Sei sulla pagina 1di 2

ITP

End-to-End Implementation of a Product Lifecycle


Management Solution
Client profile improving production traceability The multi-year transformation was led by
and globalization without sacrificing ITP business and IT leaders, and the project
ITP is the ninth largest manufacturer product quality. ITP leaders knew that team included experts from Siemens who
of aviation engines in the world. With tighter integration of Engineering and provided support for its Teamcenter® &
major centers of operation in Spain, Manufacturing would be critical to NX™ solutions, as well as Accenture PLM
UK, Malta, USA, Mexico, and India, the achieving all these goals, and that more process, data migration, and SAP
company is known for its high-quality advanced product lifecycle management integration professionals. Together, the
and environmentally friendly products (PLM) capabilities would enable success. team embarked on a journey to integrate
as well as its employees´ talent and ITP’s Engineering and Manufacturing
commitment to achieve excellence and functions accomplishing this goal in five
client satisfaction. How Accenture helped distinct steps (see Figure 1).

ITP chose Accenture to collaborate with • PLM benchmark: Functional diagnosis


Business challenge the company on a PLM transformation and market analysis
initiative. Accenture was selected • PLM processes reengineering: End-to-end
In 2010 the company decided to refine and primarily due to its global PLM network operating analysis for Manufacturing &
align its strategic goals and supporting and alliances needed to deliver high Engineering. Harmonization to create
operations to fuel top and bottom line quality services and solutions across the the “To-be” picture
improvements while better responding to globe. In collaborating with ITP to design, • PLM Manufacturing implementation and
customers’ changing demands. The pilot and implement new PLM processes SAP integration
updated strategy focused on reducing and solutions, Accenture leveraged the • PLM Engineering implementation and
time-to-market of products, maintaining experience of Accenture Technology Labs, SAP integration
engineering efficiency and optimizing the Strategy practice from Accenture • Data migration from any legacy systems
plant productivity, as well as improving Consulting, the firm’s PLM Center of (including Windchill)
product traceability and quality, even Excellence (Bangalore), PRION Group
as operations became more globalized. (now part of Accenture), Avanade, and
ITP’s 2010-2015 business plan called for Accenture’s ongoing collaboration with
tripling production rates, while also Siemens.
“The role of PLM software is • Reducing delivery delays About Accenture
considered key. All of the information • Increasing new sales opportunities by
can be traced using PLM software, improving the qualification processes Accenture is a global management
which allows us to track and monitor • Improving Engineering capabilities and consulting, technology services and
it through the company so we can Program Management visibility outsourcing company, with approximately
achieve our goal, which is to produce • Enabling higher percentages of 319,000 people serving clients in more
the most competitive, efficient design commonality of parts, which reduces than 120 countries. Combining
at the lowest possible cost.” inventory and related costs unparalleled experience, comprehensive
Ignacio Mataix (CEO of ITP) capabilities across all industries and
Over the next few years, ITP aims to business functions, and extensive research
“squeeze the value” of the PLM platform on the world’s most successful companies,
High performance delivered to achieve even higher efficiency levels. Accenture collaborates with clients to
Goals include increasing reuse of help them become high-performance
Accenture was able to transition ITP Engineering Detail Drawings for businesses and governments. The company
from using multiple isolated systems Manufacturing and Engineering BOM generated net revenues of US$30.0 billion
to having an integrated PLM platform for Manufacturing BOM, and also for the fiscal year ended Aug. 31, 2014.
across processes and systems in a matter generating an ERP warning when Its home page is www.accenture.com.
of months. Teamcenter & T4S was up drawings or BOMs are modified to
and running in both Manufacturing reduce these instances.
within eight months and Engineering in
14 months, exceeding ITP’s expectations “Our vision was to have a single
and original timetable. source of truth where users could
access the right data in a consistent
The end-to-end PLM transformation is and harmonized environment. Accenture
continuing and on track to enable the was the company chosen by us to make
strategic and operations goals identified. this PLM journey. Now the PLM
Current successes include: business benefits are a reality, and we
• Having greater agility to make design are capturing them continuously”
modifications and new product Carlos Tarazona, PLM Project Manager, ITP
introductions
• Reducing non-quality costs (scrap and
rework)

Figure 1: ITP End-to-End PLM Transformation Journey

Windchill Data Migration

Phase 0.1 Phase 0.2 Phase 1 Phase 2 Phase 3


Benchmarking PLM PLM Processes PLM Manufacturing PLM Design Overall Data
Reengineering Implementation Implementation Migration
6 months 8 months 8 months 14 months 18 months
• Functional diagnosis of • End-to-end operating • Detailed definition of • Detailed definition of • Migration priority 1
Manufacturing and processes analysis for Manufacturing and Design Engineering and (9 Programs)
Engineering processes Manufacturing, Engineering, Engineering processes Assembly processes • Migration priority 2
• Market analysis and Design Engineering and • Functional and technical • Functional and technical (17 Programs)
comparison of COTS PLM Assembly design of the solution design of the solution • Migration priority 3
tools and final decision • Harmonization • Solution build, ERP, • Solution build, ERP (13 Programs)
• To-be processes proposal integration and go-live integration, tests, and • Migration priority 4
• Data migration TC2005 > go-live (75 Programs)
TC Unified • Training and support
• Training and support • Data migration Windchill >
TC10.1 (3 critical programs)
• Data model and processes
alignment with PLM
Manufacturing and MES
Copyright © 2015 Accenture
All rights reserved.

Accenture, its logo, and


High Performance Delivered
are trademarks of Accenture.

Potrebbero piacerti anche