A) SE TIENE LOS SIGUIENTES DATOS

a) Datos Generales
- Procesos : COSTOS UNITARIOS
- Contrato de Obra : N° XXXXX -2016-MTC/XX
- Obra : XXXXXXXXXXXXXXXXXX
- Contratista : XXXXXXXXXXXXXXXXXX
- Monto del Valor Referencial S/300,000.00
- Monto del Contrato con I.G.V. : S/270,000.00
- Monto del Contrato sin I.G.V. : S/228,813.56
- Factor de relacion: 0.90
- Fecha del Valor REFERENCIAL : Oct-16
- Area Geografica : 02
- Plazo de Ejecucion :

INDICES UNIFICADOS (I.U.)

Simb. I.U. Oct. 2016 Nov. 2016 Dic. 2016 Ene. 2017 Feb. 2017 Mar. 2017
J 47 258.94 258.94 258.94 258.94 258.94 258.94
F 3 195.39 198.14 198.13 187.08 195.33 194.41
B 17 290.2 267.01 285.96 285.9 283.9 275.1
C 21 317.16 382.05 483.79 667.44 807.6 1138.23
M 43 314.33 314.95 320.14 320.88 321.15 322.08
E 48 281.97 285.38 289.69 298.92 313.56 312.43
T 72 234.57 236.82 238.25 234.43 240.93 238.03
G 39 261.61 261.69 263.31 263.65 264.18 265.79

* CONOCIDA LA FORMULA POLINOMICA SE OBTIENE

0.151 𝐹_𝑟/𝐹_0 +0.074 𝐿_𝑟/𝐿_0 +0.061 𝐶_𝑟/𝐶_0 +0.088 𝑀_𝑟/𝑀_0 +0.056 𝐸_𝑟/𝐸_0 +0.057 𝑇_𝑟/𝑇_0 +0.226 〖���〗 _𝑟/ 〖���〗 _0

- AVANCES EN (S/.) INCLUIDOS EL FACTOR DE RELACION

PROGRAMADO EJECUTADO

VAL. N° FECHA PARCIAL ACUMLAD. VAL. N° FECHA PARCIAL ACUMLAD.


1 Dec-16 27,000.00 27,000.00 1 Dec-16 34,000.00 34,000.00

2 Jan-17 36,000.00 63,000.00 2 Jan-17 59,000.00 93,000.00

3 Feb-17 71,000.00 134,000.00 3 Feb-17 65,000.00 158,000.00

4 Mar-17 63,000.00 197,000.00 4 Mar-17 66,000.00 224,000.00

5 Apr-17 38,000.00 235,000.00 5 Apr-17 11,000.00 235,000.00

235000.00 235,000.00

b) Primer Adelanto de Materiales


b.1) Datos
- material solicitado : cemento portland tipo I (I.U. 21)
- Formula polinomica: estructura
- Monto Solicitado: S/. 10,000.00
- Fecha de pago: 22 de Diciembre 2016
- Precio de bolsa de cemento al mes de Octubre 2016 (fecha V.R.): S/. 15.00
(se considera precio pequeño por razones didacticas)

c) Segundo Adelanto Para Materiales (mismo material, misma formula polinomica)


c.1) Datos
- material solicitado : cemento portland tipo I (I.U. 21)
- Monto Solicitado: S/. 10,000.00
- Fecha de pago: 22 de Diciembre 2016
- Monto Maximo a otorgar: (M.M.)
MM =( Coeficiente de Incidencia x Saldo Bruto por Valorizar - saldo por amortizar del adelanto anterior por el mismo material) x Ima / Imo

SOLUCIÓN

METRADO DE MATERIALES (CEMENTO)

VAL. 01 VAL. 02 VAL. 03 VAL. 04


DESCRIPCION
(bls.) (bls.) (bls.) (bls.)

Cemento Portland tipo I 200 200 150 300

Precio Unitario Cemento (S/.) 15.00

ADELANTO PARA MATERIALES O INSUMOS PARA LA PRIMERA VALORIZACION (DICIEMBRE - 2016)

