JKAL 1260/64A/2 type V and -ditto-. m 375.00
6-2-35 -ditto- but all as shown in Drg. No. JKAL 1260/64A/2 type W and -ditto-. m 370.00
6-2-36 -ditto- but all as shown in Drg. No. JKAL 1260/64A/2 type X and -ditto-. m 358.00
6-2-37 -ditto- but all as shown in Drg. No. JKAL 1260/64A/2 type Y and -ditto-. m 360.00
6-2-38 -ditto- but all as shown in Drg. No. JKAL 1260/64A/2 type Z and -ditto-. m 185.00
Supply all labour and plant and excavate to and remove carefully existing
straight and curved guardrails and shown in Drg. No. JKAL 1260/13B, JKAL
1260/44, JKAL 1260/47, JKAL 1260/48, JKAL 1260/51, JKAL 1260/52,
6-2-39 m 80.00
JKAL 1079A, JKAL 1234/1, JKA 1260/64 & JKA 1260/64A and resite to
new position as directed by Pengarah. Include for excavation, cutting,
welding and concrete footing.
Extra over for Item 3.4 to Item 3.37 for transporting part or whole section of
ja
6-2-40 railings or posts for hot dip galvanising as described in clause 7.2.7 Section Kg. 6.00
ha
D of the specification.
6-3 CORRUGATED SHEET GALVANISE STEEL BEAM HIGHWAY
sa
GUARDRAIL.
Supply all labour and plant, dismantle and take out timber guardrail post of
L
all sizes all as shown in Drg. No. JKAL 1260/6B and dispose the same at
6-3-1 BK
site to be provided by contractor or as directed by the Engineer. Include for
No. 9.80
any excavation.
rD
-ditto- but for galvanised iron post all as shown in Drw. No. JKAL1260/6C
6-3-2 No. 24.00
and -ditto-. Include for any excavation and breaking up of concrete footing.
e
6-3-3 -ditto- but for damaged sheet galvanised steel beams and - do - M 9.35
nd
6-3-4 length ( 3.81 m ) all as shown in Drg. No. JKAL 1260/6B & 6C to Dewan Pcs. 350.00
Bandaraya Store at Jalan Cheras.
n
Supply and fix in position straight corrugated sheet galvanised steel beam.
aa
6-3-5 Include for jointing with bolts and nuts all as shown in Drg. No. JKAL M 185.00
n
-ditto- but galvanised iron post with single spacing block all as shown in
6-3-7 Drg. No. JKAL 1260/6C. Include for excavation and jointing with bolts and No. 378.00
k
6-3-8 -ditto- but post with double spacing block and -ditto-. No. 420.00
un
6-3-9 -ditto- but galvanised iron spacing block and -ditto-. No. 108.00
Supply and fix in position reflector to steel beam as directed by the
6-3-10 No. 40.00
Engineer all as shown in Drg. No. JKAL 1260/6B,
Supply all labour and plant, carefully dismantle and take out existing
6-3-11 No. 70.00
guardrail's post of all sizes and resite it to new position as directed by the
Supply all labour and plant, carefully dismantle and take out existing
corrugated steel beam and reinstall to position in accordance to the position
6-3-12 M 9.50
of the new post as directed by the Engineer. Include for jointing with bolts
and nuts as shown in Drg. No. JKAL 1260/6B & 6C/
Supply and fix in position " Terminal Section Type 1 " as shown in Drg.
6-3-13 No. 250.00
No. JKAL 1260/6C. Include for jointing with bolts and nuts.
6-3-14 -ditto- but " Terminal Section Type 2 " and -ditto-. No. 675.00
6-3-15 -ditto- but " Terminal Section Type 3 " and -ditto-. No. 620.00
6-3-16 -ditto- but " Buffle end section " and -ditto-. No. 250.00
SCHEDULE OF RATES NO. 7: DIVERSION OF WATER PIPES
7-1-1 Supply all labour, material and tools and carry out diversion to water
communication pipes 12mm dia., clear drainage flow, include for
cutting out pipes, threading and fixing new piping with elbows and
couplings. no. 90.00
7-1-2 -ditto- but 20mm dia. pipe and -ditto- no. 110.00
7-1-3 -ditto- but 25mm dia. pipe and -ditto- no. 150.00
ja
7-1-4 -ditto- but 32mm dia. pipe and -ditto- no. 180.00
ha
sa
7-1-5 -ditto- but 38mm dia. pipe and -ditto- no. 200.00
L
7-1-6 -ditto- but 50mm dia. pipe and -ditto- no. 250.00
BK
7-1-7 -ditto- but 57mm dia. pipe and -ditto- no. 300.00
e rD
7-1-8 Supply all labour, material, tools and carry out diversion for 20mm dia.
