EcoSys Case Studies

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 1
Shaw Group

Overview:
• $7B Fortune 500 Company
• 28,000 Employees
• ENR #1 Design Firm in Power, Fossil Fuel, Nuclear Plants

Challenges:
• Standardize Project Controls across global Fossil and Nuclear Divisions
• Multicurrency
• Need to be able to Recast Internal Reports in Customer’s Formats
• Continue to Support Different Cost Codes used by different Divisions
• Integrate Project Schedules with Cost Management

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 2
Shaw Group

Solution – EcoSys as Standard Project Controls Platform


• Integrated Processes including:
• Budgeting
• Revenue and Cost Forecasting
• Commitments Tracking
• Earned Value
• Multicurrency
• Support Standard Reporting across Organizations but allow for distinct codes and
processes within divisions
• Maintain Mappings between Internal Cost Codes and Customer Codes
• Full internal and external reporting platform
• Automated integration with Oracle Primavera P6 Scheduling Software

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 3
FAA TAMR Program

Overview:
• Terminal Automation Modernization and Replacement (TAMR) Program
• Air Traffic Control – Terminal (ATO-T) Organization
• Modernize Air Traffic Control Systems at Nation’s Major Airports
• High Visibility Capital Program

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 4
FAA TAMR Program

Capital Program Management Innovations:


• Standardize Contractor Submissions with Oracle Primavera P6 Templates
• EVM Reporting performed based upon FAA’s structures
• Resource loaded schedules drive budgets, forecasts and EVM in EcoSys
• EcoSys Database Consolidates Funding Allocations, Budgets, Estimates, Forecasts,
Obligations, Commitments, Expenditures, Performance/EVM
• ATO-T Maintains Vendors and Own Cost and Schedule Forecasts as Separate Versions
• G/L Actuals Are Reconciled against Vendor Submissions
• System Enforces Funding Rules

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 5
FAA TAMR Program
Funding

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 6
FAA TAMR Program
Basis of Estimate

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 7
FAA TAMR Program
Earned Value

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 8
FAA TAMR Program
Earned Value

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 9
Amtrak

Overview:
• Amtrak Engineering
• Responsibility for Planning and Execution of Capital Program

Capital Program Management Innovations:


• Integrated Process and System – Capital Planning, Estimating, Budgeting, Scheduling,
Cost Management, EVM
• Timberline Estimates become Oracle Primavera P6 Schedule
• P6 Schedules become basis for 5 Year Plan in EcoSys
• Funds Management integrated with Schedules

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 10
Amtrak
Integrated Capital Planning and Project Management Processes

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 11
Amtrak
Visibility to External and Internal Stakeholders

Amtrak
Funding

Other
People’s
Money

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 12
State DOT

Overview:
• “Live STIP”
• Integrating Program Controls and Capital Planning Systems and Processes

Capital Program Management Innovations:


• Statewide Transportation Improvement Plan (STIP) moved from Excel to database
environment integrated with Oracle Primavera Schedules, General Ledger System
• Single Database Reports on All State Long Range Plans
• Planning Database provides full visibility into performance

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 13
State DOT
5 Year Transportation Improvement Plan driven by Program Controls Data

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 14
State DOT
Visibility by Any Project Attribute

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 15
State DOT
Integration of Schedule and Financial Data

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 16
State DOT
Comparisons of Original Plans, Amendments

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 17
Los Angeles Department
of Water and Power

Overview:
• Capital Improvement Program within Water Engineering and Technical Services (WETS)
• Capital Improvement Program Management System (CIPMS) manages 10-Year Water
System Program consisting of 110+ Projects
• Responsible for Budgeting, Forecasting, Performance/EVM, Scheduling, Resource
Management
• Previously managed in P3, Excel, Mainframe

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 18
Los Angeles Department
of Water and Power

Capital Program Management Innovations:


• Fully integrated Project and Financial Management Solution, incorporating Oracle
Primavera P6, EcoSys, Mainframe Financial System
• Standardization of processes across Water Department with Standard Templates for
Scheduling, Budgeting, Forecasting, Reporting

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 19
Los Angeles Department
of Water and Power
Schedules Drive Cost Forecast, Reconcile with Mainframe Budgets

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 20
Los Angeles Department
of Water and Power
Integration of Scheduling and Finance

Map with Project


Management and
Financial Structures

Copyright 2010 EcoSys All Rights Reserved. Confidential and Proprietary Information. 21