Sei sulla pagina 1di 10

Muhammad Mazhar

Email:mazhar651@yahoo.com

Cell #:00923446604577

Skype:mmazhar651

OBJECTIVE:
Want to excel in the field of Electrical power Engineering and to work with a team
of Professionals having sound foundation & dynamic environment.

SUMMARY:
(Aug 2016 to present)

Solar System Design and Installation Engr at Adeco Solar (KSA)

(July 2013 to Aug 2016)

 Working as a solar system design engineer in Nizam Group of Companies


pvt Ltd.Making valuable industrial customers and supervise the installations
of solar system.Energy auditing and design a complete technical solution for
the solar energy projects which includes sizing of solar panels ,charge
controllers ,inverters , battries ,wires and essential accessories.
 Key responsibilities are system designing, system installation, system
monitoring, troubleshooting and site surveys.
 Great experience in commissioning and auditing on grid,off grid and hybrid
solar power plants.
 Off Grid solar solutions(AC/DC) for rural areas.
 On grid solar solutions for industrial projects.
 Hybrid solar solution for domestic applications.
 Solar water pumps(AC/DC).Solar solutions for security system and
telecommunications.
PROJECTS

100MW Qaid E Azam Solar park Pakistan

I had been working at Qaid E Azam solar park at Bahawalpur pakistan,this project
was announced by the punjab Government,it has to be enhanced upto 1000MW.
I was appointed by our company(Nizam Energy) and the responsibilities given to
me as,
 EPC(Engineering procurement and construction) was given to our company
as first phase.I did all the work very comprehensively relating to EPC .
 Daily evaluation and analysis of operational plant data through remote
monitoring.
 Preparation of report of current yield and weather data
 Preventive inspection and maintenance of system components according to
manufacturer’s specifications.
 Documentation of events and measures.
 Provision of small parts and operating material.
 Function check after fault message is received.
 Immediate start of fault removal measures.
 Analysis of interruptions and incidents.
 Supply chain management for spare parts i.e.modules,inverter,cabling and
mechanical components.
 Documentation of plant energy output and system availibility.

500 KW Solar Off Grid System at Kamal Group of Companies.

The generation of 500 KW solar system is directly linked to the electrical


appliances through UPS.A huge amount is being saved by this solar system in the
sense of electric bill.The system was installed and executed perfectly.

50 KW Solar Hybrid System in Capricorn textile factory.

A solar hybrid system was installed in Capricorn factory of a capacity of 50 KW


with battery bank of 1950 Ah.All the printing and cutting machines were powered
by this solar system.Around 300 units per day were being generated by this solar
power plant.
35 KW Solar Hybrid System in JK Group.

A capacity of 35 KW solar system was installed in JK Group in Faisalabad.The


system was installed and executed perfectly,A huge amount of money is being
saved by this solar system in the form of electric bill.The inverter of east company
was installed over there with a battery bank of 6000 Ah.

25 KW Solar Hybrid System in JK House.

In JK house a solar system of 25 KW was installed with the help of a battery bank
of 4500 Ah.Around 150 units were being saved by this solar system per day.All the
house hold electrical appliances are power by this solar system.

25 KW On Grid Solar System at Mehmood Group of companies.

A solar system of capacity 25 KW was installed in Mehmood Group at Multan with


the help of SMA inverter.This system in inserting a power of 150KWh in the main
grid.The system was installed and executed perfectly.

10 KW On Grid Solar System at Islamabad NGO’s office.

10 KW solar system was installed at NGO’s office at islamabad.Infini companies


inverter was installed with the help of candian solar panels.This system was
installed and executed perfectly.Energy meters were installed to monitor the
power generation of this plant.
25 KW Solar Hybrid System at Interloop Farm House.

At interloop farm house a solar system of capacity 25 KW was installed with the
supported battery bank of 8000 AH.Three inverters of out back company was
stacked together to support a system of 25 KW.Mat 3 was installed to monitor the
system.

Solar tubewell installation with 15 HP Submersible pump.

A solar tubewell was installed in chiniot district with the help of 15 HP


submersible pump of Lorentz company.The out let delivery was of five inches and
the flow was around 12 lac litter per day.PV of capacity 15 kW was Installed over
there.

Solar tubewell with surface pump of 10 HP.

At puri farm house a solar tubewell was installed with the help of 10 HP Surface
pump with out let delivery of 5 inched.The flow of water was around one lac litter
per hour.All the fields were irrigated by this solar tubewell.A capacity of 10 KW
solar plates were installed over there.

(Aug 2012 to July 2013)

 Worked as an electrical engineer in Nishat Group of Companies at


Faisalabad.Key responsibility was energy management in the factory,
maintenance and control of power house of the factory.
 Good understanding of electrical drawing ,planning of projects, erection
and maintenance.
 Both practical as well as theoretical knowledge of different electrical
instruments.
 Working more efficiently and productively so that max output comes.
 Regular analyzing of organizations electrical load consumption with ratios
and analysis.
 Daily maintain the power consumption report.
 Estimate cash flow projections for projects.
 Analysis of electrical consumption and consumed demand.
 Handling of electrical load as per requirement.
 Prepare and review engineering plans, design and circuit diagram for
projects.
 Identify and purpose improvement plans, design and circuit diagram for
projects.
 Good knowledge and experience about power generation, transmission,
distribution and their control.
 Designing of cables and breakers for an electrical system and projects.

ACADEMIC RECORD

BACHELORS IN ELECTRICAL POWER ENGINEERING

Institute: CIIT ( Comsats Institute of Information and Technology Abbottabad )


Pakistan

Passing Year:(August 2008-July 2012)

HIGHER SECONDARY SCHOOL CERTIFICATE

Institute: BISE Lahore

Passing Year (Sep 2005-July 2007)

SECONDARY SCHOOL CERTIFICATE

Institute: BISE Lahore

Passing Year (June 2004)


CERTIFICATES
Pakistan Engineering Council (Registered Engr, Elect/35427)

Got Certificate in Communication Skills.

MAJOR COURSES (ENGINEERING)

 Power System Protection


 Power System Analysis
 Power system operation & control
 Power Electronics
 Electric Power Generation
 High Voltage Engineering
 Electric Power transmission, distribution & utilization
 Microprocessor & Microcontroller based design
 Electric Machines
 Electric Measurements & Instrumentation
 Electric Circuit Analysis

FINAL YEAR PROJECT


Solar Power Generation for Programmable Electronic Notice Board with the
Design of Solar Charge Controller, Inverter, Buck Converter and Boost Converter.

COMPUTER SKILLS
C/C++,AutoCAD, Multisim, Electronic workbench, Matlab, Microcontroller
AT89C51 and 89C52.
PERSONAL SKILLS

 Committed to work.
 Have good presentation skills.
 Have good written & verbal communication.

LANGUAGE

 English
 Urdu

HOBBIES AND INTEREST

 Research oriented activities


 Travelling
 Watching documentaries
 Participating in every type of games.
 Internet surfing
 Corresponding with peoples

PERSONAL INFORMATION

Father’s Name Muhammad Riaz


th
Date of Birth 28 Dec 1989
ID Card # 3540257048313
Present address House # 05 Aqsa Town Millat Road Faisalabad
Religion Islam
Martial Status Single

REFERENCE
Reference will be provided on demand

Potrebbero piacerti anche