Sei sulla pagina 1di 21

LIFTING STEERING COMMI

Package
Free fall Isolated
No Mobilization to Site
Yes No
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
1 Crane Operator NOR AZAM BIN SALIM
Crane SWL 55t
Crane Type Mobile Crane
Crane PMA Number SL PMA 50911 (12/06/2018) N/A
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
2 Crane Operator MUHAMMAD NIZAM BIN ABU TALIB
Crane SWL 170t
Crane Type All Terrain Crane
Crane PMA Number PK PMA 7213 (Pending DOSH issuance) N/A
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
3 Crane Operator PLEMON BUJANG ANAK UNAU
Crane SWL 70t
Crane Type Rough Terrain Crane
Crane PMA Number SL PMA 49625 (Pending DOSH issuance) N/A
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
4 Crane Operator MOHD HAIRUL BIN MASTOR
Crane SWL 70t
Crane Type Rough Terrain Crane
Crane PMA Number SL PMA 50908 (09/06/2018) N/A
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
5 Crane Operator SHADAN BIN SAADON
Crane SWL 55t
Crane Type Rough Terrain Crane
Crane PMA Number SL PMA 54039 (22/01/2019) N/A
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
6 Crane Operator SHADAN BIN SAADON
Crane SWL 50t

YES
6

Crane Type Rough Terrain Crane


Crane PMA Number SL PMA 52358 (08/09/2018) YES
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
7 Crane Operator MOHD HUSAINI AMIR BIN HURAN BREAKDOWN. CRANE AT WORKSH
Crane SWL 50t
Crane Type Rough Terrain Crane
Crane PMA Number SL PMA 48981 (27/02/2019)
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
8 Crane Operator TRISUHARONON BIN SUPARNO
Crane SWL 50t
Crane Type Rough Terrain Crane
Crane PMA Number SL PMA 52495 (15/09/2018) NO
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
9 Crane Operator MUHAMAD FAKHRUL AZIM BIN MHD BAKR
Crane SWL 50t
Crane Type Rough Terrain Crane
Crane PMA Number SL PMA 47477 (21/11/2018) NO
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
10 Crane Operator MOHAMAD FAAMI BIN MOHD IMAM
Crane SWL 50t
Crane Type Rough Terrain Crane
Crane PMA Number SL PMA 47842 (26/12/2018) NO
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
11 Crane Operator MOHD HAIRUDIN BIN SEIAKI
Crane SWL 25t
Crane Type Rough Terrain Crane
Crane PMA Number SL PMA 48327 (03/03/2019) YES
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
12 Crane Operator LOUIS EDDYSON A/L R MOSES
Crane SWL 600t
Crane Type Crawler Crane
Crane PMA Number JH PMA 8738 (04/10/2018) N/A
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
13 Crane Operator MECK ANAK GERA

N/A
13
Crane SWL 250t
Crane Type Crawler Crane
Crane PMA Number JH PMA 18036 (28/04/2019) N/A
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
14 Crane Operator YAZID BIN ABDULLAH
Crane SWL 250T
Crane Type Crawler Crane
Crane PMA Number JH PMA 80982 (27/02/2019) YES
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
15 Crane Operator MOHAMAD FAISAL BIN JAMIL
Crane SWL 150T
Crane Type Crawler Crane
Crane PMA Number JH PMA 16954 (31/10/2018) YES
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
16 Crane Operator AHMAD FHATIHI BIN MOHD KANAPIAH
Crane SWL 120T
Crane Type Crawler Crane
Crane PMA Number SL PMA 48937 (04/06/2019) N/A
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
17 Crane Operator MUHAMMAD ZAHIR ZAIDEEN BIN MOHD Z
Crane SWL 90T
Crane Type Crawler Crane
Crane PMA Number JH PMA 14264 (23/10/2018) N/A
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
18 Crane Operator KENNTH ANAK UTAI
Crane SWL 55T
Crane Type Crawler Crane
Crane PMA Number JH PMA 13500 (08/01/2019) N/A
Mobilization Date
Inspected By(EPCC) CP6 inspector
Verify By(UPT)
19 Crane Operator NORAZIZI BIN MOHD NOR
Crane SWL 55T
Crane Type Crawler Crane
Crane PMA Number SL PMA 51829 (05/10/2018) N/A
Mobilization Date 12/2/2017
Inspected By(EPCC) SINNA (ELECO)
Verify By(UPT)
20