nd
pipe using S-bend and include for cutting out old pipe, threading and
te
fixing new pipes and all other related works. no. 180.00
n
aa
7-1-9 -ditto- but 25mm dia. pipe and -ditto- no. 220.00
n
7-1-10 -ditto- but 38mm dia. pipe and -ditto- no. 250.00
gu
ke
7-1-11 -ditto- but 50mm dia. pipe and -ditto- no. 600.00
k
tu
7-1-12 -ditto- but 100mm dia. pipe and -ditto- no. 1,500.00
un
7-1-13 -ditto- but 150mm dia. pipe and -ditto- no. 2,500.00
SCHEDULE OF RATES NO. 8: PIPE JACKING WORKS
8-1-1 a) Provide jacking pit for 900mm diameter pipe including excavation,
sheet piling temporary support, anchor block and all necessary for
jacking works and reinstate and clearing of site on completion of
works as directed by the Engineer. (Not exceeding 3m deep). no. 15,000.00
8-1-3 Supply and deliver to site Class "Z" 900mm dia. R.C. jacking pipe as
directed by the Engineer. m 520.00
ja
ha
8-1-4 To supply plant, equipment and labour for the jacking of 900mm dia.
sa
pipe class "Z", inclusive of earth excavation and removal of excavated
materials, dewatering and all necessary works as directed by the
L
Engineer. m 1,100.00
BK
8-1-5 a) -ditto- as item 8-1-1 but for 1200mm dia. pipe and -ditto- m 18,000.00
e rD
8-1-6 'ditto- as item 8-1-3 but for 1200mm dia. pipe class "Z" and -ditto- m 793.00
n
aa
8-1-7 -ditto- as item 8-1-4 but for 1200mm dia. pipe class "Z" and -ditto- m 1,400.00
n
8-1-8 -a) -ditto- as item 8-1-1 but for 1500mm dia. pipe class "Z" and -ditto-. m 18,000.00
gu
ke
8-1-9 -ditto- as item 8-1-3 but for 1500mm dia. pipe class "Z" and -ditto-. m 1,112.00
un
8-1-10 -ditto- as item 8-1-4 but for 1500mm dia. pipe class "Z" and -ditto-. m 1,700.00
8-1-11 a) -ditto- as item 8-1-4 but for 1800mm dia. pipe class "Z" and -ditto-. m 18,000.00
8-1-12 -ditto- as item 8-1-3 but for 1800mm dia. pipe class "Z" and -ditto-. m 1,716.00
8-1-13 -ditto- as item 8-1-4 but for 1800mm dia. pipe class "Z" and -ditto-. m 2,000.00
SCHEDULE OF RATES NO. 9: STEEL AND IRONWORKER
9-1-1 Rolled mild steel in roof trusses, braces, gusset plates, bearing plates,
etc. including rivetting, welding, bolting, hoisting and fixing kg. 5.50
9-1-2 Rolled mild steel in angles, joists, channels, plates, etc. including cutting,
drilling, assembling, welding, rivetting, bolting etc. kg. 6.50
ja
9-1-4 Supply and fix the following mild steel bolts complete with nuts and
ha
washers:-
sa
9-1-5 19mm - 25mm Diameter bolts kg. 7.30
L
9-1-6 13mm - 16mm -ditto-.
