Sei sulla pagina 1di 1

Final As built BoQ - AUH3908, O_Bawabat_Residential

Site No.: AUH3908 Date 18-Mar-18


Site Name: O_Bawabat_Residential Completion Date 10-Dec-17
Site Type: GF
BoQ Type: Final As built BoQ

`
Final As-Built
SN Normal Site Babtain 153H Unit Remarks
Quantities
Supply & installation of 4x25 sq. mm Cu/XLPE/SWA/PVC power cables,
1.0 E 112 meter 44.00
inclusive of clamps, ties, lugs & termination
Excavation, backfilling of trenches for laying power supply cables of all
sizes 600 mm wide x 600mm deep in all kinds of soils, including supply
2.0 E 143 Meter 39.00
of cable protection tiles, cable warning tape, cable markers as per
electricity company rules.
Removal of interlock tiles. Relaying the interlock tiles after underground
3.0 C 102 SQM 38.00
work is completed.

ABLEM Representative: ETISALAT Projects:


Name : Name:

Designation: Designation:

Signature: Signature:

Date: Date: