Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Summary (Mehmet)
● Experimentation on Aliens is a promising field many companies do not utilize and take
advantage of for the benefit of mankind. Our objective is to create a report which will
show the current progress of building a research/experimentation facility on Planet LV-
246 (Acheron) and how Alien (Xenomorph) experimentation will affect the future of
human race.
○ We have narrowed down the focus of our report to reflect the progress made in
building the research/experimentation facility to the board of directors/trustees
and CEO of Weyland Corporation. We believe this type of focus will enhance the
readability and clarity of our report by preventing the inclusion of unnecessary
details that would distract our esteemed managers from their duties. The format
of the report is established so that the high-ranking managers, directors and CEO
of Weyland Corporation can easily find information that interests them out of the
various topics.
● Tasks completed
● Tasks remaining
● Cost
● Conclusion
● Recommendations
We have taken the precautionary measures of bombarding the surface of the planet in order
to establish secure parameters for the construction of the research/experimentation facility.
During the bombardment phase, thirty-two AH-64 uranium grade ballistic missiles/rockets
were used to annihilate any Xenomorph colonies established on and underground the
surface.
One hundred and thirteen military personnel helped in securing the bombarded perimeters
for construction of research/experimentation facility. The amount of ammunition used to
establish secure perimeters can be seen below.
Total of All Ammunition Used in Establishing and Securing Perimeters on LV - 246 (Acheron)
Approximately 200,000 cubic yards of concrete has been placed throughout the
research/experimentation facility, with up to 1500 cubic yards being poured on some days.
Depending on the concrete application, concrete strengths vary (some with compressive
strengths up to 6000 psi). Majority of the concrete was mixed at a batch production facility
established in the orbital station.
Approximately 67,000 tons of Vibranium metal were imported from Wakanda on Earth to be
used inside the laboratories. They have been finely crafted by interior architects for their
specific use for experimentation purposes. They constitute the strongest type of metal found
on Earth which can withstand the corrosive/acidic blood of Xenomorphs.
1. Secured Parameters
a. Destination determined
- A location on LV-246 was agreed upon, based upon its favorability to
satellite connection and favorable weather conditions.
b. Bombarded
- The location was then bombarded by rockets to both equalize the terrain
and destroy any pockets of Xenomorphs.
c. Invaded
- A military company of about 113 personnel were dispatched to dispose of
any hostiles in the designated region and to then patrol the building site
once construction begun.
d. Built defense station
- Fort built to house personnel and weapons. Temporary
dining/medical/waste facilities were set up.
2. Labs Built
a. Foundation built
- Foundation was dug out, paved, and reinforced.
b. Utilities installed
- Underground pipes and electrical wiring were installed followed by
ventilation and climate control systems.
c. Frame and building
- Research/experimentation structure was created and built.
d. Security and Equipment installed
- Cameras, computers, and alarm systems installed and tested.
e. Containment facilities built
- Sections designated to house Xenomorph specimens were equipped with
machinery to aid in transport. Rooms were reinforced and made from
materials resistant to the Xenomorphs’ acidic blood.
f. Research Labs securely built
- Rooms were installed with idea of keeping all specimens contained.
Ventilation system is composed of small pipes and study equipment was
set up.
Conclusion (Glenn)
In conclusion, the process of setting a foundation for the research facility has been set and the
facility is currently being built. The remaining portion for the projects contain finishing the facility
and collecting Xenomorphs for experimentation of drug enhancements and environmental
testing. The project is expected to be finished by the set deadline: March 10, 2159. Our budget
remains sufficient to cover the expense for the projects and will allow for further testing if
needed.
Recommendations (Glenn)
With the recent procurement, we have decided that the extraction of eggs from Xenomorphs
can be a hazardous procedure. We have been able to collect multiple samples, but we are
awaiting the approval of an experiment such as artificial breeding to allow for constant supply of
eggs along with a test of different traits. This experiment can be easily added into the plan and
will allow for safer harvesting of eggs for our crew. The experiment can allow for studying of
different species and how to detect the mating behavior of Xenomorphs.