BK kg. 7.30
rD
9-1-10 Supply and fix 25mm diameter stainless steel for railing m 25.00
n
gu
10-1 PAINTER
10-1-1 Clean down, prime and paint one undercoat and two coats of gloss
enamel paint on metal surface generally as specified. m2 7.00
10-1-3 Clean down, prime and paint one undercoat and two coats of gloss
enamel paint on metal surface exceeding 100mm and not exceeding
200mm girth. m2 1.00
ja
10-1-4 -ditto- exceeding 200mm and not exceeding 300mm girth. m 1.50
ha
sa
10-1-5 Clean down, prime and paint two coats of emulsion paint on wall and
ceiling as specified. m2 6.00
L
10-1-6
BK
Prepare and apply two coats of flame retardant paint (up to 600
degress) on metal surfaces. m2 12.90
e rD
ja
Name not more than 1.22 meter
ha
11-2-2 - do – but double face ‘Street Name Plates’ and – do – M 750.00
Extra over item 11-2-1 above for each additional meter in length of each ‘Street
11-2-3
sa
M 150.00
Name Plates’ or part thereof.
Extra over item11-2-2 above for each additional meter in length of each ‘Street
L
11-2-4 M 300.00
Name Plates’ or part thereof.
BK
Street Name Plate using Aluminium Composite Sheet TYPE ‘B1’ (Single Post
11-3
rD
– Flag And Centre)
Manufacture, fabricate, paint & erect on site as directed 1.22 m x 0.28 m (TYPE
e
‘B1’) double face ‘Street Name Plates’ (for 1 street) as per NO. LUKISAN JKA 1539
nd
11-3-1 – NO. SYIT 3/6. Work shall include for all excavations & protection of the ‘Street No. 700.00
te
Name Plates’ from.public damage during erection with length of each ‘Street Name
Plates’ shall not be more than 1.22 meter.
n
aa
Extra over item 11-3-1 above for each additional bracket & double face ‘Street
M 350.00
11-3-2 Name Plates’
n
11-3
gu
SIGN size 2.0 meter X 1.2 meter all as per detail in JKPB Standard Drawing.The
finish sign using High Intensity Reflective Sheeting or Wide Angle Pristmatic
k
11-3-1 Reflective Sheeting applied on 4.0mm Aluminium Plate or Aluminium Composite NO 3500.00
tu
Manufacture, fabricate with all necessary bolt, nut, L-shape angle, coated
stainless steel band and install 1.22m x 3.00m ‘Street Name Plates’ without
11-5-1 No. 400.00
post to be install at existing post or as directed all as per NO. LUKISAN JKA
1539 – NO.SYIT 4/6.
Manufacture, fabricate, paint (gold colour) ‘Dome’ and fix at top of mounting
No. 140.00
11-5-2 post all as per NO. LUKISAN JKA 1539 – NO SYIT 2/6.
Manufacture, fabricate, paint (gold colour) ‘Stopper’ and fix at top of mounting
No. 50.00
11-5-3 post all as per NO. LUKISAN JKA 1539 – NO SYIT 2/6.
ja
SCHEDULE OF RATES NO. 12: SLOPE REPAIR
ha
ITEM DESCRIPTION UNIT RATE
sa
12-1 Guniting
L
Supply and lay 150mm spray concete ( Gunite) with 2 layer A8 BRC with
BK
12-1-1 Y10mm X 300mm depth dowel bar and 50mm diameter weephole at every 2 m2 300.00
interval including preparation of working platform for guniting works
rD
Supply and install cast- in- situ Grade 25 cocrete U- shape drain Type D1 top
nd
with not exceeding 600 mm and depth to invert not exceeding 300mm. Rate
12-2-1 m 300.00
inclusive excavtion, formwork, lean concrete, demaliised existing drain,
te
Supply and install cast- in- situ Grade 25 cocrete U- shape channel cascade
draindrain Type D2 top with not exceeding 900 mm and depth to invert not
n
gu
12-3-1 exceeding 750mm. Rate inclusive excavtion, formwork, lean concrete, m 500.00
demaliised existing drain, reinforcement and removal of surplus material.
ke
Refer drawing
12-4 Cascading Drain
k
tu
12-4-1 drawing. Rate include hacking- off, removal of existing drain,excavation, lean m 330.00
concrete, reinforcement, formworks and disposal of surplus material. Refer
drawing
12-5 Berm Drain
Construct reiforced concrete V - Shape berm drain typa BD 1, top width 600
12-5-1 mm and depth to invert 300 including all necessary excavtion, reiforcement, m 200.00
bedding etc.