N/A
20 Crane Operator MOHD FAIZ BIN JAAFAR
Crane SWL 30T
Crane Type Mobile Crane
Crane PMA Number PMA 49753 (28/04/2019) N/A
Mobilization Date
Inspected By(EPCC) SINNA (ELECO)
Verify By(UPT)
21 Crane Operator PAUZI BIN JIBELI
Crane SWL 2.9T
Crane Type TOWER CRANE
Crane PMA Number PMA 67100 N/A
COMMITTEE MASTER ACTION
Xmas Trees Picture
Yes No Free Fall System Free Fall System Xmas Trees

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES
Before After Isolated / Locked the Before
Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


DOWN. CRANE AT WORKSHOP Isolated / Locked the System System Installation

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES
Before After Isolated / Locked the Before
Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

YES
Before After Isolated / Locked the Before
Isolated / Locked the System System Installation

YES

Before After Isolated / Locked the Before


Isolated / Locked the System System Installation

N/A
Xmas Trees Xmas Trees

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation
After
Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation
After
Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation

Before After
Installation Installation
After
Installation

Before After
Installation Installation
LIFTING SPECIALIST

REFINERY & CRACKER


No Package Lifitng Specialist (UPT) Lifitng Specialist (EPCC)
Package 1
1 Name Name
CCSM
Package 2
2 Name Name
SEG
Package 3
3 Name Name
TR
Package 4
4 Name Name
Petrofac
Package 22
5 Name Name
PL
Package 5
6 Name Name
TOYO

PETCHEM
No Package Lifitng Specialist (UPT) Lifitng Specialist (EPCC)
Package 6A
1 Name Name
Samsung
Package 7
2 Name Name
Tecnimont
Package 11
3 Name Name
Samsung
Package 12A
4 Name Name
SEG
Package 27
5 Name Name
Tecnimont
Package 29
6 Name KISHAN SINGH Name
Flour MUHAMMED ASHRAF
Package 30
7 Name Name
TBA

IU&I
No Package Lifitng Specialist (i U&I) Lifitng Specialist (EPCC)
1 HSPT Name Name

2 WCT Name Name


2 WCT Name Name

3 GADANG 301 Name Name

4 GADANG 402 Name Name

5 KQKS Name Name

6 PBJV Name Name

7 ANSAH Name Name

8 WCT 0302/0303 Name Name

9 MITRAJAYA Name Name

10 CPP 1401 Name Name

11 ELECO Name Name

12 CHEC Name Name

13 SINO TCC 306 Name Name

14 MMHE Name Name

15 BINAPURI Name Name

16 WCT 1702 Name Name

17 MUDAJAYA 1703 Name Name

18 KNUSFORD Name Name

19 MUDAJAYA 1900 Name Name

20 CPP 806 Name Name

21 CPP 804 Name Name

22 SPM 1001 Name Name

23 SPM 1002 Name Name

24 SWISS PTIS Name Name

25 JMGP Name Name

26 MIE Name Name


26 MIE Name Name

27 SMGA JV Name Name

INFRASTRUCTURE AND OFFSITE


No Package Lifitng Specialist (i U&I) Lifitng Specialist (EPCC)
Package 16A
1 Name Name
VMW
Package 16B
2 Name Name
Loh & Loh
Package 20C1
3 Name Name
WCT
Package 20A3
4 Name Name
MEB
Package 20A4
5 Name Name
SIISB
Package 12B
6 MCD(SPJ) Name Name

Package 500
7 Name Name
SYS Menta
Package 0101
8 Name Name
HLM
Package 0403
9 Name Name
MCSB
fitng Specialist (EPCC)

fitng Specialist (EPCC)

MUHAMMED ASHRAF

fitng Specialist (EPCC)


SITE
fitng Specialist (EPCC)
PETCHEM
Lorry Crane
No Package No
Registration Number Operator name

a. AJV3535 ISMAIL BIN A.RAHMAN


b. JNM 325 MOHD SAIFUL BIN MAT
Package 7
1 c. KEE 3931 MD AZIZ BIN MOHAMED JIM
Tecnimont
d. JRC 9112 Kato Anak Saka
e.
TCHEM
Internal VoC
Assessment type
Done Date VoC Card Issued
Practical Theory
NO NO Practical Theory
NO NO Practical Theory
NO NO Practical Theory
NO NO Practical Theory
Practical Theory