Sei sulla pagina 1di 4

CHECK LIST FOR BTS SITES 1 (4)

SITE ENGINEERING

TELECOM IMPLEMENTATION INSPECTION REPORT

SITE ID: SDG23459 SITE NAME: Panipat_Airtel Date Of Visit: 12/02/2018

SITE ADDRESS: C154 near jat dharmshala panipat Document number: .........................

Guard Name and contact No

Date of submission of Report: 13/02/2018

Notation: Correctly installed / Acceptable Notꭓcorrect

S.N Infrastructure Check point


o.

1 Radio Site GBT √ RTT POLE

2 ID/OD/POLE/WA INDOOR √ OUTDOOR WALL POLE


LL

3 Shelter Buildg. Height (Mtrs/floor) ꭓ ꭓ


Equipment Room Floor

Chain Pulley required ꭓ ꭓꭓꭓ

4 Space For Space available for BTS ꭓ ꭓ


Space Available for TRSM Rack
Equipments
(Sharing sites)
√ √ ꭓ
5 Floor Levelled Antistatic Mat Antistatic
grounding

6 Door Sealing ꭓ Locking ꭓ

7 ID LADDER ID LADDER INSTALLED ꭓ SPACE ON EXISTING LADDER

8 Lighting No. of fittings  2 √ ꭓ


Operational ꭓ P
Sockets operational

9 Earthing system No of Pits with Chamber prepared √ Earthpits are interconnected


DG,DG-N,Tower,Shelter are conneted to EP

Earthing Values – EP1 .8 Ohms EP2 .6 Ohms EP3 .7


Ohms

10 Earthing Bus EGB under feeder entry √ ꭓ


Connected to Body Earthpit
Bars
IGB under feeder entry
√ ꭓ
Connected to Eqpt Earthpit

EMP BUS BAR √


11 PIU/ACDB PIU/ACDB Installed ꭓ POWER TERMINATION AT PIU/ACDB ꭓ
CHECK LIST FOR BTS SITES 2 (4)

SITE ENGINEERING

PIU/ACDB commissionedꭓ

12 Mains Incomer Mains available ꭓ ꭓ


Energy Meter Installed

13 DC Power DC Power Available ꭓ MCB available for BTS& TRSM



Availability

14 DG DG installed √ DG Commissionedꭓ

15 Air-conditioning Installed √ Sealing around AC unitsꭓ ꭓ


AC’s are comm.

16 WFT Size of opening made for WFT 7/8’’ No of Openings made


13
ꭓ 3
Openings are properly sealed

17 Tower GBT √ RTT Tower Height 72m

No of Platforms & height 7, 10m each √


Tower Painting

18 Type Tower Type √

19 Cable ladder Vertical Cable tray installed√ √


Horizontal Cable tray installed
(OD)

Space available on Vertical/Horizontal tray

20 Cable Ladder Length of Vertcal ladder(above HCT till antenna mount)


69m in
lengths mtrs.

Length of HCT ladder 8m in mtrs.

21 Lightening Lightening Rod LA connected to Earthpit



Protection √

22 Aviation Light Installation COMMISSIONED ꭓ



CHECK LIST FOR BTS SITES 3 (4)

SITE ENGINEERING

23 Cable Inlet For Power & Signal Cables √

24 Antenna Mount GSM antenna mount Installed√ Antenna Mount for MW at near√end

Antenna Mount for MW at Far End√

62 68 72
25 GSM antenna Height of GSM antennas m m m
Mount hts.(as
per TND)

26 GSM antenna Height of GSM antennas 45 55 65


Mount hts. m m m
(existing)

65
27 MW Antenna Height of MW antennas 72
m m
Mount ht.
near end Far End
(as per TND)
60 65
28 MW Antenna Height of MW antennas
m m
Mount ht.
(Existing) near end Far End

29 GSM antenna 48° 58° 65°


Azimuth(As per
TND)

30 GSM antenna 35° 50° 60°


Azimuth
(existing)

31 MW Antenna 28° 28°


Azimuth(As per
TND) near end Far End
20° 28°
32 MW Antenna
Azimuth
(Existing) near end Far End
CHECK LIST FOR BTS SITES 4 (4)

SITE ENGINEERING

Problems / Comments (Refer to applicable activity Sl. No.)


1. Shelter layout with tower attached as Annexure 1
_________________________________________________________________________________
2. Punch point attached as Annexure 2
_________________________________________________________________________________
3. Photographs attached as Annexure 3
_________________________________________________________________________________

_________________________________________________________________________________

Site Engineer Name & Signature:

Name: Shripal Singh

Pls sketch whole Site Plan along with shelter/cage plan (including HCT routing)