12-6 Sump
Supply and construct 750( W) X 750mm (L) X 750mm ( D) reiforced concrete
sump( TypeA) made of Grade 25 concrete as specified in Enggineer's drawing.
12-6-1 no 2,000.00
Rate include hacking- off, removal of existing sump, excavation, lean concrete,
reinforcement, formworks and disposal of surplus material. Refer drawing.
ITEM DESCRIPTION UNIT RATE
ja
Supply, designed and install Concrete Segmental Retaining Wall all as per
ha
12-9-1 sepcification by a qualified professional Engineer. Works shall include m2 350.00
design, inspection and certification by a qualified person.
sa
Supply, designed and install Concrete Segmental Retaining Wall all as per
L
sepcification by a qualified professional Engineer. Works shall include supply
12-9-1 BK
and lay GEOGRID at every interval height, the design works, inspection and
m2 400.00
certification by a qualified person.
rD
Supply and istall 100mm thick MacWEb100 HDPE perforated geocell cellular
nd
12-10-1 contaiment system to be filled with suitable earth fii complete with u-shape m2 150.00
te
Supply all labour, machinery and material to install Precast Concrete Post
n
12-11-1 (for Spanning Wall Reinforced Concrete Panel)all per JPKB Standard m 570.00
gu
Supply all labour, machinery and material to install Spanning Wall Reinforced
12-11-2 Concrete Panel size 1.82 meter x 2.0 meter to concrete post size all as per No 875.00
k
- do - as per item 12-11-4 but for Concrete Penal size 1.82 meter x 3.0 meter -
un
12-11-3 No 1150.00
do -
12-11-4 Supply and install Capping Beam over Spanning Wall size 300mm x 600mm. m 450.00
Provide all material, machineries and labour for the hydraulic application of
Hydro Mulching on the slope surface. The process of the Hydro Mulching
12-11-5 m2 38.00
hydraulic application and all other related works will be carried out in
accordance to the standard and specification stipulated in this document.
Provide all material, machineries and labour for the installation of Turf
Reinforced Mattres on the slope surface. The installtion of the Rienforced
12-11-6 Mattress will include the assembly and positioning of the mattress with m2 58.00
anchorage hook and all other related works to be carried out in accordance to
the specification stipulated in this document.
SCHEDULE OF RATES NO. 13: SUPPLY & TRANSPORT OF MATERIALS.
13-1 SAND
Supply and transport of SAND to DBKL's store or other location as directed
13-1-1 m. ton 55.00
by the Engineer.
13-2 AGGREGATE
Supply and transport of AGGREGATE to DBKL's store or other location as
13-2-1 m. ton 47.00
directed. (14mm or 20mm nominal size)
13-3 CEMENT
Supply and transport of CEMENT with 50kg/bag to DBKL's store or other
13-3-1 50Kg/Bag 30.00
location as directed by the Engineer.
13-4 QUARRY DUST
Supply approved QUARRY DUST to DBKL store or other location as directed by
ja
13-4-1 m. ton 18.00
the Engineer
ha
13-5 STEEL PLATE
sa
Supply and transport of 1200 x 2400 x 25mm thick steel plate to DBKL's
13-5-1 no. 800.00
store or as directed by the Engineer.
L
13-6 STEEL BARS
13-6-1
BK
Supply and transport of HIGH YIELD steel bars of diameter 6-16mm. To
kg. 3.80
Dewan Bandaraya Kuala Lumpur's store or as directed.