Imo MONT. MONTO


SAL. B. POR Coef. De FACTOR DE Ima MONTO A
SIMBOLO

I.U OCT.-
VAL. (sin incid. RELACION 2016 NOV.-2016 MAX. SOLICIT. OTORGAR
ELEMENTO I.G.V.)
F 3 ACERO DE CONSTRUCCION CORRUGADO 228,813.56 0.1510 0.90 195.39 198.14 31,533.42 0.00 0.00
B 17 BLOQUE Y LADRILLO 228,813.56 0.0740 0.90 290.20 267.01 14,021.23 0.00 0.00
C 21 CEMENTO PORTLAND TIPO I 228,813.56 0.0610 0.90 317.16 382.05 15,131.98 10,000.00 10,000.00
T 72 TUBERIA DE PVC PARA AGUA 228,813.56 0.0570 0.90 234.57 236.82 11,850.73 0.00 0.00
10,000.00
AMORTIZACION POR ADELANTO DE MATERIALES DEL MES DE DICIEMBRE - 2016

Imo
ADEL.MAT. MET. MAT. P. UNIT. FACTOR DE Ima AMORT.
SIMBOLO

I.U OCT.-
DIC.-2016 UTILZADO MATERIAL REALCION NOV.-2017 ADEL.MAT.
ELEMENTO 2016

F 3 ACERO DE CONSTRUCCION CORRUGADO 0.00 0.00 0.00 0.90 198.14 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.00 0.00 0.00 0.90 267.01 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 10,000.00 200.00 15.00 0.90 382.05 317.16 3,252.41
T 72 TUBERIA DE PVC PARA AGUA 0.00 0.00 0.00 0.90 236.82 234.57 0.00
3,252.41
CALCULO DE DEDUCTIVOS POR MATERIALES MES DE DICIEMBRE DEL 2016

Coef. De VALORIZACI Imr DIC.- Ima Imo MONTO


SIMBOLO

I.U
incid. ON 2016 DIC.-2016 OCT.-2016 DEDUCTIV.
ELEMENTO
F 3 ACERO DE CONSTRUCCION CORRUGADO 0.1510 34,000.00 0.00 0.00 0.00 0.00
B 17 BLOQUE Y LADRILLO 0.0740 34,000.00 0.00 0.00 0.00 0.00
C 21 CEMENTO PORTLAND TIPO I 0.0610 34,000.00 317.16 317.16 317.16 0.00
T 72 TUBERIA DE PVC PARA AGUA 0.0570 34,000.00 0.00 0.00 0.00 0.00
0.00

ADELANTO PARA MATERIALES O INSUMOS PARA LA SEGUNDA VALORIZACION (ENERO - 2017)

MONT.
SAL. B. POR Coef. De FACTOR DE Imo OCT.- Ima MONTO MONTO A
SIMBOLO

SALD.AMORT.
I.U VAL. (sin MAX.
incid. RELACION 2016 ENE.-2016 MES ANT. SOLICIT. OTORGAR
ELEMENTO I.G.V.) SOLICIT.
F 3 ACERO DE CONSTRUCCION CORRUGADO 228,813.56 0.1510 0.90 195.39 187.08 0.00 29,773.25 0.00 0.00
B 17 BLOQUE Y LADRILLO 228,813.56 0.0740 0.90 290.20 285.90 0.00 15,013.18 0.00 0.00
C 21 CEMENTO PORTLAND TIPO I 228,813.56 0.0610 0.90 317.16 667.44 6,747.59 12,235.72 10,000.00 10,000.00
T 72 TUBERIA DE PVC PARA AGUA 228,813.56 0.0570 0.90 234.57 234.43 0.00 11,731.13 0.00 0.00

AMORTIZACION POR ADELANTO DE MATERIALES DEL MES DE ENERO - 2017

Imo
ADEL.MAT. MET. MAT. P. UNIT. FACTOR DE Ima AMORT.
SIMBOLO

I.U OCT.-
ENE.-2017 UTILZADO MATERIAL REALCION DIC.-2017 ADEL.MAT.
ELEMENTO 2016

F 3 ACERO DE CONSTRUCCION CORRUGADO 0.00 0.00 0.00 0.90 198.13 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.00 0.00 0.00 0.90 285.96 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 16,747.59 200.00 15.00 0.90 483.79 317.16 4,118.53
T 72 TUBERIA DE PVC PARA AGUA 0.00 0.00 0.00 0.90 238.25 234.57 0.00
4,118.53

CALCULO DE DEDUCTIVOS POR MATERIALES DEL MES DE ENERO

Coef. De VALORIZACI Imr Ima Imo MONTO


SIMBOLO

I.U
incid. ON ENE.-2017 ENE.-2016 OCT.-2016 DEDUCTIV.
ELEMENTO
F 3 ACERO DE CONSTRUCCION CORRUGADO 0.1510 59,000.00 187.08 187.08 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.0740 59,000.00 285.90 285.90 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 0.0610 59,000.00 667.44 667.44 317.16 0.00
T 72 TUBERIA DE PVC PARA AGUA 0.0570 59,000.00 234.43 234.43 234.57 0.00
0.00