rD
13-7 PLYWOOD
e
13-8 CONE
n
Supply and transport to DBKL's store or as directed Plastic Cone Flat Mat -
aa
13-8-1 Base Weight Rubber, size 440mm x 440mm x 700 high, Colour red no. 85.00
fluorescent and white reflective sleeve
n
gu
ja
ha
14-1-12 Charge Hand Day 65.00
14-1-13 Plant Operator Day 65.00
sa
14-1-14 Fitter Day 65.00
L
14-1-15 Pneumatic Tool Operator Day 65.00
14-1-16 Lorry Driver
BK Day 65.00
rD
14-1-17 Blasting Operator Day 65.00
14-1-18 Blasting Labour Day 55.00
e
nd
ja
14-2-25 Concrete/Asphalt cutter - 250 kg Hour 20.00
ha
14-2-26 Lorries (ordinary) - 8 tonne Hour 80.00
sa
14-2-27 Water truck mobile type (including spraying equipment) - 1,000 gals Hour 100.00
L
14-2-28 Pile driving machine - 1 pile Hour 110.00
14-2-29 Concrete batching plant - 100 Cu. m
BK Hour 250.00
rD
Pumps -portable (incl. foot valves, suction hose up to 60 ft. of delivery hose and all
14-2-31 Hour 20.00
nd
14-2-33 Compressors - portable (incl. tools and hose) - 50 c.f.m. Hour 50.00
aa
14-2-34 dittto - mobile (incl. tools & hose) - 100 c.f.m. Hour 100.00
n
14-2-35 Welding and cutting set ( Oxyacetylene incl. of oxygen and acetylene) - each Hour 20.00
gu
14-2-36 dittto - Electric arc (any item not include above)- each Hour 20.00
ke
k
tu
un
SCHEDULE OF RATES NO. 15 : PAVEMENT ENGINEERING - FIELDS TESTING
ITEM DESCRIPTION OF WORKS UNIT RATE (RM)
15-1-3 Road Profiler and Roughness Measurement using Walking Profiler lane-km 3,500.00
15-1-4 Surface Irregularity Test using Rolling Straight Edge 300m Section 350.00
ja
15-1-5 Tranverse Irregularity Test using Rolling Straight Edge no. 32.00
ha
15-1-6 Skid Resistance Test using Pendulum Tester no. 35.00
sa
Trial Pit - Excavate trial pit of size 1m x 1m, up to subgrade level and
L
15-1-7 no. 1,385.00
carry out logging and mapping side wall and backfilling
BK
15-1-8 Field Density Test (FDT)
e rD
(i) Sand replacement method (small pouring cylinder method) no. 375.00
nd
(ii) Sand replacement method (large pouring cylinder method) no. 435.00
te
n
ja
15-2-10 Polished-stone Value no. 1,752.00
ha
15-2-11 Aggregate Stripping Test no. 96.00
sa
15-2-12 Soundness of Aggregate no. 160.80
15-2-13 Los Angeles Abrasion Value no. 75.60
L
15-2-14 Silt / Clay Content BK no. 68.40
15-2-15 Sulphate Content no. 144.00
rD
ja
15-3-33 Ductility on Residue no. 120.00
ha
15-3-34 Prepare Binder Modification no. 216.00
sa
-
L
-
15-4 PREMIX TEST
BK
15-4-1 Marshall Test:- -
rD
-
te
-
15-4-2 Determination of Binder Content no. 135.60
k
tu
ja
(i) Hot In Place Recycling (HIPR) no. 2,500.00
ha
(ii) Cold In Place Recycling with Cement (CIRP + C) no. 1,500.00
sa
(iii) Cold In Place Recycling with Emulsion (CIRP + E) no. 2,000.00
L
(iv) Cold In Place Recycling with Lime (CIRP + L) BK no. 1,500.00
(v)Foam Bitumen Recycling (FOAM) no. 4,000.00
e rD
nd
ja
15-6-4 Extraction of Asphalt Core (4'' dia) no. 132.00
ha
sa
15-6-5 Extraction of Asphalt Core (6'' dia) no. 150.00
L
15-6-6 BK
Dynamic cone Penetrometer (DCP)Test (up to subgrade level or Max 132.00
rD
1.2m depth)
e
nd
treatment data after data being collected by the follwing a, b, c & d data
un
collector test.
lane-km 1,600.00
a. MULTI LASER PROFILER SURVEY,
b. FALLING WEIGHT DEFLECTOMETER
c. ASPHALT CORING
d. DYNAMIC CONE PENETROMETER TEST
NOTE : The contractor are allowed to utilise upon approval and
supervision by DBKL personal SPAJa Road Asset Management
System install in DBKL network and server.