AMORTIZACION POR ADELANTO DE MATERIALES DEL MES DE FEBRERO - 2017 (VALORIZACION 3)

Imo
ADEL.MAT. MET. MAT. P. UNIT. FACTOR DE Ima AMORT.
SIMBOLO

I.U OCT.- saldo


ENE.-2017 UTILZADO MATERIAL REALCION ENE.-2017 ADEL.MAT.
ELEMENTO 2016

F 3 ACERO DE CONSTRUCCION CORRUGADO 0.00 0.00 0.00 0.90 187.08 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.00 0.00 0.00 0.90 285.90 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 12,629.06 150.00 15.00 0.90 667.44 317.16 4,261.46
T 72 TUBERIA DE PVC PARA AGUA 0.00 0.00 0.00 0.90 234.43 234.57 0.00
4,261.46
CALCULO DE DEDUCTIVOS POR MATERIALES DEL MES DE FEBRERO

Coef. De VALORIZACI Imr FEB.- Ima Imo MONTO


SIMBOLO

I.U incid. ON 2017 ENE.-2016 OCT.-2016 DEDUCTIV.


ELEMENTO
F 3 ACERO DE CONSTRUCCION CORRUGADO 0.1510 65,000.00 195.33 187.08 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.0740 65,000.00 283.90 285.90 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 0.0610 65,000.00 807.60 667.44 317.16 1752.22
T 72 TUBERIA DE PVC PARA AGUA 0.0570 65,000.00 240.93 234.43 314.33 0.00
0.00

AMORTIZACION POR ADELANTO DE MATERIALES DEL MES DE MARZO - 2017 (VALORIZACION 4)

Imo
ADEL.MAT. MET. MAT. P. UNIT. FACTOR DE Ima AMORT.
SIMBOLO

I.U OCT.-
ENE.-2017 UTILZADO MATERIAL REALCION FEB.-2017 ADEL.MAT.
ELEMENTO 2016

F 3 ACERO DE CONSTRUCCION CORRUGADO 0.00 0.00 0.00 0.90 195.33 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.00 0.00 0.00 0.90 283.90 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 8,367.59 300.00 15.00 0.90 807.60 317.16 10,312.71
T 72 TUBERIA DE PVC PARA AGUA 0.00 0.00 0.00 0.90 240.93 234.57 0.00
10,312.71

CALCULO DE DEDUCTIVOS POR MATERIALES DEL MES DE MARZO

Coef. De VALORIZACI Imr FEB.- Ima Imo MONTO


SIMBOLO

I.U incid. ON 2017 ENE.-2016 OCT.-2016 DEDUCTIV.


ELEMENTO
F 3 ACERO DE CONSTRUCCION CORRUGADO 0.1510 66,000.00 195.33 187.08 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.0740 66,000.00 283.90 285.90 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 0.0610 66,000.00 807.60 667.44 317.16 1779.18
T 72 TUBERIA DE PVC PARA AGUA 0.0570 66,000.00 240.93 234.43 234.57 0.00
0.00

* CALCULO DE LOS MONTOS A PAGAR AL CONTRATISTA

VAL. 1 (DIC.-2016) VAL. 2 (ENE.-2017) VAL. 3 (FEB.-2017) VAL. 4 (MAR.-2017) VAL. 5 (ABR.-2017)

SUB TOTAL CON FACTOR DE


REFERENCIA 34,000.00 59,000.00 65,000.00 66,000.00 11,000.00

DEDUCTIVO 0.00 0.00 0.00 0.00 0.00


VALOR. BRUTA 34,000.00 59,000.00 65,000.00 66,000.00 11,000.00
AMORTIZACION 3,252.41 4,118.53 4,261.46 10,312.71 0.00
VALOR NETO 30,747.59 54,881.47 60,738.54 55,687.29 11,000.00
I.G.V. (18%) 5,534.57 9,878.66 10,932.94 10,023.71 1,980.00
MOTO A PAGAR 36,282.15 64,760.13 71,671.47 65,711.00 12,980.00

* LA VALORIZACION 05 NO TIENE DEDUCTIVOS NI AMORTIZACIONES.


�〗 _0
MONTO
ACUMLAD.

0.00
0.00
16,747.59
0.00
16,747.59